Pe Ri

Hot Products

FAQ

Last year just cross the room, will the ground to freeze it? How big is it possible? If it is possible to crack, need to press to determine it? Question added: no live, to warm should be no water. More
Too cold, if the indoor temperature below 5 ℃ will crack. If you do not need to do some maintenance. Maintenance methods: winter should not pay attention to heating, should prevent the water separator parts and heating pipe in the water clogging the pipeline. If the indoor temperature is lower than 5 ℃, the system should be used in the air compressor all blown out, to prevent the child fat forging forging crazy Fist Fist system is frozen. Winter should not be enabled when the geothermal heating system should pay attention to protection, to prevent the water diversion components or heating pipe in the water icing.
What is a family independent heating system
Own heating, and has nothing to do with others
Electricity to warm and water to warm contrast
Before the water is warm, it is electric to warm. The first is because the gas costs continue to rise, and electricity began to appear electricity peak and trough, the second is because the water can not be closed after the warm, can not be laid single room, and now warm home warm, warm floor, According to the time, the district of different ways of the switch, power consumption is also low, so what is better and worse than the factory to determine Yao Deng witnessed super cunning, landlord should understand.
Radiator parallel system how to take pictures
The installation of the radiator is divided into two forms: the installation and installation of the radiator. The installation steps include the installation of the pipe, the installation of the radiator, the installation of the boiler, the pressure test and the customer acceptance. Trouble, need to slot and install the set of water, for the decoration of the housing, the general choice to install the radiator, installed both convenient and not damage the indoor decoration effect. 1. Laying the pipeline in advance with the customer to communicate with the location of the radiator after the installation of the need for the layout of the pipeline, the pipeline is generally in the ceiling, baseboard and other hidden places, the laying of the tube as much as possible not to affect To the interior decoration or take up too much space. 2. Install the radiator in the process of installing the radiator to the radiator to be stable, and to use the level of measurement to see if the installation is smooth, and then the valve connection and inlet and outlet valves connected, after checking the correct The pipe clamp is reinforced. 3. Installation of the wall-mounted boiler The installation of the boiler should be noted that with the open line and electrical equipment separated from the flammable and explosive materials can not be on the hair to promote the safety of the body, Table and gas stove should be more than 300mm distance. 4. Stress test and customer acceptance Construction workers in the pipe stamping test when there is no run, run, drain, drop and other phenomena, confirmed by the customer after the inspection can be accepted.
Home old house want to install to warm how to do?
The old house to warm the way of heating must be part of the height of the floor to install the company to lay the ground to reduce the general level of 6-8cm. For many old houses only 2.5m layer height, the impact is still relatively large. Modified to warm is not the best way to heat, and to warm the laying of concrete will be filled with a direct increase in the construction of the ground load. Usually in the area per square meter to increase the weight of about 120kg, so the old room to install the ground to consider the load capacity of the ground. The components of the warm system look very simple, only a simple combination of pipes, sinks / separators, but in fact it contains complex techniques. For the warm design has a very detailed requirements, and in the actual design, a lot of warm installation companies are directly follow the original design. Such a result will be very easy to cause the room temperature uneven situation, laying the program unreasonable easily lead to the use of poor user results. So the old house to install warm, be sure to find the strength of a dedicated designer and their own construction team to install the company to the formal. There is a dry shop to warm, is the direct shop module, and then to warm the tube in the module card slot, the top of the shop directly on the floor, but relatively rare.
The first time this year, warm, how should open, pay attention to what
Open the pipe cutting door, open the small tube to warm the door, the water separator to open, to the water discharge....
1000 square meters to warm how much electric boilers, where to sell?
160 about 24KW on it!
What is the difference between a single-fired stove and a dual-purpose stove for a gas-fired boiler?
Single heating can only heating the heating film or to warm with the use of heating and hot water can be used to provide hot water