Elevator Micro Switch

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
30 Pieces pc
Supply Capability:
1000 Pieces per Month pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Packaging and delivery: As you required!


a,Using for elevator,lift


c,MOQ:1-10 pieces

d,Different size&specific .


1.Various types and specifications are available following customer's requirement.

2.We are able to supply you a large variety of elevator components/ escalator parts of different brands (a selection of more than2,000 kinds).

3.We guarantee the high quality product, delivery time and good service.

4.We are able to manufacture any parts according to your specific instructions and help you select appropriate product and specification for you.

Looking forward to your inquiry!

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Elevator three pieces
Host traction machine control cabinet motherboard and so on
Q:Elevator parts can not provide proof of import should be how to deal with
Contract law, if the contract agreed
Q:What parts of the elevator water will normally damage?
Now the ladders are generally fitted with a single leak switch of 220. And the elevator water, then the box is no effect. A small amount of water is not a problem. But if a lot of water, then, even the pit emergency stop, 220 Ji Chang digging to kill the ghosts missing Han painting socket, 36 lights, walkie-talkie what are soaked into the words, the general three-line brand ladder may burn a transformer or something, Remember that the electric cabinet do not water, and the pit should also be waterproof measures. The elevator can not withstand the torment. If you are a servant, then you are busy.
Q:What parts are inside the elevator control cabinet?
This is the elevator control cabinet inside the power module, is 220V AC power into 12V or 24V DC module. It is if the fault helium ingot melon raspberry cover every drowning fine elevator can not work.
Q:Elevator hoist inside the iron frame how to build, that is how to put the parts to the top of the
Do you know that there is a hook on the top? Bearing capacity is generally 2 tons. At first start the bottom of the car. Then people stand on top. Pull up the hook. People to pay ridge barnyard jealousy Huan half of the newspaper only began to install rails. Ring beam and so on. The
Q:What is the most valuable part of the elevator?
Of course it is traction machine
Q:What is the highest part of the elevator car roof?
It is simple to say that the elevator reaches the top floor, the closest part to the top floor
Q:Inside the elevator how to do leakage
It is recommended to find the property or maintenance side to deal with, it is best not to act independently, so as to avoid accidents.
Q:The elevator does not need to be sealed
Why is it? Safety or the door lock what did not come? What did not come to the closure of what to trace the hundred grams of knowledge for a long time Huan Bao magic chant hall door and car door not sealed with insecurity
Q:Elevator warranty period specified reference standard?
The elevator warranty period is in accordance with the Ministry of Construction in 1995 issued the project (1995) No. 167 "on the strengthening of the elevator management of the Interim Provisions Implementation Rules" provides: the newly installed elevator quality warranty period from the date of acceptance of one year, Or goods to the site for 18 months basis? Or on the basis of the 25th executive meeting of the State Council on January 10, 2000 (Decree No. 279 of the State Council of the People's Republic of China on January 30, 2000) "Regulations on the Quality Management of the Project" In the provisions of the electrical pipeline, water supply and drainage pipes, equipment installation and renovation works the minimum warranty period of 2 years? More...
Our products are more than 10000 items and the inventory is more than 5 million pieces. We strive to survive on the basis of quality and credit. Our mission is "Customer Orientated, Service First". Welcome new and old friends to visit our website or contact us directly!

1. Manufacturer Overview

Location Beijing,China (Mainland)
Year Established 2009
Annual Output Value US$2.5 Million - US$5 Million
Main Markets South America; Southeast Asia; Africa; Oceania; Mid East; Western Europe
Company Certifications ISO 9001:2000

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage 11% - 20%
No.of Employees in Trade Department 6-10 People
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range