Elevator Button
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 100 Pieces pc
- Supply Capability:
- 50000 Pieces per Month pc/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Detailed Product Description
-long life
-Good looking
-High quality
- Q:Inside the elevator how to do leakage
- See is not the pit of water, and to dry Yeah, or else will burn the circuit board, hope to adopt
- Q:This is a part of the elevator control cabinet, I would like to know what each of the components marked below, and its role! More
- The quality of this electrical cabinet is really not very good.
- Q:The elevator warranty period is in accordance with the Ministry of Construction in 1995 issued the project (1995) No. 167 "on the strengthening of the elevator management of the Interim Provisions Implementation Rules" provides: the newly installed elevator quality warranty period from the date of acceptance of one year, Or goods to the site for 18 months basis? Or on the basis of the 25th executive meeting of the State Council on January 10, 2000 (Decree No. 279 of the State Council of the People's Republic of China on January 30, 2000) "Regulations on the Quality Management of the Project" In the provisions of the electrical pipeline, water supply and drainage pipes, equipment installation and renovation works the minimum warranty period of 2 years? More
- According to the Regulations of the Ministry of Construction on the Implementation of the Interim Provisions on the Strengthening of Elevator Management issued by the Ministry of Construction in 1995 (1995), the newly installed elevator warranty period is one year from the date of acceptance or delivery to the site 18 months as the basis, this is the only known for the elevator warranty period of national documents. Of course, you can also supply and demand consultation between the two sides agreed to extend the agreement with the agreement to extend the elevator, if no agreement, in accordance with the provisions of the Ministry of Construction No. 167 provisions.
- Q:What are the contents of the installation of the elevator floor door components?
- Elevator floor installation components Contents: 1 with a vertical wall of the installation of the plane 2 to adjust the plane of the wall connector, 3 fastening the connection to set the slot with the adjustment of the surface with the adjustment plane in conjunction with the door joints Interconnection. 4 is provided on the wall mounting plane and the adjustment plane of the wall connection. The connection slot for the provision of the fastening connection and the longitudinal direction is perpendicular to each other. And the length of the connecting slot on the adjustment plane connected to each other is also perpendicular to each other, and the length of one of the slots is perpendicular to the wall mounting plane The
- Q:The elevator does not need to be sealed
- An old cell phone, logo can not see
- Q:What is the most valuable part of the elevator?
- Is the motherboard and inverter
- Q:Hello there. I also encountered the same problem with you. Start without water. Forget the faucet. And then came to the elevator to burn the car to take care of the amount of money. The property makes me lose money. But what did you do? More
- Pay more, less directly to him, after all, who is wrong, my mind is less than 1,000 yuan
- Q:Elevator overweight crushed what parts are broken need to repair how much money
- Check the overload switch
- Q:I am now the company elevator to find its import parts are made, I should be to which government departments to add to the question: the elevator company which broke the law more
- First find the city quality supervision bureau to find consumer associations or the City Administration for Industry and Commerce
- Q:What parts are inside the elevator control cabinet? what's the effect?
- Power supply, the exchange into DC and buck the device
We have expert designers and managers and set up effective quality control system and achieved ISO9001 certificate for quality management system. We strictly control the product quality from design, manufacture, inspection, installation to service according to ISO9001 standard.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Elevator Button
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 100 Pieces pc
- Supply Capability:
- 50000 Pieces per Month pc/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
New products
Hot products
Hot Searches
Related keywords