• 20 Tons Hammerhead Tower Crane for Construction System 1
  • 20 Tons Hammerhead Tower Crane for Construction System 2
  • 20 Tons Hammerhead Tower Crane for Construction System 3
20 Tons Hammerhead Tower Crane for Construction

20 Tons Hammerhead Tower Crane for Construction

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
20 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Description of our Tower Crane

1) TC60/10 tower crane is one of the key product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected

3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

The range-change structure drives the dolly to change range on the horizontal arm, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.

5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator.

Advantage of our tower crane
1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.
2, suitable for the group of tower cross homework.
3, boom stability is good, combination amplitude range.
4, suitable for height have special requirements occasions construction.
5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

Specification of Tower Crane

Model

QTP80 (TC5511) (Flat-Top)

Max Working Radius (m)

55

Free Height (m)

41

Max Load (T)

6

Tip Load (T)

1.1

Max Height (m)

161

Wall Ties for Max Height (sets)

8

Main Material Specs (mm)

Square Steel Tube   1352*12

Mast Section Dimension (m)

1.835*1.835*2.5

Hoisting Speed (m/min)

80/40/10

Min Steady Falling Speed (m/min)

5

Slewing Speed (r/min)

0-0.62

Radius-changing Speed (m/min)

40/20

Jacking-up Speed (m/min)

0.6

Total Motor Power (kw)

60

Independent Structure Weight (kg)

37800

Counter Weight (T)

16.2

 

20 Tons Hammerhead Tower Crane for Construction

20 Tons Hammerhead Tower Crane for Construction

 

Q:Jin Title required 20 large equipment testing reports. The personnel system is really rubbish, so we don't know what to do professionally.
General purpose gantry cranes: MG, 440t, MG, 360t, MG, 450t, Me, 360t, ME, 900tGeneral purpose bridge crane: QD, 350t, QD, 400t, QD, 450t, QD, 390t, QD, 330t, QE, 350t, QE, 330tThe above tonnage is now recognized as a large lifting machinery.Hoisting machinery refers to the lifting of heavy objects with hooks or other lifting devices, and mechanical operations such as lifting and moving in space. There are many classifications of cranes, such as cranes, cranes, cranes, cars and so on. They are commonly referred to as one or more kinds of cranes.
Q:Notice of tower crane
Please refer to the technical regulations for the safety of installation, disassembly and use of tower cranes in construction;The following is copy:3 installation of tower cranes3.1 conditions for installation of tower cranes3.1.1 tower crane installation unit must have the construction administrative departments issued the contracted professional qualification and heavy equipment installation engineering construction enterprises safety production license. Tower crane installation units must be engaged in the installation of tower cranes within the scope of qualification permit.In addition to the professional and technical personnel who have the qualification standard, the installation units of 3.1.2 tower cranes shall also have professional personnel who are in line with the project. The person in charge of the project, the project manager and the full-time safety management personnel shall have the certificate of safety production inspection. Tower cranes, installers, electricians, drivers, signal engineers, cable operators should have special construction operation qualification certificates.3.1.3 construction units shall sign professional contract for installation engineering with the installation units, and make clear the responsibility of both sides for safety in production. In case of general contracting of construction, it shall be signed by the general contractor and the installation unit.
Q:So I have this teacher for almost 4 years and I didn't very much liked her style of teaching. During my sophomore year I was getting fed up with having her in my favorite class. Unfortunately she got ovarian cancer. Now that I think for what she has done and not acknowledging her, I feel really bad. To make things up I wanted to give her I guess the 1000 cranes before I leave for college.Is it okay to give it to her? If so, what do you do once you have all 1000 of them folded?
Well I don't think u have anything to feel bad about. Does everyone need to be treated like some kid of a hero because they have cancer? I think that is stupid. With all the people in the world everyone is gonna dislike someone. A ***** is a ***** no matter what disease she may have. After you fold 1000 cranes I think you are supposed to make a wish. Now if you wished that there was something that would remove her from your class, then I would feel guilty.But other than that I don't think you have anything to feel bad about. Or if you were really hard on her too but don't think that jut because she has cancer that she can be a ***** and everyone has to worship her. That is just bullshit. If she gives **** than she must be prepared to take ****. And as for giving them to her, I think it would be a nice gesture, but just think about it. What would you do if someone gave u a thousand paper birds? I think very few people would keep them. Now I don't know if you are supposed to give them away, but if you are, I think you should ive them to someone who means something to you personally and not because they have a disease. It is human nature to not like someone and just because they have cancer it shouldn't change that unless this experience has made them a better person and all that **** that you always hear about. But I don't think you have anything to feel bad about and not liking a teacher is completely normal. Please e-mail me your thoughts on this.
Q:I've looked on the internet and I haven't found anything so far. The paper on it is due tomorrow...arrrggghhhhh...
Hi, Briisthe! Just go into Google and type - what is the migration route of the whooping crane? Then click on the article - Journey North Whooping Crane Migration Then click on the maps and all will be revealed.
Q:What qualifications do you need to be a Crane Operator in QLD, Australia?
You need to do a specific amount of hours in training to be a crane operator in Australia, I know that in Sydney, you are certified by the WorkCover Authority, or that's how it was many yeas back. Special emphasis is on loads, and point of load. We do not need a mobile crane tipping over do we. Safety, working near electrical, and on soft ground. Weight you can extend to on a jib. etc.
Q:What is the difference between a tower crane QTZ31.5 and a QTZ40?
the length of the arm is 42-48 meters; the elevation is 29-32 meters.
Q:what would you wish for?also, when your done making your 1000 cranesm what do you need to do next? to like, make your wish come true??
1,000 paper cranes? like sadako? i love that story! 3 wish for anything you want, i've never heard of a limitation of what you could wish for :) i've also never heard of something else you had to do after you made the cranes to make your wish come true, so i'm pretty sure all you have to do is fold the cranes.
Q:A. Power LinesB. WaterC. FiresD. Overturns
Um, caused by operators who get their training on Yahoo Answers? Overturns are more dangerous to others, a couple years ago a crane killed someone in an apartment across the street from where the crane was working, in a city not far from where I live, but the operator survived. However power lines might be more dangerous to the operator since I suspect they happen more often.
Q:The mansion I'm talking about is made in the American colonial architectural style, it is made from red bricks and has a colossal white, Doric octastyle portico. There are many windows and French doors at the front and it is situated at the top of a neatly manicured hill.
the okorder /... i hope you find the name after all .
Q:how do u build a hydraulic crane using syringes. it's a science project. can u give me websites or if u know details.
Do okorder

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords