Cuplock Scaffolding / Scaffolding System / Scaffolding for Construction

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg
Supply Capability:
100000 kg/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Cuplock Scaffolding / Scaffolding System / Scaffolding for Construction


Specifications

cuplock scaffolding ,scaffolding system,scaffolding for construction


Diameter

48*3.0-3.25 


Material 

Q235 

Surface

galvanized


 

cuplock scaffolding ,scaffolding system,scaffolding for construction:

Standard(MM)

Weight(kg)

Material


surface finished

48*3.0-3.25*600

2.15

Q235


painted/galvanized

48*3.0-3.25*1000

3.59

Q235


painted/galvanized

48*3.0-3.25*1800

6.456

Q235


painted/galvanized

48*3.0-3.25*2000

7.17

Q235


painted/galvanized

48*3.0-3.25*2500

8.97

Q235


painted/galvanized

48*3.0-3.25*3000

10.76

Q235


painted/galvanized

Ledger(MM)





48*3.0-3.25*400

1.44

Q235


painted/galvanized

48*3.0-3.25*600

2.15

Q235


painted/galvanized

48*3.0-3.25*800

2.87

Q235


painted/galvanized

48*3.0-3.25*1000

3.59

Q235


painted/galvanized

48*3.0-3.25*1200

4.3

Q235


painted/galvanized

Cuplock Scaffolding / Scaffolding System / Scaffolding for Construction

Cuplock Scaffolding / Scaffolding System / Scaffolding for Construction

Cuplock Scaffolding / Scaffolding System / Scaffolding for Construction

Cuplock Scaffolding / Scaffolding System / Scaffolding for Construction


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the different types of steel tubular scaffold with bowl buckle
(5) safe and reliable: the joint design, taking into account the upper bowl buckle spiral friction and self gravity, so that the connector has a reliable self-locking capacity. The load acting on the cross bar is transferred to the vertical rod through the lower bowl buckle, and the lower bowl buckle has a strong shearing force (the maximum is 199KN). Even if the upper bowl buckle is not pressed, the joint of the cross bar is not caused by an accident. At the same time equipped with a safety net support, inter bar, foot board, block board, ladder. Pick up the beam, wall support and other rod accessories, the use of safe and reliable.
Q:Should I get a scaffold piercing or a second piercing on each ear lobe?
They are near impossible to get rid of and may never stop growing.
Q:How long for a scaffold piercing to heal?
Scaffold is a cartilage piercing and cartilage piercings need 1 full year to fully heal if treated properly for the whole healing period. They are nothing like other piercings, they are not easy to heal and they have their ups and downs while doing so. They can stay irritated, swollen and painful for long, bumps can be formed around them which also can get infected. All this goes away after proper care but can happen again days or even months later. So you need to be extra careful with it and follow your piercers after care instructions by the book if you want to keep yourself and the piercing healthy. You need to do sea salt soaks 2 times a day for the whole healing period and never stop. How to do : Warm water (8oz) + non iodized salt (1/4 teaspoon) mixed in a cup. Soak the piercing in for 10 minutes, 2 times a day. Use a q-tip to clean around the piercing thoroughly, rinse with water and pat it dry with a paper towel. Until the piercing is fully healed don't : Touch it, twist the jewelry, play with it, sleep on it, change the jewelry or take it out but only touch it with freshly washed hands to clean it. Do not twist the jewelry. If a piercing is freshly cleaned it can easily slide in and out with the slightest push. Some kids mistakenly think that if you don't twist the jewelry it will somehow get stuck to the skin and never move again. This is a bad myth and can never happen. If you keep twisting the jewelry the crusties that are naturally created and attacked to the jewelry will keep scratching the inside part of the piercing ( the actual wound ) causing trauma again and again, irritating the piercing and dealing the healing process. A new piercing , especially cartilage ones need cleaning, time to heal and avoid touching.
Q:Should I work Offshore or Scaffold?
offshore for sure buddy,,scaffolding is a pain sometimes,,
Q:Calculation method of various kinds of fasteners and fastening screws for engineering scaffold steel pipe
0.7 - the basic wind pressure reduction coefficient determined by the return period of 5 years. In some special cases, a value above 0.7 may be used, but not less than this value.More than W0, Z, beta Z, STW are in accordance with the "building structure load code" (GBJ9-87) of the corresponding provisions of the selection or calculation to determine, which STW 6.3.1 in accordance with its table thirty-second and thirty-sixth.
Q:What are the advantages of rental scaffolding
Fine design geometry and improve steel turnover material consumption from economic effect fastening steel frame equivalent per square meter construction steel consumption of about 15 kg (1) special screw fastener defects) easily lost; 2) node rod connected by partial sliding resistance load transfer in force to reduce its carrying capacity; 3 the fastener fastener connection quality) by itself quality significantly affected the operation adaptability of 1) to build various forms of scaffolding, the template support frame;
Q:Fixed in the construction of steel tubular scaffolding 3 rows of what is meant
The scaffold is common in interior formwork support, generally in the plane projection matrix, identified in the upper load situation, through the relevant calculations to determine the vertical and horizontal spacing, vertical rod erection step rails to ensure the bearing capacity of the frame body.
Q:What are scaffolding poles usually made of?
They are usualy made form Aluminium.
Q:i worked a week in hand for a scaffold company and got laid off 2 months later only got 1 weeks pay?
Well if after 2 weeks you still hadn't been paid, then you should of left and found another job. I did door work for Scottish power years ago - trying to gain new energy customers etc. They didn't pay me or my colleagues at all. Eventually 3 months later I got £350 out of them - Only after I wrote directly to the Chief executive (Rather handy that they accidentally sent me to his own home to try and sell him gas electricity hehehe). I wrote directly to his home and needless to say he took it upon himself personally to look into plus I also got a personal response.
Q:Why the scaffolds need to be inspected within the preceding 7 days and after adverse weather condition?
So you don't fall. The reason you want the inspection to be recent is that people change things when you're not looking. Or, the wind could move something that you're not expecting.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range