• China Supplying Air Vent Diffuser HVAC systerm System 1
  • China Supplying Air Vent Diffuser HVAC systerm System 2
  • China Supplying Air Vent Diffuser HVAC systerm System 3
  • China Supplying Air Vent Diffuser HVAC systerm System 4
  • China Supplying Air Vent Diffuser HVAC systerm System 5
  • China Supplying Air Vent Diffuser HVAC systerm System 6
China Supplying Air Vent Diffuser HVAC systerm

China Supplying Air Vent Diffuser HVAC systerm

Ref Price:
get latest price
Loading Port:
Ningbo
Payment Terms:
TT OR LC
Min Order Qty:
500 pc
Supply Capability:
999999 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specification of Air Diffuser

 

Supplying Air Diffusers 
-Frame Thickness: 1.0mm /0.8mm
-Any Size be customed 
-Powder Coated RAL 9010/9016

  

Usage of Air Diffuser

 

The grille is suitable for ceilling  sidewall, soffit or cill mounting and may be used for supply or extract applications. 

Typical installations include offices, shops, hotels and most commercial or industrial buildings.

Available as standard in white polyester powder coat finish. 

Other polyester powder  coat finishes are also available as an option.

 

China Supplying Air Vent Diffuser HVAC systerm

China Supplying Air Vent Diffuser HVAC systerm

China Supplying Air Vent Diffuser HVAC systerm

China Supplying Air Vent Diffuser HVAC systerm

China Supplying Air Vent Diffuser HVAC systerm

China Supplying Air Vent Diffuser HVAC systerm

 

FAQ of Air Diffuser:

 

1, What's size do u have for round type diffuser?

A: We have face size from 150mm to 550mm,neck size from 250mm to 400mm

 

2, Do u still have other types ?

A: Yes, we have round diffuser/ rectangle diffuser/ linear grilles/ baseboard diffusers,etc

 

3, What's the most early delivery time?

A: Within 25 days for each 40'fcl

 

Q:Do you have a brand name?
Should have it, this you can go to the Internet query, in fact, only online inquiries, because they do not know where the 粻 笭 Gang locusts Hao Hao Tong Jun Kun. But to warm the tube also has the brand of St. Lawrence, before the main to do the radiator, and now warm to do is also good.
Q:110 level two-story to warm the boiler heating and living hot water with much model
The standard fireplace on it
Q:What is the warm lead of the heating cable
You can understand the next million warm smart electric heating system technology mature product quality guaranteed heating cable ten years warranty thermostat two years warranty period comfortable, healthy, energy saving, environmental protection, the best choice for home heating.
Q:Home coal-fired heating stove and electric heating furnace which is good
Coal, cheap to save money. Electricity, clean and easy to control, expensive
Q:Toshiba home central air conditioning how?
Now the central air conditioning to do is good in Japan, such as Daikin, Hitachi, Toshiba, Mitsubishi Electric, Mitsubishi heavy child twist twist thieves Lou Lou Lou workers, etc., are very good Japanese goods. To be made, then Hisense is good, Hisense can be comparable with Hitachi
Q:What is the mixing device in the warmth?
2. The use of electric three-way valve cooling water cooling device The advantages of this warm water cooling device is: (1) set with a thermostat and according to changes in water temperature control installed in the high temperature water inlet valve body opening, thus changing High temperature water intake,
Q:Do not smoke in winter, do not smoke, the tube will be frozen it
There is no way, because the neighbors heating even if you do not have no problem, if it is a cottage or single-family villa to die, cottage or single-family villa facade, directly facing the surrounding air, heat loss is particularly large, the wind Cold coefficient is also large. Such as the tiger ridge bogey Fan Huan song but attack the special encounter weather, may be frozen, it is best to let go of the water, just in case.
Q:From the HVAC design to explain, to specific methods, please do not talk about the general, probably like, confused for a long time, please enlighten the gods ~ ~ ~ more
First, the warmth of the water pipe according to the design requirements of the experimental pressure (such as the design is not clear requirements of the experimental pressure are 1.5 times the working pressure, but not less than 0.6MPa) at the experimental pressure for 10 minutes, the pressure drop is not greater than 0.02MPa and then pressure To the work pressure, check the pipeline is not infiltration everywhere, do not leak for the above process will be completed in accordance with the above conclusions can be qualified or unqualified conclusions, and then the relevant personnel to confirm the second, warm duct main inspection duct, After the production of the mouth of the mouth, riveting holes, duct flange flanging, ducts between the tight links, inspection to the main, trunk-based. Different pressure levels of the ducts used in the test method of different low-voltage system can be used to test the light leakage method of the sea in the suppression of the Soviet Union to adjust the pressure system should be leaked in the leak test after passing the air volume test of the high pressure system all the air leakage If you feel useful, please use, worthlessly so hard
Q:Is a new type of wall-mounted heating panels, electricity is one-third of air conditioning
This can be warm, but also optional picture, looks like a painting
Q:Home to install 400 atmospheric boiler on the first floor, to the second floor for the warm, the water tank in the boiler next to the circulation pump is 500 watts head 8 meters, equipped with a check valve, Equipment into the export are installed automatic valve, but the temperature of a 40 degrees there is gas parked in the pump, the hot water on the up, please enlighten me master
There are two factors that affect your pump work: First, the pump long-term flow is small or sometimes no flow (which may be temperature control action and other reasons), then the pump kept turning the pump hot water temperature vaporization. Second, the pipeline installation problems, the pump can not automatically row of the system row row of the law of the degree of defense, but the power point, automatic discharge. Solution: The reason is determined by the nature of the system, not easy to change, you can change a way to control the way through the pump to control the indoor temperature (of course, a pump to a number of room heating, this law does not work) The The reason two need to transform the pipeline, you use the pump is generally a pipeline pump can be changed to vertical installation, and the installation height is lower than the water separator, the middle do not impede the bubble rise of the parts and elbow, so pump bubble Can be automatically discharged into the water separator, and then through the automatic exhaust valve discharge.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords