• Two Sides Texturd Hdpe Geomembrane to Prevent the Waste Water System 1
  • Two Sides Texturd Hdpe Geomembrane to Prevent the Waste Water System 2
  • Two Sides Texturd Hdpe Geomembrane to Prevent the Waste Water System 3
  • Two Sides Texturd Hdpe Geomembrane to Prevent the Waste Water System 4
  • Two Sides Texturd Hdpe Geomembrane to Prevent the Waste Water System 5
  • Two Sides Texturd Hdpe Geomembrane to Prevent the Waste Water System 6
Two Sides Texturd Hdpe Geomembrane to Prevent the Waste Water

Two Sides Texturd Hdpe Geomembrane to Prevent the Waste Water

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
5000 m²
Supply Capability:
500000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing


Waterproof Polyethylene Geomembrane with Colorful for Pond 

Waterproof Polyethylene Geomembrane with Colorful for Pond

 

Waterproof Polyethylene Geomembrane with Colorful for Pond

Waterproof Polyethylene Geomembrane with Colorful for Pond

Two Sides Texturd Hdpe Geomembrane Specification :

Thickness0.12mm-4.0mm
Length50m/roll,100m/roll,150m/roll or as your choice
Width5.0m-7.0m or as your choice
ColorWhite/Black/Blue/Green,mainly black
MaterialHDPE
Delivery portQingdao
Package:woven bag or as customers' requests
Product time

2-20 days

Features1.Good physical and mechanic performance
2.High tearing resistance, strong deformation adaptability
3.Puncture-resisting, aging resisting, ultra-violet radiation, oil and salt, and corrosion resistance
4.Good adaptability to high and low temperature, non-toxicity, long service life
5.Good waterproof, drainage, anti-seepage and damp proof effects
6.Complete width and thickness specifications, low cost and easy installation.
NoteWe can do as your demand,please feel free to contact us for more information


FAQ: 

1. How about the delivery time?    

    Two weeks upon receipt of down payment. 

2. What kind of payments do we accepted?   

   T/T, L/C, WesternUnion, MoneyGram. 

3. What's are the MOQ?   

    Normally the MOQ is 5000 SQM in theory. 

    And we can provide you free samples for quality inspection.  

4. Do you charge for the samples?   

    Accordeing to our company policy, the samples are freee, we only charge the freight fee. And we will return the freight fee in your second order.   

5. Can you produce the product according to customers' requirements?

     Sure, we are professional manufacturer, OEM and ODM are both welcome

 

 

Q:How do geomembranes prevent biogas leaks in production facilities?
Geomembranes prevent biogas leaks in production facilities by acting as a barrier between the biogas and the surrounding environment. These impermeable liners are made of flexible materials such as high-density polyethylene (HDPE) or polyvinyl chloride (PVC), which are resistant to the corrosive nature of biogas. By installing geomembranes in key areas, such as biogas storage tanks or digesters, they effectively contain the biogas and prevent any leaks or seepage, ensuring safety and maximizing the efficiency of biogas production.
Q:How do geomembranes contribute to the prevention of soil erosion in slope stabilization?
Geomembranes contribute to the prevention of soil erosion in slope stabilization by acting as a barrier between the soil and the external environment. They effectively reduce water infiltration into the soil, thereby minimizing the erosive forces caused by rainfall and surface runoff. Additionally, geomembranes help to improve the stability of slopes by providing reinforcement and reducing the potential for soil movement. Overall, their use in slope stabilization helps to mitigate the risk of soil erosion and maintain the integrity of the slope over time.
Q:What static eliminator is the best for large production equipment of geomembrane?
3024-L remote static eliminator is the best. The highest working voltage of the production equipment can reach 180KV. Otherwise, the quality of the products will decline seriously. So it is of great importance to eliminate static which can avoid the interference to production. At the place for reeling after dividing and cutting in the production equipment, the voltage of static electricity can reach 10KV which can be reduced by this eliminator.
Q:European electrothermal?film is good
With the same power european express furnace and electrothermal?film heater, the heating effect is basically the same. The difference is: the heat radiation of electrothermal?film is quick(up quickly), but also cool off fast, generally speaking, both amount of heat are the same: Heat resistance =current squared × electric resistance × time.
Q:How to measure the loss of geomembrane joints and related specifications?
In general, the construction of the geotechnical membrane is mainly by welding, and the lap?width is confined to the requirements of the specification. According to the requirements of "the lap width of the sanitary landfill field seepage systems engineering and technical specifications CJJ113-2007 ", lap?width of geomembrane: sweat soldering: 100±20(mm) squeezing welding 75±20(mm). According to our factory's experience, in general, the overlap loss of the geomembrane is between the 5%-8%, that is, for each1000 square meters of geomembrane, the loss is 80 square meters to 50 square meters. Construction site whose environment is relatively simple can calculate the loss according to 5%, complex construction site can calculate the loss according to 8%.
Q:Geotextile and geomembrane is not the same product ah?
No, geomembrane is based on the geotextile plus a layer of impermeable membrane
Q:How do geomembranes contribute to the preservation of water resources?
Geomembranes contribute to the preservation of water resources by preventing leakage and contamination. These impermeable barriers are used in various applications such as lining reservoirs, ponds, and landfills, and they effectively prevent the seepage of water or pollutants into the surrounding soil or groundwater. By maintaining the integrity of water storage and containment systems, geomembranes help conserve water resources and protect them from potential degradation or depletion.
Q:Can geomembranes be used in underground construction?
Yes, geomembranes can be used in underground construction. They are often used as liners to prevent seepage or leakage of fluids in tunnels, underground storage tanks, and other underground structures. Geomembranes provide an impermeable barrier and help to maintain the integrity of the construction.
Q:Is electrothermal film a big consumer of electricity?
The electrothermal film floor-heating system is intelligent. The film will automatically stop heating when the temperature of the surface of floor reaches the set point and then remain in the state of heat preservation. Actually it works only several hours a day.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords