construction all types of aluminum scaffold

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
10000 PCS
Supply Capability:
10000 PCS/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Brand Name:

LF

Model Number:

EH-1

Packaging & Delivery

Packaging Detail:In bulk or steel pallet or as your request
Delivery Detail:within 25 days

Specifications

aluminum scaffold 
1.type: aluminum scaffold 
2.material: aluminum 
3.size: standard 
4.shape: ring lock or cup lock

construction all types of aluminum scaffold

 

Size: 48.3*3.25*1000/2000... 
Main Material:  aluminum  
Certificate: SGS, EN12810 
Surface Treatment: HDG,Paint,Powder coating

NameCup lock or Ring Lock aluminum scaffolding
Place of OriginShandong China
Brand nameLF
SizeØ48.3*3.25*1000/2000/3000 or as your request
Main Materialaluminum  
Surface TreatmentHigh Protected Painted, Powder Coating, Electric Gavenized, Hot Dip Gavenized.
ColorSilver, Orange
CertificateSGS, EN12810.
FeaturesAutomatic Welding
ServiceOEM Service available
MOQ200pcs
PaymentT/T
Delivery TimeAbout 20-30 days after confirmation
PackingIn bulk or steel pallet or as your request
Production capability100 tons per day
Total Annual Sales Volume:US$10 Million - US$50 Million  

Export Percentage:91% - 100%  


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Which accessories are included in a movable scaffold
Mobile scaffolding is the main frame, cross frame, cross diagonal brace, foot board, adjustable base and other components. The cross rod is also called the diagonal pull rod, and is a cross connecting rod which is vertically connected with the two door frames. The part of both ends of the rod part is punched with a pin hole, and the locking pin on the vertical rod of the door and the frame is locked when assembling.
Q:scarlet letter need help with identifying symbols(scaffold,forest,bush,and letter) PLEASE!!!!?
I for irritable Good thing we're not traveling around together. We'd get in a heap of trouble, lol
Q:The construction scheme of high rise and external cantilever scaffold!
Cantilever scaffold erection scheme1, the basis of preparation (omitted)2, engineering survey:This project is the building of electricity production, Handan power supply company, located in the main street and Chaoyang Road Interchange, a total construction area of 17747.8m2, the ground layer ten, partial eleven, annex four, underground two floors, the total height of the building is 44 m, frame structure, the project frame adopts double row cantilever beam pick the scaffold in a layer, five layer nine layer is arranged in the cantilever beam. The scaffold scaffold.
Q:Standard Specification for bowl buckle scaffold
The utility model has the advantages of reasonable structure, simple manufacturing process, easy operation and wide application range, and can fully meet the construction requirements of buildings, bridges and culverts, tunnels, chimneys, water towers and other buildings
Q:How long is the service life of disc scaffolding?
Will bring to the construction of a series of security risks, Hunan Billiton Industrial Group Co., Ltd. to provide information is generally 3-5 years
Q:How to calculate the vertical force of scaffolding
The calculated data include the following three values:1 uniform load value calculation,2 bending strength calculation: the maximum bending moment is considered as the moment under the uniform load3 deflection calculation: the maximum deflection is considered as the deflection of simply supported beam under uniform load
Q:What are the full house scaffolding specification
5 "technical code for safety of steel tubular scaffold for building construction" (JGJ128-2000)6 "construction formwork safety technical specifications" (JGJ162-2008)
Q:What are the common rules for calculating the amount of scaffolding works
The independent brick (stone column) less than 3.60M in height, scaffold to construct the core column multiplied by the circumference of high calculation, the implementation of masonry scaffolding in the shelf; column 3.60M with column wise, the structure of the circumference of the core column height calculated by multiplying plus 3.60M, the implementation of masonry scaffolding outside the shelf (single row). Where masonry height exceeds 1.5m of the masonry are required to calculate the scaffolding.
Q:What are the requirements for acceptance of external scaffolding? Want to know before
7, scaffolding erection should be higher than the top of the building or the operating surface of 1.5m or more, and add enclosure. 8, the erection of the scaffolding on the steel pipe, fasteners, foot board and connection points shall not be arbitrarily removed. When necessary, the construction site must be approved by the person in charge of the site and take effective measures. 9, the use of scaffolding, the site should be responsible for the organization of inspection and acceptance, acceptance and fill in the inspection form before use. In the construction process should be professional management, inspection and warranty, and periodic settlement observation, found abnormal should take timely reinforcement measures.
Q:When scaffolding is erected on the base of the permanent structural concrete
. Among them, the specification of the steel pipe is from 0.5m to 6m, and the fastener mainly has a rotating shaft, a cross and a joint fastener. Bowl buckle scaffold also uses Phi 48, 3.5 wall thickness steel

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range