• Water return Value and water distributer  For Floor Heating  System System 1
  • Water return Value and water distributer  For Floor Heating  System System 2
  • Water return Value and water distributer  For Floor Heating  System System 3
Water return Value and water distributer  For Floor Heating  System

Water return Value and water distributer For Floor Heating System

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
50000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Description:

Manifold for floor heating 


Specification:

materail:304 stainless steel 

size:1" *3/4" 2-12 loop 


Features:

1.With visual flowmeters in supply part to adjust the flow of each loop precisely.

2.With thermoelectrical motor and control valve in return parts to control the temperature automatically in the system.

3.The exhausted gas in the system can be released automatically by the automatic exhaust valve.

4.Drainage valve is convenient for draining and pressure testing.

5.It is convenient for installation and maintenance with movable connection fitting.

6.Double-sealed, safe and reliable.


Photo:


Water return Value and water distributer  For Floor Heating  System

FAQ:

① why from okorder?

Okorder is a qualified supplier of all kinds of building matierials in China. All products have been showed in Okorder website are under well controlled by okorder QC team.

All products had been produced under a clear quality standard and the quality is consistence among the shipments.

Okorder has already setted up more than 20 warehouses in different markets to show the products. You are convenient to know the products from your local place and it will help you to make decision easyly.  

②How to guarantee the quality of the products?

We have established a perfect quality management system,as for raw material and semi parts all are under strict quality test and we have a IQC system to control the purchases.

QC on site is very strict and all steps of process are measured per drawings. Before delivery, we set a OQC system to make sure each piece meet the standard of order.from design to delivery, 

③How long can we receive the product after purchase?

Lead time depending on order quanity, The normal order can be deliveried with 3 weeks.






Q:To warm or water pipe leakage from the time of the warranty period
Installation of the general two-year warranty period. If there is a problem with quality without warranty
Q:Air to warm running costs are not high, 100 square meters a month about how much money?
Probably in the four or five hundred yuan left 粻 笭 Gang locusts Hao Hao Tong Jun right, but the regional environment, housing insulation performance also affect the operating costs, such as energy efficiency in the South and the North will be different.
Q:Collective heating, and their own to change the use of heating valve installed
Install a mixed water center to prevent the temperature is too high and affect the life of the warm pipe to warm the temperature is generally maintained at about 60 ℃
Q:Public bath with water heating
The cost is too high to operate.
Q:What does building HVAC include?
Heating (heating) ventilation air conditioning
Q:Radiator parallel system how to take pictures
The installation of the radiator is divided into two forms: the installation and installation of the radiator. The installation steps include the installation of the pipe, the installation of the radiator, the installation of the boiler, the pressure test and the customer acceptance. Trouble, need to slot and install the set of water, for the decoration of the housing, the general choice to install the radiator, installed both convenient and not damage the indoor decoration effect. 1. Laying the pipeline in advance with the customer to communicate with the location of the radiator after the installation of the need for the layout of the pipeline, the pipeline is generally in the ceiling, baseboard and other hidden places, the laying of the tube as much as possible not to affect To the interior decoration or take up too much space. 2. Install the radiator in the process of installing the radiator to the radiator to be stable, and to use the level of measurement to see if the installation is smooth, and then the valve connection and inlet and outlet valves connected, after checking the correct The pipe clamp is reinforced. 3. Installation of the wall-mounted boiler The installation of the boiler should be noted that with the open line and electrical equipment separated from the flammable and explosive materials can not be on the hair to promote the safety of the body, Table and gas stove should be more than 300mm distance. 4. Stress test and customer acceptance Construction workers in the pipe stamping test when there is no run, run, drain, drop and other phenomena, confirmed by the customer after the inspection can be accepted.
Q:How to use geothermal cleaning machine
With the instructions to say with the instructions, and then not to the place to buy usage
Q:Heat pump air conditioning principle:
When the air conditioner is in the cooling operation, the low-temperature and low-pressure refrigerant gas is sucked by the compressor and pressurized into a high-temperature and high-pressure refrigerant gas. The high-temperature and high-pressure refrigerant gas exothermic (condensed by the condenser) in the outdoor heat exchanger Into the medium temperature and pressure of the liquid (heat through the outdoor air to take away), the temperature and pressure of the liquid and then through the throttling components throttle down after the low temperature and low pressure into the liquid, low temperature and low pressure liquid refrigerant in the indoor heat exchanger heat (The indoor air is cooled and cooled by the surface of the heat exchanger to achieve the purpose of lowering the indoor temperature), and the low-temperature and low-pressure refrigerant gas is sucked by the compressor and circulated as described above. Air conditioning in the heating operation, through the two four-way electromagnetic valve, reverse Carnot cycle, to achieve heating.
Q:Which brand is good for the boiler? Both good quality and good?
Cost-effective, energy-saving, more advanced technology, Italy, Erica fireplaces
Q:Home gas boiler why the circulating pump is always non-stop turn?
Circulating pump during the heating work, as well as the user when using hot water, is to be running. In the following three cases, the circulating pump of the boiler will rotate. 1, it needs to heat the heating water to the radiator, to warm the end of the heat, the cooling of the low-temperature water pump back to the combustion chamber of the heat exchanger. 2, for the plate for the model of the boiler, the use of hot water when the circulating pump is also working, the need for hot water to the plate heat exchanger, used to heat tap water. 3, the boiler in order to achieve the anti-freeze, anti-jamming design needs, the need to lower the temperature below 5 ℃, or every 24 hours automatically run the circulating pump (and fans, gas valves and other components) about 5 minutes, or heating Water temperature rose to about 30 ℃. If the boiler downtime, the circulating pump is still running, then the failure, the need for after-sales maintenance.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords