Grinding Glass Spheres

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
1000 Kilograms kg
Supply Capability:
500 Tons per Month kg/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Detailed Product Description

Grinding Glass Spheres

strong hardness

new glasses for material

Round ratio above 85%

ISO, CE

Grinding Glass Spheres

1.JPG

III. Hardness

HV, Loading 100g, residence time: 12s

the average of five point: 5270Mpa

standard

code(HV): ≥ 5000Mpa

IV. percentage of damage

1. test condition

(1)shot peening Target:Thickness:1.2mm (steel plate)

(2)air pressure of the nozzle:0.3Mpa

(3)the space between the nozzle and the Target: 200mm

(4) time of shot peening:5min

(5)the diameter of the glass beads: 250 microns

(6)Gross Weight of the tested glass beads: 1020g

(7) the weight of the damaged

glass beads after shot peening: 1.02g

2.percentage of damage of the test : 0.1%

V. Application

They are mainly used for the disperser, grinding media of industries, such as coloring, paint, ink, coatings, resins, chemical engineering, with the advantages of smooth surface, even size, high hardness, good chemical stability. Thanks to the characteristics of heat-resistant, wearable, compression strength, the filling-type bead could be used to improve glass fibre reinforced plastic, rubber, and so on.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What about a dry digger, a pile driver? How much money? What's the speed?
2, how much depends on how much you need the brand of the machine.3, Shanghai Zhonglian second-hand excavator market has a large and small brand excavator, you can look at.
Q:Flood piling machine a lot, why not see changkai dike breach after piling piling machine?
The width of 340 meters, so excited water, so a wide breach, the water is so deep, the boat stopped, so how long pile up? Where is the man standing? People have no place to stand. How can the pile driver be put into the wooden pile? Under such circumstances, even if there is a pile driver, what's the use? This is the changkai dike breach after there are no reasons for piling piling machine.Answer to your supplementary question:Closure of crevasse is a system engineering, it should include: pile, piling machine, operating platform, platform connection between the anchor pile, etc.. Not only one or two of them can be done.The following is the Liyang Ding Ding Mini piling equipment factory produced dragon dragon brand dam information, hoping to help answer your questions, if you do not see clearly, you can click on the map to see the original picture.First, dragon Ding card dam mapSorry, I'm only level one now. I can't upload pictures. If necessary, go to the website of the new tripod piling equipment factory in LiyangTwo, the Dragon Dingpai dam burst when the working drawing of pluggingThree, dragon card blocking effect after the burst dam closure graphWhen all of the pile are good, can seal the 90% water, finally burst all filled with debris, if there is enough manpower, also can be in front of the pile at the same time, immediately behind the embankment filling. Crevasse sealing is completed, will pull out all the repeated use of pile.
Q:We have bought a pile driver wylong machinery,
Certainly money ah, now people are selfish, just want to make money, Matlock machine good, I also encountered such a thing.
Q:About the problem of foundation piling density? Thirty
Under normal circumstances, only in the bottom of the structural column to the base of the force transmission area, piling, three layers of self building (small span), each column at the bottom of the general arrangement of 1-3 piles, but the depth of the pile should be determined according to the local geological conditions.
Q:Is there a construction site for solar powered PV pile drivers?
Not necessarily. The main aspect is related to the structural characteristics, height and load of the proposed building, and the other major aspects are geological conditions, such as formation, geotechnical properties, strength, distribution, depth of burial, etc..
Q:HD50 cylinder type diesel hammer, HD62 hammer, HD80 hammer, walking pile driver, crawler type pile driver
HD50 refers to the 5 tons of diesel pile hammer; HD62 refers to the 6.2 tons of diesel pile hammer; HD80 refers to the 8.2 tons of diesel pile hammer; walking pile driver is walking pile frame supporting diesel pile hammer general "walking hammer" or "walking type diesel pile hammer" or "walking type diesel pile hammer";
Q:What is a loading type road pile driver?
Loading type road pile driverThe utility model relates to a loading type road pile driver, which has the advantages of high efficiency and punching efficiency, is 1.5 times as much as that of a traditional pile driver, and has a special driving room. Ability to work at night and on rainy days. The power consumption is the same as that of a general pile driver. He looks very handsome, too.Turn left and turn right |From the picture we can see briefly that the loading type road pile driver is much better than the general road piling machine and looks better. The operating room is not as simple as this.
Q:The ground site must be driven by a pile driver
Look, what's your base like?... If it's high-level. Just use it... Now the general use of super flow too... There are also not common are prefabricated piles, artificial dig hole pile, pipe sinking filling pile, spiral bored pile, powder spray pile.
Q:Why should the pile foundation be excavated after the pile driving?
Pile foundation construction shall be checked and accepted before earthwork construction!
Q:AMD pile driver FX-8350 with what motherboard good?
AMD 8350, the motherboard recommended using 990X and 990FX, so that CPU can play a good performance.Can be said to be the king of the game. Graphics card or 7870 of the bar, two of the game graphics do not mistake.
The company has wide experience and offers a range of equipments, expertise and services to the road marking industry. The products range from road marking equipments, reflective materials, pile driver, traffic signs, traffic barrier as well as undertaking turnkey projects. Our company will be further committed to contributing to the designing, R&D, manufacturing, and providing high quality products, customer care, prompt services as well as strong technical support to both domestic and overseas customers. .

1. Manufacturer Overview

Location Liaoning, China (Mainland)
Year Established 2000
Annual Output Value
Main Markets North America
South America
Eastern Europe
Southeast Asia
Africa
Mid East
Eastern Asia
Western Europe
Company Certifications ISO:9001:2000

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage 31% - 40%
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size: 5,000-10,000 square meters
No. of Production Lines 6
Contract Manufacturing OEM Service Offered
Product Price Range