• Steel Frame Formwork GK120 with Qualified Materials for High-rise Buildings System 1
  • Steel Frame Formwork GK120 with Qualified Materials for High-rise Buildings System 2
  • Steel Frame Formwork GK120 with Qualified Materials for High-rise Buildings System 3
Steel Frame Formwork GK120 with Qualified Materials for High-rise Buildings

Steel Frame Formwork GK120 with Qualified Materials for High-rise Buildings

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
300 pc
Supply Capability:
3000000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

1. Structure of Steel Frame Formwork GK120

 

The plywood is screwed on from the back when connecting frame and plywood, so the surface of the finished concrete is perfect.

The formwork series are a complete system with a full set of accessories, and can be set up flexibly according to project demand.

It can be widely used for industrial and civil construction and maintenance, such as workshop, large gymnasium, conference& exhibition center conversation, billboard, market, dock, tunnel, subways, etc. used for mobile working platform installation of electrical & mechanical engineering, ship repair and other decoration engineering, for building temporary stand ,with simple roof frame, frame-connected Scaffolding can from temporary dormitory, depot and work shed.

 

 

2. Main Features of Steel Frame Formwork GK120

 

  • High standardized system

  • Easy connection with adjustable steel clamp

  • Convenient and fast corner formwork

  • Flexible to assemble and application

 

 3. Steel Frame Formwork GK120 Images

 

 

Steel Frame Formwork GK120 with Qualified Materials for High-rise Buildings

 

Steel Frame Formwork GK120 with Qualified Materials for High-rise Buildings

 

 

 

4. Steel Frame Formwork GK120 Specification

 

-The steel frame formwork is plywood covered with hollow steel. The plywood is 18 mm thick.

-The frame is highly strengthened, and the wall formwork can bear lateral pressure 60 KN/m2 while the column formwork can bear 80 KN/m2.

-As a standardized system, it is flexible to assemble , wood batten can be filled to satisfy the need f of non-standard size.

-The adjustable steel clamp is convenient to use, and can hold tightly.

-There is a prizing part designed in the corner, which can help to position and remove formwork easily.

-The plywood is screwed on from the back when connecting frame and plywood, so the surface of the finished concrete is perfect.

-The formwork series are a complete system with a full set of accessories, and can be set up flexibly according to project demand.

 

 Steel Frame Formwork GK120 with Qualified Materials for High-rise Buildings

 

 

5. FAQ of  Steel Frame Formwork GK120

   

1) What can we do for you? 

    .We can ensure the quality of the Timber Beam Wall Formwork and avoid extra expenses for customers.    

    .We can provide you the professional technical team.    

    .We can provide professional building proposal for your projects.  

2) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.    

Q:A 60.0 kg painter is on a uniform 25 kg scaffold supported from above by ropes. There is a 4.0 ? kg pail of paint to one side. Can the painter walk safely to both ends of the scaffold? If not, which end(s) is dangerous, and how close to the end can he approach safely?
missing data. How much tension can each rope sustain, how much tilt will the scaffolding undergo through movement. You have to be missing some data, that question is unanswerable too many variables.
Q:Hester Prynn stands on a scaffold
In medical college they had to take notes rather at once. commencing off to be a doctor isn't that straightforward now, the fee of their writing messep up their handwriting and that they do now no longer care approximately it after commencing off to be a doctor.
Q:I have a cartilage piercing on my right ear and now I want scaffolding. Can they just pierce the other side of my ear (opposite my other cartilage piercing) and put a scaffold bar through my existing cartilage piercing hole and the new piercing hole opposite? Can I then get another cartilage piercing straight underneath the scaffolding? How much does it hurt? Thanks in advance :)
i've got heard it feels extra like a pinch. The septum piercing does not extremely bypass during the cartilage or something, in case you pull the midsection of your nostril down, there is slightly of epidermis there. that's the place the piercing is going via. My suggestion is to pinch it (in case you have nails) consisting of your nails, and you have the hassle-free thought of the 'oh, owch.' feeling? :]
Q:The amount of bowl buckle scaffolding, know the area of 50000m2, height 6m, how to calculate the number of posts with the root, the number of bowl buckle on the number of how many?
Unable to determine pitch and step reference 0.6m and 1.0m
Q:What is the difference between the bowl buckle scaffold and the fastener type steel pipe scaffold? What is the difference
. Its main function is to protect. Specific reference to JGJ 1302011 "construction fastener type steel pipe scaffolding safety technical specifications" in the relevant instructions, and illustrations.
Q:I've had my industrial piercing for almost 5 years now and I was wondering if I was to take it out if it would close up or how long it would take to close. And after I take it out will it be noticeable that it was there.
If you had it for 5 years it won't close up since its healed up. The holes on mine are pretty small but I have hair covering mine so you can't see it but I've only had mine a little over a month. I do have other piercing that haven't ha anything in for a while and they are not closed like my belly button and I got that done about 7 years now.
Q:what is differences between scaffold and scaffolding?
Scaffold is what scaffolding is constructed of.
Q:I bought 100 tons of scaffolding steel pipe, according to the 150 tons of rack pipe to prepare various kinds of fasteners and fastening screws. How to calculate.. Thank you all
Specification for general practical design expressions"Uniform provisions" according to two kinds of components (bending and axial compression) and two load (no combination of wind load and wind load combination) the general practical design formula of scaffolding structure are given, a total of two groups of 4.
Q:It's not fixed to the building and it looks as though a heavy gust of wind would send it crashing down. How exactly does scaffolding stay up and not topple over?
Well, it is attached to the building - not very strongly, but enough to keep it directly over the feet. The feet are adjusted to keep the part above them vertical so forces are straight down - easily achieved with a plumb bob on a string parallel to the pipes. Many scaffolding installations extend around a corner and with the diagonal bracing built in that provides stiffness. And scaffolding for working on a building is protected by the building, which blocks the air flow and slows it down from in the open air. Scaffolding towers, such as lighting at a concert or other special event (golf tournament) are guyed with wires/cables going out at an angle to anchors in the ground - these are often nearly invisible at any distance.
Q:Is there any other stores that are like Home Depot that sales building materials and scaffold?
I do not know where you live, but we also have a Menard's and Lowes. They both sell building materials.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords