Three Layer Engineering Flooring For Flooring Heating

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1500 m²
Supply Capability:
100000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Description of product:

Three Layer Engineering  Flooring For Flooring Heating


Specification:

European/Russian oak engineered flooring 

Antique Style 

Saw cut veneer  

old style oak flooring

Three Layer Engineering  Flooring For Flooring Heating


Features:

(1) Beautiful looking;

(2) Fashionable, popularly in the world market;

(3) Easy to install and maintain;

(4) Environment-friendly


Photos:

Three Layer Engineering  Flooring For Flooring Heating


FAQ:

① why from okorder?

Okorder is a qualified supplier of all kinds of building matierials in China. All products have been showed in Okorder website are under well controlled by okorder QC team.

All products had been produced under a clear quality standard and the quality is consistence among the shipments.

Okorder has already setted up more than 20 warehouses in different markets to show the products. You are convenient to know the products from your local place and it will help you to make decision easyly.  

②How to guarantee the quality of the products?

We have established a perfect quality management system,as for raw material and semi parts all are under strict quality test and we have a IQC system to control the purchases.

QC on site is very strict and all steps of process are measured per drawings. Before delivery, we set a OQC system to make sure each piece meet the standard of order.from design to delivery, 

③How long can we receive the product after purchase?

Lead time depending on order quanity, The normal order can be deliveried with 3 weeks.



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to solve the heat pipe plug?
Plumbing heat pipe after 2-3 years, the tube wall will produce a lot of accumulated dirt, resulting in inadequate water flow, heat is not enough, heating effect caused a great impact, this time you need to use the warm pipe cleaning equipment to solve the warm pipe Blocking the problem, to warm the pipe dredge commonly used tool is to warm the pipeline dredge machine. In order to clean the pipe, it is necessary to use the correct way to clean, otherwise it will cause unnecessary results.
Q:Where can the warm electric boilers
You might as well press the power to warm Nexans electric heating is now the best
Q:Principle of pulsed geothermal cleaning machine
come on, come on, come on...
Q:20 kilowatts of electric boilers for large area of heating
1000 kW = 1 MW, then 20 kilowatts equivalent to 0.02 megawatts 1 MW of heating area can be an average of 5000 square meters 20 kilowatts can be heated area is about 0.02 * 5000 = 100 square meters 20 kilowatts of electric boilers can be 100 square meters of area heating
Q:What is the geothermal decoration process?
General geothermal installation of the construction steps: the first step to heat the first pavement to clean up the ground, pay attention to the corner clean up, to ensure that enough to allow enough expansion joints. The second step in the ground layer of plastic sheeting to isolate the moisture, let the plastic cloth in the four corners were higher than the ground 10cm. The third step to lay the mats. Note that to leave the expansion joints, the interface at least overlap 5cm, and must be sealed with a good tape. Use skirting boards that are thicker than ordinary floors and need to be built independently. After 24 hours of installation, the floor can be heated. In order to facilitate the heat, the cushion material should not be too thick. Common sense: to use geothermal floor special glue; can not shop pads; can not play keel, because this gap will leave the air, air thermal conductivity is low, is not conducive to heat transfer. Floor and floor between the mat can not use ordinary foam mats, be sure to use geothermal paper mats, because this mat heat conduction, no deformation. Ordinary foam mat heat slowly, long-term high temperature conditions, easy to produce harmful gases, endangering the health of users. Whether it is water heat radiation heating or cable heating heating system touch usurped Du Gu Sen Sen single system, do not live in the field on the ground furnace, electric furnace, etc., because the surface temperature is too high, then the ground under the aluminum-plastic composite pipe May melt. Geothermal flooring Due to the specificity of its function and the complexity of geothermal system, compared with ordinary flooring, geothermal floor maintenance and maintenance has its own unique, in the heating and moisturizing to pay special attention.
Q:How to use the Beretta boiler
Any boiler before starting the machine to pay the water to see if the water pressure gauge pointer is between 1 - 1.5bar. If the water pressure in the above range, open the gas pipe valve, power on, set the machine in the winter position, set the heating temperature, usually the upper limit of the floor heating temperature can be set to 55- -60 degrees Celsius, radiator heating up to 75-85 degrees Celsius (if the radiator is not anti-hot protection, it is best to set the temperature a little lower). After normal ignition do not have to ignore it. Bath: see the water pressure gauge pressure is normal, open the gas valve, power on, set the machine in the summer position (if it is winter, that is set in the winter position), the hot water temperature is set at 42-45 degrees Celsius Between, open the hot water head, until the water temperature is appropriate and stable after you can start bathing. Antifreeze: water pressure gauge pressure is normal, the machine power plug (do not boot), the gas path open (must ensure that the gas source) can be. The above operation applies to Faroe, Haas, Ariston, Bosch, Squirrel, Beretta and other brands of boiler
Q:Which brand is good to warm?
Hermanni, Germany imported.
Q:Is the carbon crystal warmer than the other? Where is it?
Carbon crystal to warm the advantages of: 1. durable and reliable carbon crystal to warm all underground buried parts can guarantee more than 50 years of service life. Carbon crystal heating plate can guarantee 100,000 hours of continuous work without trouble. 2. Heating efficiency of high-carbon crystal tiger ridge Hong Kong Fan Fan huan song but attack the warm heating plate "electric --- hot" conversion efficiency is extremely high, by the national professional testing, "electricity --- hot" conversion rate to More than 99%. 3. Heating speed Fast carbon crystal to warm the board of the excellent surface heating characteristics, so that the system work, to maximize the entire ground plane at the same time, synchronous heating. Is the fastest heating rate to warm the system. 4. Construction of a simple carbon crystal to warm the minimum to meet customer "one square meter" of heating requirements. 100m2 to warm the installation of construction, a group of workers (2) a day and can be laid to install the construction is completed. 5. Health and environmental protection situation, heating up quickly, fever fast. Power 30 minutes to heat. Carbon crystal heating plate directly on the indoor radiation heat, the temperature rise faster than the traditional plumbing and heating cable more than 5 times faster.
Q:What kind of pipe is better to use, which is more used?
Now do warm is basically more PEX tube...
Q:Owners in the decoration before the obligation to suppress the warm
I was in October 2009 to get the key to the house, small property, but no evidence, on the 3rd floor. At that time the house has been built for two years, when we are a collective decoration. I was renovated in December 2009, was not to warm to suppress, to warm the project to do, at the end of this year when the second floor of the notice received, said his roof leakage, after investigation, confirmed that my family To warm the emergence of a problem, contact the developer, the beginning of the arc 粻 post to save the cheat brother wedge workers did not come over, our property is composed of the village committee, and now I have been paved to the ground, and carpentry has done, Ground to warm, the village committee said to pay part of the money, but not enough of my decoration loss, how should I do? Attached: I am not looking for the decoration company installed, all the renovation projects are looking for the relationship, then the decoration process, there is no damage to the warm 1. I did not suppress the decoration before the warm, I was in the decoration before the obligation to pressure to warm The 2. At that time to do the closure of the test when the second floor has been unable to contact, the current floor to warm this cost and my decoration loss, who should bear? Do I have any responsibility? Who is more responsible? 3. At present, the cost of compensation for the village committee, even the normal pavement money do not come down, how can I do? 4. If the lawsuit, I was the one which side? More...

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range