• Cuplock Scaffolding System for Muti-Purpose CNBM System 1
  • Cuplock Scaffolding System for Muti-Purpose CNBM System 2
  • Cuplock Scaffolding System for Muti-Purpose CNBM System 3
Cuplock Scaffolding System for Muti-Purpose CNBM

Cuplock Scaffolding System for Muti-Purpose CNBM

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t
Supply Capability:
3000 m.t/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Quick Details

  • Model Number: CS

  • Material: Steel

  • Surface: Paint/galvanized

  • Type: Cuplock scaffolding

  • Certification: CE

2.Packaging & Delivery

Packaging Details:Pallet

Delivery Detail:According to order quantity

3.Product Description

Model No: FAS-G

Product Name: Steel Facade Scaffolding System--End Guardrail 

4.Feature:

1. Specification: 464mm(H)x730mm(W)

2. Surface: painted/cold (hot) dipped galvanized or to be order

3. Also can manufacture it as your requirement.

5.

Ring   Lock System Scaffold Bay Brace / Diagonal Brace

Model

Description

Weight(kg)

Weight(lbs)

AR.DB.3050x2000

Ring Lock Bay Brace 3050x2000mm (10')

10.87

23.96

AR.DB.2745x2000

Ring Lock Bay Brace 3050x2000mm (10')

10.24

23.96

AR.DB.2440x2000

Ring Lock Bay Brace 2440x2000mm (8')

9.62

21.20

AR.DB.2130x2000

Ring Lock Bay Brace 2130x2000mm (7')

9.03

19.91

AR.DB.1830x2000

Ring Lock Bay Brace 1830x2000mm (6')

8.51

18.76

AR.DB.1520x2000

Ring Lock Bay Brace 1520x2000mm (5')

7.91

17.45

AR.DB.1220x2000

Ring Lock Bay Brace 1220x2000mm (4')

7.62

16.80

 6.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

Cuplock Scaffolding System for Muti-Purpose CNBM

Q: What is the bamboo board for the scaffolding of the building?
Scaffold board can be made of steel, wood, bamboo material, single scaffolding quality should not be greater than 30KG Construction site commonly used scaffold with stamping steel foot Shouban.
Q: Pain on a scale of 1-10Advice on piercing?I heard it's easily infected??
Pain will differ from person to person so no one can really answer that. My advice is to sleep with your arm bent under your head so your ear is in that little whole and nothing can bother it. Also, avoid dying your hair for the next two months and be care when putting on sweaters, shirts, brushing hair, et cetera. Infection is a problem if you keep it clean but irritation is because every time you bump on side, you bump the other as well. Good luck!
Q: (Spoilers) In the Scarlet Letter if DImmesdale did not die on the scaffold would Chillingworth have killed him? He speaks of revenge.?
Chllingworth's revenge did not involve killing Dimmesdale. He preyed on Dimmesdale's guilty conscience and drove him to do what he did, out of guilt. What Chillingtonworth did was actually much crueler than just killing Dimmesdale outright.
Q: Im pretty sure that the 3 characters are Reverend Mr. Wilson, Governer Bellingham, and Mistress Hibbins. The hard part is finding what they represent.
First I would like to acknowledge that this question is from the book: The Scarlet Letter by Nathaniel Hawthorne
Q: In the housing budget in what circumstances calculate the dependent chute and independent ramps? Thank you
No provisions are calculated according to the actual number of seats , the shelves of the ramp are dependent and independent of the ramp, the erection should be based on the actual needs of the project or construction organization design requirements Such as the need to set up shelves ramp, shelves ramps should be calculated by a seat, a ramps for a , shelves, high-rise buildings on the street, to prevent the construction materials and other items fall and pedestrians to take preventive measures, and has a windproof effect The shelving of the shelves shall be calculated in terms of the vertical area Seal material is considered in the fixed bamboo mat, such as the construction organization design using other materials, can be added to the additional quota
Q: Is it necessary to use a mat on the floor? Is that norm prescribed?
Scaffolding load shall not exceed 270kg & nbsp; # 47; m
Q: Sprinkling water on the construction helps to help reduce haze days
to strengthen the possible production of dust material management, bags of cement, fly ash, lime and other handling and use of the process, should avoid falling from the height, Put, should not be forced to beat in the cutting tiles, concrete and other bulk materials used wet method the construction site of the road, gravel and other building materials yard and other operating areas, continuous wet ground in the dry, often sprinkle water, keep the dust is not up bulk materials, construction waste must be in accordance with the provisions of the implementation of vehicle closed transport, loading and unloading is strictly prohibited volley scattered To strictly control the dust of the mixing machine Scaffolding and other facilities to be removed after the first dust removal, and to be removed when someone was monitoring safety and environmental protection Second, the dust management living area canteen stove as far as possible the use of liquefied petroleum gas, gas and electricity, shall not use wood and bamboo, etc, to reduce dust pollution the site is strictly prohibited incineration of waste and waste materials and linoleum, plastic, etc, in person to clean up garbage the scene is not allowed to melt asphalt, to prevent emissions and dust pollution the scene of cement into the library to prevent dust, pay attention to control the cement library purchase volume Third, the sound of environmental management (a) sound environmental management strict control of construction noise, noise emissions should be consistent with the state's "construction site environmental noise emission standards" (GB-90) should be scientific and reasonable arrangements for operating time, must be at night construction, according to the provisions of the construction permit, reduce construction noise
Q: Will the concrete cloth machine and the tower crane is different, long quite like Please explain the structure of the application, 3Q
The role of the tower crane is to a variety of building materials (such as brick, mortar, concrete - also due to small units do not pump, components, etc); turnover materials (such as steel formwork, scaffold tube, etc) The Forearm without a pipe, some pipe is 50mm below the structure of the steel pipe is not connected to each other, the end of a hook Crawler cranes commonly known as crawler cranes, the boom is generally not scalable but can be long, both the boom (commonly known as boom) are able to pitch, no tower, you can I can not see the track, I have seen the largest car crane is the largest weight from 80 tons, I have seen the largest crawler crane is the largest lifting weight of 1350 tons Tower crane (commonly known as the tower crane) can not tilt the general boom, can not be stretched, have a tower, generally can not move, and some can move but on the default rail, can not move the seat on the concrete base The You said something and tower cranes can be too different
Q: I would like to know what the scope of responsibility for the construction engineering supervision is specific
The scope of project supervision responsibility should mainly cover two aspects: one must involve the project itself, the site management is different from the project management, the former is the contractor's responsibility, the latter is the responsibility of the supervision interval, and the project itself has nothing to do with the responsibility of the accident , If the accountability of enterprises or supervisors is not based on the responsibility Such as temporary construction, temporary electricity, erection of scaffolding, loading and unloading of various building materials, on-site transport equipment, etc, does not constitute the project itself, so even if the accident occurred, should not be held accountable or supervisory staff responsibility Second, it must involve the quality of the project, because the owner is the first person responsible for the quality of the project, the project supervision enterprises as a social intermediary service organization, its power, responsibility and obligation is derived by the owner commissioned by any supervision business can not exceed the owner commissioned Responsibilities and new powers and obligations Therefore, the supervision of enterprises not only to bear the corresponding responsibility for the quality of the accident, but also due to the quality of the accident caused by accidents, including accidents, including other accidents
Q: A man of mass 74.4 kg stands on a scaffold supported by a vertical rope at each end. The scaffold has a mass of 21.9 kg and is 3.9 m long. Suppose the man stands to the right from the middle of the scaffold that is a distance one sixth of the length of the scaffold. What is the tension in the right rope? b) What is the tension in the left rope? thanks in advance.
Left rope = T1 Right rope = T2 1/6 of 3.9 m = 0.65 m 3.9/2= 1.95 1.95 - 0.65 = 1.3 m from right rope. Take g = 10m/s^2 T1 = ((219 x 3.9)/2) + (744 x 1.3) = 1394.25 1394.25 = 3.9 x T1 1394.25/3.9 = T1 = 357.5 N (answer for left rope) T2 = ((219 x 3.9)/2) + (744 x (3.9 -1.3)) = 2361.45 2361.45 = 3.9 x T2 2361.45/3.9 = T2 = 605.5 N (answer for right rope)

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords