Galvanized Scaffolding Internal Joint Pin Lock Props Pin
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10000 pc
- Supply Capability:
- 10000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Brand Name: | AJ | Model Number: | LJB-64 | ||
material: | Q235/Q195/Q345 etc | certification: | BV | OEM: | yes |
Nature: | non-magnetism | Color: | as per your required | Surface: | pre-galvanized |
diameter: | 48.3 | application: | building etc |
Packaging & Delivery
Packaging Detail: | in bundle ,in bulk or as your request |
Delivery Detail: | within 15-20 days after the confirmation |
Specifications
joint pin
1.High quality and competitive.
2.easy to install and dismantle.
3.material:Q235 etc
4.the diameter:48.3mm
Product Description
1,Truss type:
spigot truss:100*100mm;290*290mm;300*300mm;400*400mm;500*500mm;520*760mm;600*1000mm
Screw truss:200*200mm;300*300mm;400*400mm;450*450mm;400*600mm;500*500;500*600mm;600*760mm;600*1000mm
2,Truss tube:main tube :50*3.0mm;brace tube:30*2.0mm,25*2.0mm,20*2.0mm
3,Truss material:6082-T6/6061-T6
4,Truss shape:ladder/triangular/square/circle/fold
5,Truss length:0.5-4.0m,ODM and OEM offer
6,Truss connection way:spigot type and screw type
7,Truss chain hoist type:hand chain hoist and electric chain hoist
8,Truss lift tower system:sleeve block,topsetion,hinge,basement,lock outrigger,also can make by your requirement.
- Q: Scaffolding installation and precautions?
- When the structural layer is attached to the wall, the wall column, the vertical horizontal rod and the transverse horizontal rod are set up immediately after the erection of the structure.5, closed with a step horizontal bar frame must turn around the hands all around the circle, with a right angle fastener and the inner and outer post fixed.6, the horizontal horizontal pole of the double row scaffold should not be greater than 100mm from the wall to the wall.7, when the scaffolding operation of the wall of the two steps, should take temporary stability measures, even after the wall pieces can be removed before the erection.
- Q: The latest JGJ130-2011 construction fastener type steel pipe scaffolding safety technical specifications, schedule A.0.2 what role, how to correctly use it?
- Schedule A.0.2 role: the calculation of scaffolding, the need to calculate the bearing capacity of the scaffolding
- Q: Every time someone in medieval times was murdered by the beheading a new scaffold was built for the next prisoner.
- Well that's not entirely true; they didn't ALWAYS built a new scaffold. Probably movies let you think so but that was not the case.
- Q: Find the demolishing scheme of scaffold
- 11.2.3 when the scaffold is removed to the lower part of the last long pole height (about 6.5m), should be in the appropriate position to set up temporary support reinforcement, and then dismantle the wall;11.2.4 when the scaffold is divided into sections and sub sections, the two ends of the scaffold without dismantling shall be provided with the connection of the wall and the lateral bracing.
- Q: At 16 I took my bros 16 gauge piercing needle and pierced my left cartilage and it didn't hurt at all.... and I have a tattoo as well and I laughed through it. So pain isn't huge when it's a small amount.
- its like 37 million times worst! its really painful [Pro-Sarcasm?]
- Q: Scaffold removal should comply with those requirements......
- Demolition safety requirementsThe removal order should be 1 layers from the top down, at the same time no homework.2 remove the frame rods and connectors, springboard and other materials, should be used in rolling, prohibited throw down. The foot lever and remove the plate have been demolished, should be disposable.3 all the pieces of the wall should be removed from the scaffold layer by layer, it is strictly forbidden to take the whole or a few layers of the demolition of the wall and then dismantle the scaffolding; the demolition of the height difference should not be greater than two steps, such as the height difference is greater than the two step should be added to strengthen the wall.4 when the scaffolding removed to the lower part of the last long steel pipe height, according to the needs of the site in the appropriate position to take temporary support reinforcement, after the demolition of the wall.
- Q: What are the common rules for calculating the amount of scaffolding works
- According to the wall masonry scaffolding (single) vertical projection area calculation with square metre.Scaffolding, without deduction of door and window opening, air ring, vehicle channel, deformation joint area. At the same time, the height of the same building is different, according to the vertical height of the building.
- Q: Specific requirements, the civil code is what ah! Thank you very much, I am lack of this kind of information, I hope you can tell me which of the following
- Calculation basisScaffolding input: for the template support part of the steel pipe material in accordance with the 1.5 layer of the amount of consideration: the amount of external scaffolding steel pipe in accordance with the full closed scaffolding consideration; safety net in accordance with the external scaffolding full consideration.
- Q: I really want a scaffold piercing and I can pay for it, I get good grades, I do all the chores I have to do, I spoke to them calmly and everything. Yet they still won't let me. My dad said that I will be grounded forever and everything but last time I got grounded, I went to a party the next day so what should I do?
- im talking from experience-scaffold piercings are VERY painful, and take a long time to heal. so there wouldnt be any way you could take it out to hide it for a good few months! it really isnt a great piercing to get unless you can openly look after it properly. anyway you shouldnt disregard what your parents say...i know thats what you want to do!lol really though, its very painfull!
- Q: Who knows how much the amount of the main material used to take one square metre of conventional double row scaffolding (within 12 meters). For example, how many kilograms of steel pipe, the number of fasteners. The content of the quota is low, I am also very confused, to the completion of the work of the scaffolding rental fees. Very urgent, I hope to know the user to answer. Accident report
- The following is a quote fragment: who knows how to use a square meter of the main raw material of double row scaffolding
Send your message to us
Galvanized Scaffolding Internal Joint Pin Lock Props Pin
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10000 pc
- Supply Capability:
- 10000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords