Galvanized Cuplock Scaffold System for Construction Formwork CNBM

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50 m.t.
Supply Capability:
30000 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

  • Quick Details of Galvanized Cuplock Scaffold System for Construction Formwork

  • Type: Heavy Section Steel

  • Forming: Welding Products

  • Standard:GB, ASTM, DIN, JIS, AISI, BS, En74,Bs1139

  • Member:Steel Column

  • Trademark:Quality Carbon Structural Steel and Alloy Structural Steel

  • Connection Form:Welded Connection

  • Carbon Structural Steel:Q235,Q255,Q345

  • Residential Wall Structure:Wall Support

  • Type of Steel For Building Structure:High-Strength Steel

  • Bs1139, En74 Standard:Tube :48.3mmx3.25mm/2.5mm

  • Export Markets:Global

  • Galvanized Cuplock Scaffold System for Construction Formwork CNBM

  • Galvanized Cuplock Scaffold System for Construction Formwork CNBM


  • Galvanized Cuplock Scaffold System for Construction Formwork CNBM

Descriptions of Galvanized Cuplock Scaffold System for Construction Formwork

Cuplock is a kind of multi-purpose and versatile modular system scaffolding, suitable for access and formwork support in all types of construction of building & civil engineering projects, offshore projects, etc. This complete galvanized Cuplock system is probably the fastest and most widely preferred scaffolding system. It has flexible erection as straight, curved or circular configuration for both access and support purposes.


Futures of Galvanized Cuplock Scaffold System for Construction Formwork

Multi-functional-with the universal joint and fully interchangeable components, the cuplock system can be used in most construction projects for both formwork and access. It is very versatile and diverse. Use in the shipping industries, oil and gas and aviation industries.
Versatile-Verticals are assembled with horizontals and diagonals using secure fixed cup connections. Its versatility has a distinct advantage to conventional scaffolding methods. A positive & ridged connection of four units is achieved in one single action. The cupock system is very cost effective and can be erected safely and quickly.
Time saving-cuplock scaffold is the solution for temporary structures Performance stages. Small teams can erect it safely and quickly.
Economical-Easily assembled system scaffold saves time and labor costs.
Durable-All components are hot dip galvanized and manufactures to international standard.
Easily Stored-Individual pipe elements can be packed in bundles for easy storage and transportation. For returns, material can be packed in steel racks.

  • The Main Components of Galvanized Cuplock Scaffold System for Construction Formwork

  • Verticals

  • Description

    Material

    kg/pc

    Article No.

    9'10" Vertical 3.00m

    Q345 φ48.3×3.2

    16.90

    SC1001 3000

    8'2" Vertical 2.50m

    Q345 φ48.3×3.2

    14.20

    SC1001 2500

    6'6" Vertical 2.00m

    Q345 φ48.3×3.2

    11.60

    SC1001 2000

    4'11" Vertical 1.50m

    Q345 φ48.3×3.2

    8.90

    SC1001 1500

    3'3" Vertical 1.00m

    Q345 φ48.3×3.2

    6.20

    SC1001 1000

    1' Vertical 0.50m

    Q345 φ48.3×3.2

    3.50

    SC1001 0500

Horizontals

  • Description

    Material

    kg/pc

    Article No.

    10'0" Horizontal 3.05m

    Q345 φ48.3×3.2

    11.80

    SC1002 3048

    9'0" Horizontal 2.74m

    Q345 φ48.3×3.2

    10.70

    SC1002 2743

    8'2" Horizontal 2.50m

    Q345 φ48.3×3.2

    9.80

    SC1002 2500

    7'0" Horizontal 2.13m

    Q345 φ48.3×3.2

    8.40

    SC1002 2133

    6'6" Horizontal 2.00m

    Q345 φ48.3×3.2

    7.90

    SC1002 2000

    6'0" Horizontal 1.83m

    Q345 φ48.3×3.2

    7.20

    SC1002 1828

    5'11" Horizontal 1.80m

    Q345 φ48.3×3.2

    7.10

    SC1002 1800

    5'0" Horizontal 1.52m

    Q345 φ48.3×3.2

    6.10

    SC1002 1524

    4'11" Horizontal 1.50m

    Q345 φ48.3×3.2

    6.00

    SC1002 1500

    4'1" Horizontal 1.25m

    Q345 φ48.3×3.2

    5.00

    SC1002 1250

    4'0" Horizontal 1.22m

    Q345 φ48.3×3.2

    4.90

    SC1002 1219

    3'6" Horizontal 1.07m

    Q345 φ48.3×3.2

    4.30

    SC1002 1067

    3'3" Horizontal 1.00m

    Q345 φ48.3×3.2

    4.10

    SC1002 1000

    3'0" Horizontal 0.91m

    Q345 φ48.3×3.2

    3.80

    SC1002 0914

    2'11" Horizontal 0.90m

    Q345 φ48.3×3.2

    3.70

    SC1002 0900

    8'0" Horizontal 2.44m

    Q345 φ48.3×3.2

    9.50

    SC1002 2438

    1'10" Horizontal 0.57m

    Q345 φ48.3×3.2

    2.40

    SC1002 0600

  • FAQ

  • 1. What is considerations of Scaffolding installation?

  • There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

  • (1) scaffold frontage hurtful to prevent falling objects protection is required.

  • (2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

  • 2.What are the certifications of your products?

  • Certified by SGS, BS1139, EN74, Local Test Report.

  • 3. How long is the warranty period for your product?

  • Our products warranty is 2 years.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Questions about Scaffold (aka Industrial) piercings?
Ask how long they have been piercing and what certifications (if any) they carry, additionally verify close by regulations to ascertain if any are required. additionally ask how generally they spore verify their autoclave and while it grew to become into accomplished final time. Ask to ascertain a portfolio of HEALED piercings, exceptionally pictures of in spite of piercing you try to get.
Q:How to make a slide using scaffolding?
Why would you even consider something like that? Obviously you kids and your family use this pool, why put them at risk making a temporary slide with scaffolding. Not a good idea.
Q:What are the requirements for the sampling inspection of scaffolding?
Inspection and acceptance of cantilever scaffold1 after the erection of the cantilever support, the scaffold is erected;2 before loading on the work layer;3 after each set of 10m height;4 after reaching the design height;5 in the case of more than six winds and heavy rain;6 use more than a month.Cantilever scaffold inspection document1 special construction plan and design documents;2 safety technical disclosure;3 the provisions of appendix D, table D.1.
Q:Specification for construction steel pipe scaffolding and construction safety rules?
2, operating conditionsAccording to the engineering characteristics and construction requirements of the scaffolding erection scheme.The shelf position has to clean up the site.On the soft soil foundation has been hardening.
Q:What are the requirements for the construction of the scaffold eye in the building?
SelectionThe project uses 48 mm, 3.5mm wall thickness steel pipe and the corresponding fasteners, dense mesh safety net, big eyes, etc.. Among them, the specification of the steel pipe is from 0.5m to 6m, and the fastener mainly has a rotating shaft, a cross and a joint fastener. Bowl buckle scaffold also uses Phi 48, 3.5 wall thickness of steel pipe and the corresponding fasteners, mainly with 1 x 1.0m, 1.2 x 1.2m, 1.5 x 1.5m and other specifications. Foot board mainly 2M and 3M two.
Q:How badly does getting an industrial/scaffolding piercing hurt?
When I got my industrial, it hurt more after wards. During the first week, it was a pain to sleep. Just make sure you clean it twice a day so it doesn't get infected.
Q:What are the requirements for acceptance of external scaffolding? Want to know before
7, scaffolding erection should be higher than the top of the building or the operating surface of 1.5m or more, and add enclosure. 8, the erection of the scaffolding on the steel pipe, fasteners, foot board and connection points shall not be arbitrarily removed. When necessary, the construction site must be approved by the person in charge of the site and take effective measures. 9, the use of scaffolding, the site should be responsible for the organization of inspection and acceptance, acceptance and fill in the inspection form before use. In the construction process should be professional management, inspection and warranty, and periodic settlement observation, found abnormal should take timely reinforcement measures.
Q:Is there any requirement for the installation of the disc scaffold?
The same height of the building to be calculated separately, and ultimately is to pay attention to security, you can look at the yuan Tuo mall information on this aspect is still a lot of
Q:What are the advantages and disadvantages of the fastener type steel pipe scaffold and bowl buckle steel tube scaffold
(2) efficacy: the most commonly used rod length of 3130MM, weight 17.07KG. The entire frame cannibalize speed is 3 ~ 5 times faster than conventional, faster effort to fight demolition, workers with a hammer to complete all assignments, to avoid the inconvenience caused by bolt operation; (3) with strong: the main components are the ordinary steel tubular scaffolding steel pipe, steel pipe connecting fastener with general availability in general, strong.
Q:Fastener type steel pipe scaffold composed of components
Rotating fasteners, connecting rods, pedals (steel pedals, bamboo pedals can be), the extension of the extension of the galvanized steel pedal easy to use

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range