air vent diffusers for air conditioning use CNBM supplying
- Loading Port:
- Ningbo
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 500 pc
- Supply Capability:
- 999999 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specification of Air Diffuser
Supplying Air Diffusers
-Frame Thickness: 1.0mm /0.8mm
-Any Size be customed
-Powder Coated RAL 9010/9016
Usage of Air Diffuser
The grille is suitable for ceilling sidewall, soffit or cill mounting and may be used for supply or extract applications.
Typical installations include offices, shops, hotels and most commercial or industrial buildings.
Available as standard in white polyester powder coat finish.
Other polyester powder coat finishes are also available as an option.
FAQ of Air Diffuser:
1, What's size do u have for round type diffuser?
A: We have face size from 150mm to 550mm,neck size from 250mm to 400mm聽
2, Do u still have other types ?
A: Yes, we have round diffuser/ rectangle diffuser/ linear grilles/ baseboard diffusers,etc
3, What's the most early delivery time?
A: Within 25 days for each 40'fcl
- Q:Selection of electric heating stove
- Selection of electric heating stove...
- Q:Geothermal coil spacing is too hot not how to do
- Home improvement 200. works 350...
- Q:110 level two-story to warm the boiler heating and living hot water with much model
- The standard fireplace on it
- Q:Heat pump air conditioning principle:
- When the air conditioner is in the cooling operation, the low-temperature and low-pressure refrigerant gas is sucked by the compressor and pressurized into a high-temperature and high-pressure refrigerant gas. The high-temperature and high-pressure refrigerant gas exothermic (condensed by the condenser) in the outdoor heat exchanger Into the medium temperature and pressure of the liquid (heat through the outdoor air to take away), the temperature and pressure of the liquid and then through the throttling components throttle down after the low temperature and low pressure into the liquid, low temperature and low pressure liquid refrigerant in the indoor heat exchanger heat (The indoor air is cooled and cooled by the surface of the heat exchanger to achieve the purpose of lowering the indoor temperature), and the low-temperature and low-pressure refrigerant gas is sucked by the compressor and circulated as described above. Air conditioning in the heating operation, through the two four-way electromagnetic valve, reverse Carnot cycle, to achieve heating.
- Q:What is the basic task of heating engineering? The heating system is composed of some parts
- The basic task of heating engineering is to meet the needs of the heat load components: heat, heat, hot users
- Q:My home is the developer himself installed boiler heating, the developer to the unified pavement to warm, my family is the first year of the new building, home water and backwater are not hot! I am five units from the boiler room farthest unit, developers say 15 floor is the following from the bottom of the water, 16-30 floor is from the water down, each floor a total of 6 households, I live on the 5th, 1 , 2,3,6 are no problem, only our home and No. 4 problem, we and 6 is a pipeline, 6 home 22 degrees, water meter room is the main road is warm, into the home of the 6th pipe is Hot, and 4,5 into the home of the pipeline is cool, but also do not feel the sound of water? The property fiddle for a week and there is no good bowel flat section of the strong light hold the dog platinum, how is it? More
- Agree with the views of the S-Jun always, first check the pipeline, the valve is smooth, if no problem to put a breath. To warm the heat in addition to blocking the gas is blocked, no other problems.
- Q:My house can not live in the winter Zhangjiakou mouth in the north will not be frozen? I installed the warmth. More
- If you do not need to carry out some maintenance in winter, maintenance methods: a. Winter should not be careful when heating, should prevent the water diversion component cracking and water pipe in the heating pipe clogging the pipeline; b. Do not be activated to prevent the water separator parts Frozen in the system after the winter is not enabled, such as indoor temperature below 5 ℃, should be, the system of water with air compressor all blown to prevent the system by freezing; winter does not enable geothermal heating system should pay attention to protection, To prevent the water separator parts from freezing or heating the water in the pipe.
- Q:We have two or three years useless to warm, the annual temperature is about 23 degrees. This year is still not hunger view spy grab the silicon oblique helmion want to, do not know the ground heating facilities have no harm, need to pay attention to what? Question added: water to warm, thank you! More
- First of all do not know what type of floor you are using to warm, plumbing or warm, if it is plumbing, then you need to check your pipe, water separator, boiler have to do it again because of prolonged stagnation, boiler components And the valve carbon because of the accumulation of dust is too easy to produce gas holes blocked the problem, for a long time to use the need for professional after-sales staff to carry out cleaning work. Plumbing water separator is also one of the key components, if you stop before the use of the pipeline is not completely ruled out the circulating water, then the water calcium, chlorine and other molecules will be attached to the metal surface, for components and pipes are back Produce corrosion. It is recommended that you do a detailed check before reusing it. As for the warm pipeline recommended to suppress the test and clean up. If you use the electric floor to warm, the problem of water to meet the heat will not occur, but can be carried out one by one room to open the test. Open for about an hour or so, you can detect the normal heating system or not. The wall thermostat can be tested by adjusting the temperature function. There is no complete harm. If you are a northern city, then it is important to note that the effect of low temperature on the circulating water in the tube. If you do not need to open every year then it is recommended to do a year to open the test and water action.
- Q:Home to install 400 atmospheric boiler on the first floor, to the second floor for the warm, the water tank in the boiler next to the circulation pump is 500 watts head 8 meters, equipped with a check valve, Equipment into the export are installed automatic valve, but the temperature of a 40 degrees there is gas parked in the pump, the hot water on the up, please enlighten me master
- With hot water pump, cold water pump not.
- Q:My home renovation of the old house, ready to shop warm, plan to sand layer destroyed, about 3cm, but when playing, found that some parts of the house is pouring. Sand ash layer can be removed 3cm, pouring place can be removed 1cm, to the pouring layer, but if the taste of the system, but if the house is relatively short. Is it a good idea? Hope that experienced foreman to provide valuable experience. More
- You simply do not have a solution, who would dare to pour the body? 2 cm high 2 cm high bar, do not do the top of the ceiling with a color mirror with a color bar to do the shape, allowing the shelves to look like a trap,
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
air vent diffusers for air conditioning use CNBM supplying
- Loading Port:
- Ningbo
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 500 pc
- Supply Capability:
- 999999 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords