• Cuplock System Scaffolding Cuplock Scaffolding System for Construction System 1
  • Cuplock System Scaffolding Cuplock Scaffolding System for Construction System 2
Cuplock System Scaffolding Cuplock Scaffolding System for Construction

Cuplock System Scaffolding Cuplock Scaffolding System for Construction

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg
Supply Capability:
100000 kg/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Packaging & Delivery

Packaging Detail:pallet or bulk according to customers' requirment
Delivery Detail:Within 15-25days after receiving the advanced payment


Specifications

Best price cuplock scaffolding 
Good bearing capacity . 
Used time long . 
Very good stability . 
Covenient to transport

Cuplock Scaffolding

1.have our own factory (reasonable price)
2.Good bearing capacity 
3.Stable& durable 
4.Easy to assemble or dismantle

  

 Specification 

Product name

Cuplock scaffolding

Components

standard ,ledger,diagonal , top cup, bottom cup,

Ledger Blade

Material

Q235/345/195

Surface

galvanized, Hot dip galvanized, Painted

color

red paint, blue paint, yellow paint, green paint, bright galvanized

size

Steel pipe diameter is 48.3mm

Thickness :2.75/3.0/3.2/3.25/4.0mm

standard Length:0.5/1.0/1.5/2.0/2.5/3.0M

Ledger length:0.6/0.9/1.0/1.2/1.5/1.8

usege

Our products are used widely in bridge, tunnel, petrifaction, shipbuilding, railway, airport, dock industry and civil building etc

Packing

Bulk or Bundle with steel strip


Size

StandardLedgerDiagonal
Ø48.3×3.25Ø48.3×3.25Ø48.3×3.25
Q345Q235Q235
Size/mmWeight/kgSize/mmWeight/kgSize/mmWeight/kg
5003.456002.541300×20009.21
10005.589003.61800×200010.31
13007.9710004.12500×200012.16
15008.7412004.7

180010.612505

200011.3813005.2

25001416006.3

300016.6318007



25009.54


Q:I mean, anybody knows when will they finish the exterior restoration?
My friend, the restoriation of the outside facede of the Guggenheim Museum should be completed in spring of 2008. The exterior restoration is part of $29 million restoration project to the 46 year building. Good luck Native New Yorker
Q:Fastener type steel pipe scaffold wall parts of the lateral spacing is less than the number of
Should be less than or equal to 3 times the vertical pole of the scaffolding.
Q:the shop said i might have the wrong ear shape, does anyone know of any pictures or diagrams of the wrong shape so i can see. Also what are some do's and do not's. not like cleaning cos i've read loads of them, just anything else useful. thankssharotoxxx
Hello You should have asked them I dunno whats that mean the wrong ear shape But you can always do a cartilage piercing, it looks a way better Good luck
Q:PLEASE HELP!!!
maybe the fact that it marked the point where she began to see things from a different perspective than the colonists (figuratively and literally) Hawthorne later says that she began to think unnatural thoughts for a colonist..... Hope this helps, we didn't really discuss this while we read it ^_^
Q:All I know about the guy is that in the end, he doesn't get the girl he wanted and his head gets chopped off. Please don't give me critiques or anything like that. I just want the story. Thanks.
Idee Fixe Definition
Q:Bowl buckle scaffold can be used on any ground
Can, sufficient density foot weight-bearing requirements, there is enough, she put one hundred percent safety factor.
Q:If the guillotine operator walked away from the scaffold where would he be headed?
Rolling down the aisles.
Q:I got it done MONTHS ago and the bar is so tight on it,i have space in it, like i can move the bar up and down..just i cant get it out and its beginning to hurt me if i sleep on the side its on.. advice please?
Stop sleeping on it and stop trying to pull it out - you're just going to irritate it doing that. If you feel you need new jewelry, go to your piercer. They can help you out.
Q:How much is the adjusting range of the scaffold of the bottom
Two, full scaffold installation requirements(1) the installation of the frame from the beam to the other end of the start, from the vertical and horizontal at the same time in the two directions, so as not to support instability. (2) all the rods used for supporting must be used before being tested.
Q:JGJ 130-2011 also has a carpenter scaffolding specification, who has to share the upload thank you
Technical code for safety of steel tubular scaffold with couplers in construction of JGJ 130-2011

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords