CSA Concrete Urgent Repair Materials
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 20 Tons m.t.
- Supply Capability:
- 1000000 Tons per Year m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
CSA concrete urgent repair material have a good performace in working with rush-repair works,urgent projects,concrete repair
It Urgent Repair Material is obtained by special Rapid-hardening Sulphoaluminate cement with composite special admixture, this product has passed appraised science and technology achievement by Hebei province ,got success apply in Haerbin Airport ,Mudanjiang Airport for road surface urgent repair.
Properties:
1.Special applicator was not necessary while operating,, just need mixed repair material, sand and crushed stone with water in designed ratio, so convenient for operating.
2.This product can ensure working life more than 20mins with a higher strength. From mixing, concrete road surface resume working just need 4 hours, so it is an ideal urgent repair material for airport and expressway, etc.
3.For based on special rapid-hardening sulphoaluminate cement, this product have excellent sulfate-resisting and seawater, also can avoid the damage from alkali aggregate reaction.
4.Low rate of batch water with its slight expansion make this material have a high degree of compaction beside excellent capacity about breeze-thaw resistance and salt.
5.Excellent adhesive is to make the interface between new and old concrete firmly bond.
Using methods
1.Working surface should be a rigid and need watering before repaired, meanwhile, clear the contaminant and ponding of water.
2.According to the mix proportion of Cement based material/sand/crushed stone/water=1/1.5/1.5/0.27-0.3,and the water can be adjusted by actual demand.
3.Cement based material should be added with admixture while mixing, then feeding the mid-sand, crushed stone and water, stir for 5mins better.
4.Using in negative temperature environment, it should be use hot water and feeding turning should be according to sand first, then crushed stone and water, with the binder last. Adjustment of water temperature should be controlled well to ensure placing temperature is higher than 5°C.
5.Select the clean water accord with TGJ63 standard of concrete mixing water beside accord with the JGJ standard of medium sand and crushed stone.
Notice:
1.Water, sand and stone should be neutral while they are sensitive to acid and alkali.
2.The workability should be adjusted by special admixture, it is prohibited from adding water to improved concrete performance.
3.Strength development is closely relevant to the temperature, it’s need choose suit product according to working temperature.
4.the product should be used out within working life, while prohibited mixing again for using.
5.From mixing with water within half an hour, compacting the repair concrete with a vibrator and screed surface, It is prohibited vibrating after concrete losing its fluidity.
6.While using in a low temperature environment, it should be covered and curing for a long time.
Package and Storage:
1.There are two bags with basic material and special admixture packed by carton.
2.Shelf life is six months.
3.The product should be stored in dry place, far away from wet and used up after opened.
- Q: I'm putting on new arborite on a kitchen counter and can't seem to get get rid of the old contac glue
- Use lacquer thinner. It removes the contact cement, and then it evaporates leaving no residue behind. I'm a carpenter, and we use it all the time when we have to relaminate a countertop. Hope this helps.
- Q: is there a sealer product for a diy person...or what else is available... it is a laundry room in the basement in a 40 yr. old raised ranch house..no water problems...the surface has small pitting in one area..we have considered flash coating and vinyl flooring and click flooring tiles...looking for a diy solution....
- I would apply a thick coat of self-leveling flooring cement/ flooring compound. There are quite a few different types but basically you just mix it up and skim the surface with it until it is fully covered and any low areas filled. It literally levels the surface ready for carpet of other flooring. You can get cement based latex or epoxy resin types. Sika Latex Self Levelling is one product commonly used by DIY's where I live
- Q: Find a cement wall.and let your body hit it hardly again and again.!It's a really great exercise. REALLY.
- Sounds great! But thats just the beginners version, try the advanced - Find a tall building and throw yourself off so you hit the cement GROUND!!! Its so effective you only need to do it once! You first so I can check your technique and make sure you're doing it properly :o)
- Q: On the gas tank of my motorcycles is edged rubber and edged thin steel. The edged rubber slides into the edge of the steel. Some of the rubber has come off the edge of the steel, and I was wondering how could I glue it. I thought of rubber cement, but I don't know. Also should I prime the steel by taking some light sandpaper to it? Thanks.
- For that application I recommend using contact cement. With a pencil, trace around the pad locations onto the gas tank. Apply contact cement carefully, within the lines on the gas tank. If the tank has been painted, lightly sand it (within the area to be glued) to make the area dull so it will accept the cement more readily. When this has been done, and the correct amount of time has passed, carefully position the pads on to the tank.
- Q: I want to do building business business sand cement stones. The (Need to add) What equipment needs to invest about how many predecessors advice about how business can do well.
- Transport equipment, loading equipment, operating space, inventory. Forklift, of course, is a falconating charcoal ghosts and gambling ghosts and ghetto ghosts you know how to make it!
- Q: what weighs more? cement or sand?
- I'm guessing by cement you mean concrete. Weights vary somewhat. Concrete 143 lbs. Cement 94 lbs. Sand 100 lbs. per cubic foot. Cement is the binder that chemically reacts to bind sand and stone making concrete. And yes, a pound of sand weighs the same as a pound of cement. Volume of sand would be greater than the volume of a pound of cement. Somebody was being a smart aleck. Joatmon
- Q: We have an expanding crack the height of the cement wall (24quot;) in a large shed. It is about 1/2quot; wide now and goes thru the entire wall top to bottom -- the wall is 24quot; high, partly under grade.Is there any help for this short of a high $$ pro repair?thank you!
- easy fix stainless steel rebar with injectable styrene or polyester resin you cut grooves in the wall with a cutter (rent one) push the stainless steel bars in and inject the self mixing resin with a cartridge tool , also inject the crack with the resin and finish with mortar/cement, for a real fix , under pin the wall with concrete first to stop further movement
- Q: I'm doing a project wich required me to calculate the transfer rate of Barite Cement from tanks to tanks. I've run couple of calculation but i'm not sure it is the correct one or not. Please advise.
- Cement is normally a dry powder if the system is a screw the rpm x the screw pitch volume will get you there. If you used a forced eductor use the ACFM x percent of flow /air per cent If you used a vac system and had head and lift and pipe loss and lots of other losses. Just add up all that and get a feasible answer..when you ask get specific... From the E
- Q: Are they like the same...different? Idk
- Different mix. Concrete has more gravel in it as rock is harder than concrete and cement is more a mixture with sand. Quite interchangeable language on the jobsite like Tomato or tomayto. They generally know what you want so they bring it. I don't doubt that the lime content changes but I will leave that secret up to them.
- Q: What percent of garnet is in cement?
- There shouldn't be any garnet in cement. Portland cement (the most common one) is a mixture of roasted limestone, clay and gypsum. None of these rocks normally contain garnets.
1. Manufacturer Overview
Location | Hebei,China (Mainland) |
Year Established | 1998 |
Annual Output Value | US$2.5 Million - US$5 Million |
Main Markets | North America; South America; Eastern Europe; Southeast Asia; Africa; Mid East; Eastern Asia; Western Europe; Southern Europe; South Asia |
Company Certifications | ISO 9001:2000;ISO 14001:2004 |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | Xingang, Jingtang |
Export Percentage | 21% - 30% |
No.of Employees in Trade Department | 11-20 People |
Language Spoken: | English, Chinese, Japanese, Russian, Korean |
b) Factory Information | |
Factory Size: | 1,000-3,000 square meters |
No. of Production Lines | |
Contract Manufacturing | OEM Service Offered Buyer Label Offered |
Product Price Range | Average |
Send your message to us
CSA Concrete Urgent Repair Materials
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 20 Tons m.t.
- Supply Capability:
- 1000000 Tons per Year m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords