HVAC Related Square air Vent Diffusers steel & aluminium

Ref Price:
Loading Port:
Ningbo
Payment Terms:
TT OR LC
Min Order Qty:
500 pc
Supply Capability:
999999 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Specification of Air Diffuser

Supplying Air Diffusers 

-Frame Thickness: 1.0mm /0.8mm
-Any Size be customed 
-Powder Coated RAL 9010/9016

-1-4 curved blade air diffusers

  

Usage of Air Diffuser

The grille is suitable for ceilling  sidewall, soffit or cill mounting and may be used for supply or extract applications. 

Typical installations include offices, shops, hotels and most commercial or industrial buildings.

Available as standard in white polyester powder coat finish. 

Other polyester powder  coat finishes are also available as an option.

 1

Item

HVAC aluminum air conditioner grille

 2

Materials

Extruded Aluminum alloy (6063-T5)

 3

Blade

Blades in 45°from aluminum profile or as customer’s requirements

 4

Bar spacing

30mm as standard or as customer’s requirements

 5

Materials

0.8mm, 1.0mm, 1.2mm, 1.5mm or according to the customers’ 

 6

Surface Finish

Powder coated, Anodized , PVDF, Mill finish.

 7

Size 

Width x Height, any sizes available

 8

Powder for Finish

Environmental protection and non-toxic, and Color to keep 5 -10 years.

 9

Color

Refer to RAL colors swatch or customized colors available

 10

Design

Drawings designed according to the customers’ requirements

 11

Payment terms

T/T, L/C, PYAPAL, etc.

 12

Delivery time

Usual 15-20 work days for a 40GP container 

 13

Package details

Bubble wrap + Cartons for FCL,  Bubble wrap + Cartons + Wood-box for 

 14

Mesh

Stainless steel security mesh, Aluminum security mesh

 15

Type

Fixing and adjustable installation



Products show

HVAC Related Square air Vent Diffusers steel & aluminium

HVAC Related Square air Vent Diffusers steel & aluminium

HVAC Related Square air Vent Diffusers steel & aluminium


Production line

HVAC Related Square air Vent Diffusers steel & aluminium

 

FAQ of Air Diffuser:

 

1, What's size do u have for round type diffuser?

A: We have face size from 150mm to 550mm,neck size from 250mm to 400mm

 

2, Do u still have other types ?

A: Yes, we have round diffuser/ rectangle diffuser/ linear grilles/ baseboard diffusers,etc

 

3, What's the most early delivery time?

A: Within 25 days for each 40'fcl

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:One hundred and seventy square meters of house electric heating to use much of the furnace?
One hundred and seventy square meters of house electric heating to use much of the furnace?...
Q:Components of solar water heaters
The main part of the water tank, bracket, vacuum tube composed of three parts. But the whole, the light solar water heater host this part is only a semi-finished products, there should be part of the parts should contain the control system, electric heating and piping part.
Q:How to use the Hilbo boiler
Warm heart Beibei boiler website has a generic manual.
Q:How to build electric heating
How to build electric heating...
Q:Is not to warm the total valve opened on the line, do not control the room valve
If you automatically control the system, open the total valve will not control. If not, where the need for heating to open the corresponding area of the valve, where do not need to turn off the corresponding performance of the following. When running, the total access to the water ball valve have to open.
Q:How to connect the natural gas boiler
There are five tubes below the natural gas boiler, look at the instructions you will understand. They are: heating water, heating back to the water, tap water, sanitary hot water, gas pipe. 1, connected to warm, then, is the "heating water", "heating back to the water," the two water pipes connected to the floor to the water heater, the warm water separator has two rows of metal valves, two joints, and the boiler Of the heating water, heating back to the water two interface docking. Usually above a row of water supply, the following row of water back. But it does not matter. 2, the gas pipe and the gas pipeline to be connected at home, if the home inside the gas pipeline only one connector, to take a three links before they can connect the boiler and gas stove. 3, tap water, and the home should be connected to the water pipe, used to add pressure to the heating system, and the supply of bath, wash your face, vegetables and other water. 4, sanitary hot water and water, and the need for hot water at home tap, such as shower, washbasin, wash the pool and so on. Note 1, 1, the connection of the boiler related to the installation of gas pipeline transformation, the need for a corresponding qualification, and to the local gas company to declare. 2, in the clear understanding of each interface before the boiler, do not rush to connect, boot, so as to avoid damage to the boiler parts. 3, the boiler / floor heating work pressure generally 1-1.5bar between the working temperature of 45-55 ℃ between. Too high temperature and pressure, is not conducive to the warm life. Maidi Si boiler, dedicated to your service.
Q:Can the warm pipe be used as a drinking water pipe?
If the floor is warm to the PPR tube, there is an unpleasant taste of the field slump dry limbs dug Shi Bao gradually, it is best not to do drinking water pipes. If the PEXC tube should be no problem. Provided that it must be qualified,
Q:Precipitation of pulverized geothermal cleaning machine
Do not have a lot of community and heating companies are prohibited to use the pulse to wash the heat to hurt the underground pipe joints only allow long and short pressure cleaning machine, but the individual can not buy. Simple section is estimated to be listed soon!
Q:New house can not keep warm in winter?
Too cold, if the indoor temperature below 5 ℃ will crack. If you do not need to do some maintenance. Maintenance methods: winter should not pay attention to heating, should prevent the water separator parts and heating pipe in the water clogging the pipeline. If the indoor temperature is lower than 5 ℃, the system should be used in the air compressor all blown out, to prevent the child fat forging forging crazy Fist Fist system is frozen. Winter should not be enabled when the geothermal heating system should pay attention to protection, to prevent the water diversion components or heating pipe in the water icing.
Q:Solar water heater mixing valve pressure balance
You can choose a thermostatic valve

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range