• Flat-top Tower Crane QTP80(TC5511) with Reasonable Price for Sale System 1
  • Flat-top Tower Crane QTP80(TC5511) with Reasonable Price for Sale System 2
  • Flat-top Tower Crane QTP80(TC5511) with Reasonable Price for Sale System 3
  • Flat-top Tower Crane QTP80(TC5511) with Reasonable Price for Sale System 4
  • Flat-top Tower Crane QTP80(TC5511) with Reasonable Price for Sale System 5
  • Flat-top Tower Crane QTP80(TC5511) with Reasonable Price for Sale System 6
Flat-top Tower Crane QTP80(TC5511) with Reasonable Price for Sale

Flat-top Tower Crane QTP80(TC5511) with Reasonable Price for Sale

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
100 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Structure of Tower Crane

1) TC5013A tower crane is one of the key product of cnbm company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

 

2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected; The max. attached height can reach 140m.

 

3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

  

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.

 

5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator.


Main Features of Tower Crane

1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, suitable for the group of tower cross homework.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

Tower Crane Images

Flat-top Tower Crane QTP80(TC5511) with Reasonable Price for Sale

Flat-top Tower Crane QTP80(TC5511) with Reasonable Price for Sale

Flat-top Tower Crane QTP80(TC5511) with Reasonable Price for Sale

Flat-top Tower Crane QTP80(TC5511) with Reasonable Price for Sale

Flat-top Tower Crane QTP80(TC5511) with Reasonable Price for Sale

Flat-top Tower Crane QTP80(TC5511) with Reasonable Price for Sale

Flat-top Tower Crane QTP80(TC5511) with Reasonable Price for Sale

Flat-top Tower Crane QTP80(TC5511) with Reasonable Price for Sale



Tower crane Specifiction

Flat-top Tower Crane QTP80(TC5511) with Reasonable Price for Sale

FAQ of Tower Crane

1.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

2. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

3.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.  


About CNBM


CNBM is the largest state owned company under central government of China that deals with building materials and construction and industrial equipment.
We are among Fortune Global 500 and No.1 in China building materials industry. We have our own factory, logistics system, e-business platform, and oversea warehouse. Our products meet international quality standard.
For more information about us you can go to our official website icnbm dot com and okorder dot com.

Q: What are the characteristics of a tower crane?
Two, according to the structure characteristics of the boom can be divided into the pitching amplitude boom (boom) and trolley jib tower crane (arms).Luffing jib tower crane luffing jib by lifting does not achieve the amplitude, the utility model can give full play to the effective height of the boom, simple mechanism.Trolley jib tower crane is installed on the level of the boom on the track trolley achieve amplitude, the utility model has the advantages of large amplitude range, trolley can near the tower, can load amplitude, the shortcoming is: the boom stress on the structure of complex, high requirements, and the boom and the car must be in the building the upper part of the spire, the installation height should be higher than the roof of buildings 15-20 meters.Three, according to the turret structure, the rotation mode can be divided into lower slewing (turret rotation) and upper slewing (turret not slewing) tower crane.Under the rotary tower crane slewing bearing, balance weight mechanism are arranged on the lower end of the main tower, its advantages are: less bending, low gravity, good stability, convenient installation and maintenance, the disadvantage is the higher requirement to the slewing bearing, installation height is limited.The slewing tower crane is characterized in that the slewing bearing is balanced and the main mechanisms are arranged at the upper end, and the advantage of the utility model is that the lower part of the tower body can be simplified, and the lifting and the adding of the joint can be simplified because the tower body is not turned. The disadvantage is: when the building exceeds the tower height, due to the influence of the balance arm, limit the slewing of the crane, at the same time, the center of gravity is higher, the air pressure increases, the weight increases, so that the total weight of the whole machine increases.
Q: For example, self lifting tower crane mounted to 10 meters or 2 floor use. How do you install the third floor now? Is it necessary to remove the crane?. Then add the length of the steel frame on the base seat, and then install the crane above him If so, then 2 cranes are needed. But how is another crane installed?Ask you experts on the construction site of self lifting tower cranes how to install?. Do you use hydraulic jacks like car jacks?
Looking for technical personnel to install, you fuck what heart?.
Q: A crane that docks is capable of doing 550 J of work. How high can it lift a load that weighs 45N?
A crane can lift it's rated limits to full extension. Provided 45N is within it's rated capacity, it can lift it as high as the crane can lift items.
Q: this wind speed refers to that height of wind speed?
This is not on the project department climbed to tower crane to measure wind speed, regardless of height, is listening to the local meteorological station forecast, more than five winds, should stop working.
Q: I read Maggie: A Girl of the Streets in eleventh grade and I wonder if the author, Stephen Crane, was the same Stephen Crane that married Lana Turner.
hah ha i'm in your class too :) This project sucks... and I still haven't done it! I have to tonight..
Q: Construction tower crane operator certificate expires, how to verify?
Six, related requirementsEach enterprise shall, according to the notification requirements, arrange the personnel engaged in the work of this unit, and invite every unit to earnestly examine and clean up, and those who have not obtained the certificate will sign up for the training. The certificate into the industry qualification management, obtain the job qualification certificate, can engage in the corresponding work, and as an important basis for certification.Seven, registration requirements and locationsStarting from now on, please bring your ID card copy and one inch registration photo for you when you sign up for two. Fill in "Chongqing construction crane operator qualification table", the applicant's employer to the District Construction Committee, post training center application.Contact: He Zongfang, Hu Baofeng, zip code: 401120Tel: 67376688 Fax: 67800098E-mail:ybjsgp@163 Http://www.cqybjs (Yubei construction information network)Hereby notifyChongqing Yubei District construction post training centerFebruary 20, 2008
Q: She was editing some of his writings. She was appalled(prim proper Nebraska gal) by his lack of punctuation. He said he didn't have the time for it. He was right. Shortly after he died of TB. Do you ever feel that time is your enemy; that you have only so many years to make a difference?
Due to my present situation, I have thought about this many hours. Many days. Many months. Time, or the lack of it, is generaly considered the enemy. But there are situations that the less of it can be a blessing. None of us can ever know which we will wish for. Until that time comes.
Q: I'm into urban exploration and basically the one thing I haven't done is climb a crane. I don't actually know where one is that I could climb, but I definitely will do it someday. I'm just wondering how illegal it would be? Also, don't give me any it's not safe bull, I'm perfectly confident in my abilities and ready to accept the consequences if I get caught.
Unless you have permission from the owner, it would be considered trespassing.
Q: across the street from my work, there are three big cranes. It seems like they just popped up over night. anyone know how they get them built?
I okorder you may find an article mate
Q: This has nothing to do with travel, I'm just curious. I hate it when the news doesn't follow up on stories they focused on earlier. Does anyone have a status update on that crane that was swaying in the wind during Sandy?
My friend, that is a good question. According to the latest news conference from the Mayor, the crane's boom arm is secured to the structure. However, West 57th Street between Broadway and 7th Avenue is closed until farther noticed. In addition, the 57th Street-7th Avenue subway station on the N, R and Q Line is closed and trains are bypassing the station in both directions, according to the MTA. Good luck Native New Yorker

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords