Floor Heating Mat for Floor Heating System

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
2500 m²
Supply Capability:
3000000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Description of Product:

Floor Heating Mat for Floor Heating System


Specificaiton:

Floor  Heating Mat for Floor Heating  System


Photos:

Floor  Heating Mat for Floor Heating  System


FAQ:

① why from okorder?

Okorder is a qualified supplier of all kinds of building matierials in China. All products have been showed in Okorder website are under well controlled by okorder QC team.

All products had been produced under a clear quality standard and the quality is consistence among the shipments.

Okorder has already setted up more than 20 warehouses in different markets to show the products. You are convenient to know the products from your local place and it will help you to make decision easyly.  

②How to guarantee the quality of the products?

We have established a perfect quality management system,as for raw material and semi parts all are under strict quality test and we have a IQC system to control the purchases.

QC on site is very strict and all steps of process are measured per drawings. Before delivery, we set a OQC system to make sure each piece meet the standard of order.from design to delivery, 

③How long can we receive the product after purchase?

Lead time depending on order quanity, The normal order can be deliveried with 3 weeks.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Which man knows the construction of temporary heating program!
I do not know what site you do. If it is a tunnel, we use a thermostat
Q:The use of boiler should pay attention to what matters - safe use of boiler safety precautions
The use of boiler should pay attention to what matters - safe use of boiler safety precautions...
Q:Can home heating heat sinks be placed under the TV?
Can not, the following hot air will bring up the dust, look at the warmer above the walls are more dirty to know
Q:Home to use to warm, but want to use Finney's cooling water heater, do not know how to combine?
To warm the general use of fireplaces, water heaters for life hot water, does not affect. If you want the two sets, it involves the system integration, and need to see your system and want to achieve the function to match the controller and control valve, and for the HVAC professional is not a complex State sleep pumpkin mixed, but do not understand or very hard....
Q:One hundred and seventy square meters of house electric heating to use much of the furnace?
One hundred and seventy square meters of house electric heating to use much of the furnace?...
Q:Carbon crystal wall warm how good carbon crystal wall warm advantages and disadvantages
Carbon crystal wall warm how good carbon crystal wall warm advantages and disadvantages
Q:Casing head test pressure process
Test pressure 1. Test pressure single test pressure and system test pressure, single test pressure: after the completion of the trunk pipe or hidden parts of the pipeline installation is completed according to the design and specification requirements for water pressure test. System test pressure: heating system installed according to the design and specification requirements for system water pressure test. 2. Heating, air conditioning system test procedures: a first check the entire system of all control valves are open, the system should be separated from the outer pipe network, open the gas tank release valve. B will be the water main pipe, test pressure pump and other temporary pressure test pipe connected to the main water supply pipe, and irrigation to the system, to be filled with water system and cutting ingot Cui melon Chaozhao sleep bile duct system After the discharge of the air, the release of the valve out of the water so far), close the release valve; c operation test pump to boost, boost the process should pay attention to check management, fittings and accessories are leaked, such as seepage Leakage should stop the pressure to suppress, and after the buck to repair, change pad, tighten and so on. D system without leakage, the pressure and boost to the test pressure, stop the pump check, and observe the pressure gauge, requiring 10 minutes pressure drop of not more than 0.02Mpa, that is qualified.
Q:Home coal-fired heating stove and electric heating furnace which is good
Coal, cheap to save money. Electricity, clean and easy to control, expensive
Q:To warm the decoration of the pipe what requirements Mody, the market are their own good how to distinguish it?
To warm the generation of 3 generations on behalf of the generation of four generations is nothing but the destruction of the anti-slander, Packaging look for the packaging, the commonly used is PEX-A pipe quality performance are relatively stable, affordable, warm preferred pipe
Q:Home heating stove, how about? Is not very costly, which brand is better.
Okay yes, all in use. Fee is a certain charge. Brand? Are the same principle. With Watson!

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range