• CONSTRUCTION FORMWORK SYSTEMS and  Aluminum-Frame Formwork System 1
  • CONSTRUCTION FORMWORK SYSTEMS and  Aluminum-Frame Formwork System 2
  • CONSTRUCTION FORMWORK SYSTEMS and  Aluminum-Frame Formwork System 3
  • CONSTRUCTION FORMWORK SYSTEMS and  Aluminum-Frame Formwork System 4
CONSTRUCTION FORMWORK SYSTEMS and  Aluminum-Frame Formwork

CONSTRUCTION FORMWORK SYSTEMS and Aluminum-Frame Formwork

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 m²
Supply Capability:
10000000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1. Structure of  Whole Aluminum Formwork Description 

Whole Aluminium Formwork System is designed to reduce material quantity, erection and dismantling time as well as effort, subsequently increasing efficiency and reducing general construction time, materials and labour cost. All main components are manufactured from high grade aluminium alloy. This structural grade aluminium has exceptional properties being extremely light in weight but also heavy-duty and durable. When incorporating this into a design which utilizes standard components and allows several possible plan and elevation variables, it provides a lightweight solution for a large area slab formwork system.

 

2. Main Features of  Whole Aluminum Formwork

-Light and easy assemble

-Simple structure.

-Competitive prices

3. Whole Aluminum Formwork Images

 

CONSTRUCTION FORMWORK SYSTEMS and  Aluminum-Frame Formwork

CONSTRUCTION FORMWORK SYSTEMS and  Aluminum-Frame Formwork

 

 

4. Whole Aluminum Formwork Specifications

1: MaximumColumn Size:900 x 900mm

(2’-11.5”x 2’-11.5”)

2: DesignConcrete Pressure: 1,800 psf (90 kN/m2)

3:StandardPanel Width 900mm, 750mm & 600mm

(2’-11.5”,2’-5.5” & 1’-11.5”)

4:StandardPanel Height: 3.0m, 2.4m, 1.2m

 

5.FAQ of  Whole Aluminum Formwork

 

1) What can we do for you? 

    .We can ensure the quality of the Whole Aluminum Formwork and avoid extra expenses for customers.    

    .We can provide you the professional technical team.    

    .We can provide professional building proposal for your project.       

    . Please feel free to customize.  

 

2) What promises can be done by us?

   . If interested in this kind of formwork, please feel free to write us for any QUOTE.

   . If need any technical and building assistance, we could provide on-site professional staff for instruction.

   . Please DO check goods when courier knocks your door and contact us asap if any issueS.

 

 

3) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

 4) What about the package and shipping time?

-Packing: wood package and adhesive tape

-Shipping: by sea

     -Shipping time: Normally small orders just takes 7 business days to arrive your hand;. When it comes to the customs declaration, it may need 2weeks.

 


 


 


 

Material

6061-T6 Aluminium alloy

 

 

Main Components

Beam

column

wall

Prop

Others

 

Applications

Exhibition setup

Interior refurbishing

All the towers can be connected together for multi-purpose

Safe working load

60KN/m2

Size

Non-standard: custom-made as per buy’s requirements

 

 

Features

Easy to Handle

One-time Pouring

High Concrete Pouring Rate

More Reuses

Great Recyclable Value

Environmental Friendly



 



Q: What are the mixing arms of the concrete mixer?
Mixing arm concrete mixer is a component of the mixing arm itself and divided into lateral mixing arm (positive and negative points), stirring arm (also have positive and negative points), stirring arm below is the bearing seat connected, connected with 4 sets of high strength bolts with stirring arm. The top is equipped with wear-resistant mixing blades, connecting with mixing blades, high-strength bolts 2 sets. In addition, some manufacturers have designed mixing side bonded shaft swivel, is installed in the interval between the stirring arm fixed and rotated in two ways.
Q: What are the sectors of machine building and parts processing?
3., machinery manufacturing is also a kind of industry, many industries have parts manufacturing, processing links. Therefore, the processing of parts does not belong to a particular industry.
Q: What are the main functions of construction equipment monitoring system?
This belongs to information management engineering. The control part is the "heart" and "brain" of the whole system. It is the command center to realize the function of the whole system. The control part is mainly composed of the main console (some systems also have a secondary console). The main function of the total console: video signal amplification and signal distribution, image correction and compensation, image signal and image signal (including switching or voice signals) record, cameras and auxiliary components (such as camera, PTZ, shield) control (remote control) and so on.
Q: What measures can effectively reduce the construction accident rate?
Hefei construction workers training _ security technology to prevent accidents: prevent the basic starting point of safety accidents is to take measures to restrict energy and dangerous material, to prevent the accidental release. Common safety techniques for preventing accidents are eliminating dangerous sources, limiting energy or dangerous substances, isolating and so on.
Q: What is the use of spare parts prices in Chinese market by foreign companies?
You might be gathering information for him. You have no data for one person, if there are several people? They can analyze a lot of things through big data. You can't find out, you're OK. Once you find out, your whole life is over.
Q: What kind of electrical equipment do you have? What are the main components of each device?
1 、 electrical equipment part of electrical equipment mainly refers to: substation and distribution of power equipment and local scattered power, lighting distribution box. Such as: dry type power transformer, high voltage and low voltage power distribution cabinet, control the use of DC cabinet (with battery), standby uninterruptible power supply cabinet, lighting distribution box, power distribution box (cabinet), power factor capacitor compensation cabinet and standby diesel generator etc.. The utility model is characterized in that the rated voltage is mostly 10KV380V/220V by the combination of independent functional electric components, and the voltage is only 24V or 12V in the control system only.
Q: China mechanical net
From Chinese GM parts, general machinery, hardware, tools, instruments, electrical appliances and related equipment, textile equipment, chemical equipment, agriculture, food equipment, construction equipment, environmental protection equipment, mining equipment, metallurgical equipment, financial equipment, commercial vehicles and accessories, machinery processing equipment, machinery processing industry machinery enterprises and mechanical products
Q: Construction machinery production need to deal with what documents?
The person in charge of the enterprise, the person in charge of the project, full-time safety management personnel in "safety assessment qualified" column content according to the "three persons" Safety Assessment Certificate (fill in the contents of enterprise work safety management staff should meet the enterprise production safety management, the safety management department staff with the qualification to the total contract for not less than 5, not less than 3 professional contracting labor subcontracting, not less than 1; the construction site should be equipped with full-time safety management personnel according to the project size can be determined, according to the construction area of less than 10 thousand M2 project has at least a part-time staff of more than 10 thousand M2; project 1 - 2 full-time staff; more than 50 thousand M2 large sites, according to different professional safety management group);
Q: What is a door rack for a construction site? How high is it generally?
This depends on the erection of the height of the general 3 steps and within 5-6 yuan a meter, assuming the erection of 4.5 meters high, 22.5-27 yuan a square. This is calculated in accordance with single-layer, the higher the more expensive, 9 meters in 65 yuan or so square. In accordance with the establishment of meters, in accordance with the erection of the volume of the calculation.
Q: Where are the hanging baskets for the building?
It is forbidden to take a stool or put a ladder on a hanging basket to work higher; it is not allowed to work alone in a basket, and no electric machinery or equipment can be placed in the basket;

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords