cast steel ringlock scaffolding brace end

Ref Price:
Loading Port:
China Main Port
Payment Terms:
Min Order Qty:
Supply Capability:

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Scaffolding Parts
Scaffolding Part Type:
Ringlock scaffolding parts
Delivery time:
Export standard packing

Packaging & Delivery

Delivery Detail:25-30DAYS OR UP TO THE QUANTITY


scaffolding brace end
1)ISO9001:2000 certified
2)Reupated Manufacturer since 1996
3)High quality and good service for your

Products Name: Ringlock scaffolding Cast steel diagonal brace end/   Left .Right  Brace end

Catogery: Layer/ Ringlock Scaffolding Accessory

Key words: Cast steel diagonal brace end

                      Scaffolding brace end

                      Scaffolding parts

                      Steel brace end

1)Material: Casting. Carbon Steel

2)Measure: Suitable for 48.3mm /60.3 mm pipe

3)Loading Bear: 5000KGS


5)Surface: Galvanized/Natural

6)Colour:   White

7)Production type: Forged. Pressed

8)Quality level: High level

9)Use:Construction or Set up Stage

10) Supply Ability: 200Ton/month

11)Delivery time: 25-30days

Product detail :

1.The surface of ringlock system scaffolding can be hot dip galvanized or oil painting to resist rust.

2.Ringlock system scaffolding are make up of ringlock standard,ledger,rosette and ledger end.

3.One ringlock standard is welded a ringlock rosette every 600mm or 500mm

4.A smaller diameter tube is weled at the bottom of scaffolding standard to inner connect standards from end to end.

5.Ringlock system is easy and quick to build up.You can join the standard and ledger by pushing the ledger end into rosette hole.

6.With good bearing capacity and easy assembly,ringlock system scaffolding is mainly used for ship building,stage building and outdoor repairing of high building.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How badly does getting an industrial/scaffolding piercing hurt?
my experience was easy and fast. it was the next day waking up that kills you! keep in mind that its thick cartilage, but it is really worth it. you'll get used to it by like day 3 or 4 but and tug or pull will remind you of the pain. i recommend it!
Q:What are the main safety problems when dismantling the scaffold
5, all construction materials must be set according to the material classification management requirements must be neatly stacked, "work finished, as material, the site is clean before work".6, on-site construction waste in a timely manner to clean up and deal with the designated place.7, scaffolding workers must be trained and qualified, safety examination, hold certificate to posts jiazigong.
Q:What is the difference between Scaffolding and Zone of Proximal Development?
Taken from okorder: Vygotsky believed that when a student is at the zone of proximal development for a particular task, providing the appropriate assistance (scaffolding) will give the student enough of a boost to achieve the task. Once the student, with the benefit of scaffolding, masters the task, the scaffolding can then be removed and the student will then be able to complete the task again on his own.
Q:How to remove the disc scaffolding ah, do not know how to get through the decoration
Third, remove the disc scaffolding accessories should pay attention to remind the construction personnel, in the construction site to fasten safety rope, take good safety helmet, wear good shoes. Don't dress because the weather is hot. Some of the equipment used to go to the mall to see where the extension is more complete.
Q:Standard Specification for bowl buckle scaffold
A new type of scaffold developed in China
Q:Topic?Scaffolding construction program how to doSpecial construction scheme
Full support calculation method:1, determine the above line load (ie, the length of a variety of meters, take the maximum);2, to determine the bearing capacity of the foundation (through the strengthening of the bearing capacity);3, according to the bearing capacity of the foundation, about how many square meters per square meter to determine the vertical tube, assigned to specific point load;4, to determine the number of tons of vertical pipe can be per ton (according to pipe diameter, wall thickness calculation of allowable stress);
Q:How much is the amount of material used to build a square meter double row scaffold? Urgent!
The following is a quote fragment: who knows how to use a square meter of the main raw material of double row scaffolding
Q:Can anyone give me a detailed design of a simple scaffolding?
can't draw here, but it's just an x with a flat board on top in 3 dimensions.
Q:When scaffolding is erected on the base of the permanent structural concrete
. Among them, the specification of the steel pipe is from 0.5m to 6m, and the fastener mainly has a rotating shaft, a cross and a joint fastener. Bowl buckle scaffold also uses Phi 48, 3.5 wall thickness steel
Q:A window washer is standing on a scaffold supported by a vertical rope at each end.. . .?
Sum moments left side...(assume worker 1m from left) Right rope = 316.516 Sum vertical.... Left rope = 552.484

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range