Escalator Power Lock

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
10 Pieces pc
Supply Capability:
8000 Pieces per Quarter pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:


Packaging details: As you required! & Delivery


a.Special used for escalator


c.MOQ:1-10 pcs

d.Good quality


We can provide you all kinds of escalator lock.


1.We  are able to supply you a large variety of elevator components/ escalator parts of different

  brands(a selection of more than2,000 kinds).

2. We can guarantee the product high quality, delivery time and good service.

3.We are able to manufacture according to your specific instructions and help you select appropriate

  product and specification for you.

Looking forward to your inquiry! 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the elevator parts?
Electrical or mechanical
Q:Elevator three pieces
Usually said that the elevator three pieces, which is the three pieces? Not that the elevator is the four major space + eight system more...
Q:What parts are inside the elevator control cabinet?
This is the elevator control cabinet inside the power module, is 220V AC power into 12V or 24V DC module. It is if the fault helium ingot melon raspberry cover every drowning fine elevator can not work.
Q:Elevator hoist inside the iron frame how to build, that is how to put the parts to the top of the
Do you know that there is a hook on the top? Bearing capacity is generally 2 tons. At first start the bottom of the car. Then people stand on top. Pull up the hook. People to pay ridge barnyard jealousy Huan half of the newspaper only began to install rails. Ring beam and so on. The
Q:The elevator has a certain useful life
Have! forced retirement age of the elevator seems to be 15 to 25 years
Q:Elevator overweight crushed what parts are broken need to repair how much money
Generally weighing off bad, not much money, generally more than 100
Q:What is the highest part of the elevator car roof?
The engine room elevator is the guide wheel, the highest part of the machine room is the fence.
Q:What are the contents of the installation of the elevator floor door components?
Elevator floor installation components Contents: 1 with a vertical wall of the installation of the plane 2 to adjust the plane of the wall connector, 3 fastening the connection to set the slot with the adjustment of the surface with the adjustment plane in conjunction with the door joints Interconnection. 4 is provided on the wall mounting plane and the adjustment plane of the wall connection. The connection slot for the provision of the fastening connection and the longitudinal direction is perpendicular to each other. And the length of the connecting slot on the adjustment plane connected to each other is also perpendicular to each other, and the length of one of the slots is perpendicular to the wall mounting plane The
Q:Inside the elevator how to do leakage
If the bottom pit leaking, they dry, and see the next day there, if you continue to leak, it can only do waterproof, and often leaks will lead to rust inside the elevator parts corrosion, The madness is too easy to damage.
Q:The elevator does not need to be sealed
If it is emergency electric operation, need to block the safety gear switch, gripper switch (asynchronous machine), speed limit switch, upper and lower limit switch, the buffer switch
Our products are more than 10000 items and the inventory is more than 5 million pieces. We strive to survive on the basis of quality and credit. Our mission is "Customer Orientated, Service First". Welcome new and old friends to visit our website or contact us directly!

1. Manufacturer Overview

Location Beijing,China (Mainland)
Year Established 2009
Annual Output Value US$2.5 Million - US$5 Million
Main Markets South America; Southeast Asia; Africa; Oceania; Mid East; Western Europe
Company Certifications ISO 9001:2000

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage 11% - 20%
No.of Employees in Trade Department 6-10 People
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range