• Three Layer Engineering  Flooring For Flooring Heating System 1
  • Three Layer Engineering  Flooring For Flooring Heating System 2
  • Three Layer Engineering  Flooring For Flooring Heating System 3
  • Three Layer Engineering  Flooring For Flooring Heating System 4
Three Layer Engineering  Flooring For Flooring Heating

Three Layer Engineering Flooring For Flooring Heating

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1500 m²
Supply Capability:
100000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Description of product:

Three Layer Engineering  Flooring For Flooring Heating


Specification:

European/Russian oak engineered flooring 

Antique Style 

Saw cut veneer  

old style oak flooring

Three Layer Engineering  Flooring For Flooring Heating


Features:

(1) Beautiful looking;

(2) Fashionable, popularly in the world market;

(3) Easy to install and maintain;

(4) Environment-friendly


Photos:

Three Layer Engineering  Flooring For Flooring Heating


FAQ:

① why from okorder?

Okorder is a qualified supplier of all kinds of building matierials in China. All products have been showed in Okorder website are under well controlled by okorder QC team.

All products had been produced under a clear quality standard and the quality is consistence among the shipments.

Okorder has already setted up more than 20 warehouses in different markets to show the products. You are convenient to know the products from your local place and it will help you to make decision easyly.  

②How to guarantee the quality of the products?

We have established a perfect quality management system,as for raw material and semi parts all are under strict quality test and we have a IQC system to control the purchases.

QC on site is very strict and all steps of process are measured per drawings. Before delivery, we set a OQC system to make sure each piece meet the standard of order.from design to delivery, 

③How long can we receive the product after purchase?

Lead time depending on order quanity, The normal order can be deliveried with 3 weeks.



Q:To warm or water pipe leakage from the time of the warranty period
Hot work
Q:Selection of electric heating stove
Selection of electric heating stove...
Q:1200 square meters of villas need much electric heating stove
Have you considered heating it?
Q:The water in the heating furnace is often good
To see where the water quality, water alkali is not easy to change the water, the total water, water jacket furnace will scale, the flow is not smooth, natural heating effect is not good, coal (fuel). Look at the water is not high alkali method is very simple, look at their own home or someone else's home, aluminum water bottle, the scale of the number of more than easy to change the water, if it is factory, on the point of water treatment equipment, home In the water salt, I do not know what kind of heating furnace, if it is the soil of the tube of the circle, nothing to add, and winter with hot water no need to add things.
Q:To warm the winter can not live without water can be frozen to warm it?
Too cold, if the indoor temperature below 5 ℃ will crack. If you do not need to do some maintenance. Maintenance methods: 1, the winter should not pay attention to heating, watertight parts should be prevented from cracking and heating pipe in the water clogging the pipeline. 2, not to be activated when the watertight parts to prevent cracking, the system is not installed after the winter that year, such as indoor temperature below 5 ℃, the system should be all the air with air compressor blowing, to prevent the system by freezing. Winter should not be enabled when the geothermal heating system should pay attention to protection, to prevent the water diversion components or heating pipe in the water icing.
Q:What skills?
Electric boiler energy consumption is the highest, there is no way to reduce the....
Q:Do not smoke in winter, do not smoke, the tube will be frozen it
There is no way, because the neighbors heating even if you do not have no problem, if it is a cottage or single-family villa to die, cottage or single-family villa facade, directly facing the surrounding air, heat loss is particularly large, the wind Cold coefficient is also large. Such as the tiger ridge bogey Fan Huan song but attack the special encounter weather, may be frozen, it is best to let go of the water, just in case.
Q:To warm the heating furnace electricity and coal to buy more warm?
To warm the heating furnace electricity and coal to buy more warm?...
Q:On the bathroom water seepage problem, the water seepage parts of the wall, the bathroom inside the angle valve, the water into the sea Feng suppression of the economic power of the tibu ax hugs are not, in the end where the water, for explanation, is the following tiles below the reverse water? More
Okay, I'll answer your question! First: whether the home to install warm or radiator, pressure test pressure to see if the pressure. If the pressure does not prove that they are leaking. second. Water pipe pressure. The same reason; third, check the bathroom waterproof is safe. Whether the seepage point; Fourth, check whether the toilet floor, anti-water and other conditions. This can be roughly to determine which part of the water leakage. It is possible, but the odds are not too big. I hope you are not the same layer of drainage ... ... answer into the sea Feng suppression of the economic power of the tide ax hug finished. But really hands when it will be a little trouble. Concealed works, do not care not. And then decorate the house as far as possible to lead the pro!
Q:Seeking the whole process of the head test pressure, text description, detailed point,
Test pressure 1. Test pressure single test pressure and system test pressure, single test pressure: after the completion of the trunk pipe or hidden parts of the pipeline installation is completed according to the design and specification requirements for water pressure test. System test pressure: heating system installed according to the design and specification requirements for system water pressure test. 2. Heating, air conditioning system test procedures: a first check the entire system of all control valves are open, the system should be separated from the outer pipe network, open the gas tank release valve. B will be the water main pipe, test pressure pump and other temporary pressure test pipe connected to the main water supply pipe, and irrigation to the system, to be filled with water system and cutting ingot Cui melon Chaozhao sleep bile duct system After the discharge of the air, the release of the valve out of the water so far), close the release valve; c operation test pump to boost, boost the process should pay attention to check management, fittings and accessories are leaked, such as seepage Leakage should stop the pressure to suppress, and after the buck to repair, change pad, tighten and so on. D system without leakage, the pressure and boost to the test pressure, stop the pump check, and observe the pressure gauge, requiring 10 minutes pressure drop of not more than 0.02Mpa, that is qualified.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords