Elevator Push Button
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 100 Pieces pc
- Supply Capability:
- 50000 Pieces per Month pc/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Detailed Product Description
1.Color:Red,Blue
2.Voltage: DC24V
Elevator Button
1.Color:Red,Blue
2.Voltage: AC/DC12V, AC/DC24V
3.Without Braille
Elevator Push Button, Lift Switch, Lift Electric Button, Elevator Electronic Switch
We have been supplying different types of high quality elevator push button as per customer’s
requirement.
- Q: Usually said that the elevator three pieces, which is the three pieces? Not that the elevator is the four major space + eight system more
- Traction machine (often said that the host or motor), door machine, variable frequency drive (equivalent to the human brain) or control cabinet (including variable frequency drive and control cabinet motherboard)
- Q: I am now the company elevator to find its import parts are made, I should be to which government departments to add to the question: the elevator company which broke the law more
- First find the city quality supervision bureau to find consumer associations or the City Administration for Industry and Commerce
- Q: What are the contents of the installation of the elevator floor door components?
- Simply put, for the following three elements: 1, hall door to install 2, the door on the door to install 3, hanging door
- Q: This is a part of the elevator control cabinet, I would like to know what each of the components marked below, and its role! More
- The quality of this electrical cabinet is really not very good.
- Q: The elevator warranty period is in accordance with the Ministry of Construction in 1995 issued the project (1995) No. 167 "on the strengthening of the elevator management of the Interim Provisions Implementation Rules" provides: the newly installed elevator quality warranty period from the date of acceptance of one year, Or goods to the site for 18 months basis? Or on the basis of the 25th executive meeting of the State Council on January 10, 2000 (Decree No. 279 of the State Council of the People's Republic of China on January 30, 2000) "Regulations on the Quality Management of the Project" In the provisions of the electrical pipeline, water supply and drainage pipes, equipment installation and renovation works the minimum warranty period of 2 years? More
- Follow one of the previous
- Q: Hello there. I also encountered the same problem with you. Start without water. Forget the faucet. And then came to the elevator to burn the car to take care of the amount of money. The property makes me lose money. But what did you do? More
- Who is a few layers from the flow, the elevator is a few layers, then the elevator in a few layers. What parts of the elevator were burned. Do not let the nausea of the property put you in the pit.
- Q: What is the most valuable part of the elevator?
- Is the motherboard and inverter
- Q: What is the highest part of the elevator car roof?
- The engine room elevator is the guide wheel, the highest part of the machine room is the fence.
- Q: The elevator does not need to be sealed
- If it is emergency electric operation, need to block the safety gear switch, gripper switch (asynchronous machine), speed limit switch, upper and lower limit switch, the buffer switch
- Q: The elevator has a certain useful life
- The old elevator flower lamb cellar barley bleed cut the daughter of the public is really very dangerous, so the choice of elevator life is also a very critical standard, I heard the elevator, Vaux belongs to the relatively high life.
We have expert designers and managers and set up effective quality control system and achieved ISO9001 certificate for quality management system. We strictly control the product quality from design, manufacture, inspection, installation to service according to ISO9001 standard.
1. Manufacturer Overview
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b) Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Elevator Push Button
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 100 Pieces pc
- Supply Capability:
- 50000 Pieces per Month pc/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords