• Galvanized Cuplock Scaffolding for Building Constrcution GCS-08 System 1
  • Galvanized Cuplock Scaffolding for Building Constrcution GCS-08 System 2
Galvanized Cuplock Scaffolding for Building Constrcution GCS-08

Galvanized Cuplock Scaffolding for Building Constrcution GCS-08

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
20000 kg
Supply Capability:
500000 kg/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Galvanized Cuplock Scaffolding for Building Constrcution GCS-08

 

Galvanized Cuplock Scaffolding are used in bridge, tunnel, petrifaction, shipbuilding, railway, airport, dock industry and civil building widely.

 

Introduction:

Specification

 

Product name

Galvanized Cuplock Scaffolding for Building Consctruction GCS-08

Components

standard ,ledger, diagonal , top cup, bottom cup,

Ledger Blade

Material

Q235/345/195

Surface

galvanized, Hot dip galvanized, Painted

color

red paint, blue paint, yellow paint, green paint,   bright galvanized

Packing

Bulk or Bundle with steel strip

 

 

Size of Galvanized Cuplock Scaffolding

 

Standard

Ø48.3×3.25

Q345

Ledger

Ø48.3×3.25

Q235

Diagonal

Ø48.3×3.25

Q235

Size/mm

Weight/kg

Size/mm

Weight/kg

Size/mm

Weight/kg

500

3.45

600

2.54

1300×2000

9.21

1000

5.58

900

3.60

1800×2000

10.31

1300

7.97

1000

4.10

2500×2000

12.16

1500

8.74

1200

4.70



1800

10.60

1250

5.00



2000

11.38

1300

5.20



2500

14.00

1600

6.30



3000

16.63

1800

7.00





2500

9.54



 

 Advantage of Galvanized Cuplock Scaffolding:

●Structure is simple so that install rapidly.
● High strength and durability
● Longer working life
● Flexibility.
Multi-functional in use.

 

More Detail Pics

Company Profile 


We company is a professional supplier of scaffolding systems, scaffolding couplers, and other

related products. With good quality and competitive price, our products are very popular in European, Australia, North America, and South East Asia and some African countries. 
We can supply many kinds of pressed and forged scaffolding coupler, such as swivel coupler, double coupler, sleeve coupler, putlog coupler, German type, British type, American type, Japanese type and so on 

We have full set of production equipment, including model machine, punching machine, rolling machine, sand blasting and etc. These production equipments will show how the products are produced and we also can produce as your requirements using these equipments. 

 
Packaging & Delivery 
Packaging: Woven bags with pallets or Customer needs 
Delivery: Within 30 days after confirmation or as your requirements 

FAQ

●Q: What's your MOQ(minimum order quantity)?

 A: 20000KG 

 

● Q: What's your packing methods?

   A: Packed into bundle, and rest in bulk.

 

● Q: What's your payment terms?

  A: T/T or  L/C 

 

●Q: What's your delivery time?

   A: 10-20 days after received the payment 

 

● Q: Can we visit your factory?

   A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.


Q:Are these pieces similar in their musical representation and programmatic portrayal of death and the supernatural as a serious, dark and sinister experience?
they are both similar as the both revolve around death
Q:Explain the principles of scaffolding?
Scaffolding is a temporary platform constructed for reaching heights above arms in building construction, maintenance, or repair. It is usually made of metal or aluminium and can range from simple to complex in design, depending on its use and purposes. Principles of Scaffolding : 1. Reducing the number of tasks required to solve a problem. 2. Maintaining the pursuit of the goal. 3. Controlling the risk in problem solving. 4. Ensure the safety of users.
Q:The amount of bowl buckle scaffolding, know the area of 50000m2, height 6m, how to calculate the number of posts with the root, the number of bowl buckle on the number of how many?
These quantities can only be estimated in the absence of drawings.Height of 6 meters, the total root number = the total number of vertical pole = upper support number. Pull rod and diagonal rod according to the number X4.
Q:The previous answers to this question are either wrong or sketchy. The movie, Agony and Ecstasy didn't come out of thin air - but out of some good research by Oliver Stone, who knows way more about the subject than anyone who has answered before. Further, there's actual scholarship (most of it used by Stone) to answer the question. So let's see an answer with citations.
This Site Might Help You. RE: How did Michelangelo paint the Sistine Chapel and what did the scaffold look like? The previous answers to this question are either wrong or sketchy. The movie, Agony and Ecstasy didn't come out of thin air - but out of some good research by Oliver Stone, who knows way more about the subject than anyone who has answered before. Further, there's actual scholarship (most...
Q:what is differences between scaffold and scaffolding?
Scaffold is what scaffolding is constructed of.
Q:What is the tension in each wire?a.Left wire = 40 N; right wire = 160 Nb.left wire = 200 N; right wire = 80 Nc.Left wire = 160 N; right wire = 40 Nd.Left wire = 240 N; right wire = 120 NThank You!
The sum of the two tensions must equal the total weight supported so Tl + Tr = Wb + Ws = 200 + 80 where Wb is the weight of the box and Ws the weight of the scaffold. That's enough to choose the right answer, but to actually compute the tensions, you also need the torque equation. The sum of the torques around the left end of the scaffold must be 0 since the scaffold isn't moving. That means: 0 = (1.0) Wb + (2.5) Ws - (5.0) Tr where 1.0, the 2.5, and the 5.0 are the radii corresponding to the forces. So you can solve for Tr and then Tl.
Q:Mechanical model, stability, etc.
Scaffolding classificationScaffolding is a temporary structure frame for the construction, installation and construction of materials, materials and construction operations.1 according to the materials used: divided into wooden scaffolding, steel scaffolding and ladders.2 according to whether it can be moved: divided into mobile scaffolding and fixed scaffolding.3 according to the nature of the construction: divided into construction scaffolding and installation scaffolding.4 according to the form and use of the overlap into
Q:Cost of rent per day per month per ton of scaffolding
, so it is difficult to make it clear here, to see where you are in which company rented
Q:Is there any other stores that are like Home Depot that sales building materials and scaffold?
I do not know where you live, but we also have a Menard's and Lowes. They both sell building materials.
Q:Bowl buckle scaffold is not a steel pipe scaffolding
The buckle of the bowl buckle scaffold can be welded with a bowl buckle, and the node is mainly fixed by a bowl buckle

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches