• Square air Vent Diffusers for Air Conditioning System 1
  • Square air Vent Diffusers for Air Conditioning System 2
  • Square air Vent Diffusers for Air Conditioning System 3
  • Square air Vent Diffusers for Air Conditioning System 4
  • Square air Vent Diffusers for Air Conditioning System 5
  • Square air Vent Diffusers for Air Conditioning System 6
Square air Vent Diffusers for Air Conditioning

Square air Vent Diffusers for Air Conditioning

Ref Price:
get latest price
Loading Port:
Ningbo
Payment Terms:
TT OR LC
Min Order Qty:
500 pc
Supply Capability:
999999 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specification of Air Diffuser

Supplying Air Diffusers 

-Frame Thickness: 1.0mm /0.8mm
-Any Size be customed 
-Powder Coated RAL 9010/9016

  

Usage of Air Diffuser

The grille is suitable for ceilling  sidewall, soffit or cill mounting and may be used for supply or extract applications. 

Typical installations include offices, shops, hotels and most commercial or industrial buildings.

Available as standard in white polyester powder coat finish. 

Other polyester powder  coat finishes are also available as an option.


Products show

Square air Vent Diffusers for Air Conditioning

Square air Vent Diffusers for Air Conditioning

Square air Vent Diffusers for Air Conditioning


Production line

Square air Vent Diffusers for Air Conditioning

 

FAQ of Air Diffuser:

 

1, What's size do u have for round type diffuser?

A: We have face size from 150mm to 550mm,neck size from 250mm to 400mm

 

2, Do u still have other types ?

A: Yes, we have round diffuser/ rectangle diffuser/ linear grilles/ baseboard diffusers,etc

 

3, What's the most early delivery time?

A: Within 25 days for each 40'fcl

 

Q:Home to use to warm, but want to use Finney's cooling water heater, do not know how to combine?
Installation to warm, I suggest that the installation of electricity to warm, late fees, and so all aspects are much better, you can on the "China Electric to warm network" to understand Kazakhstan, I think the quality of imports or good.
Q:Rooftop electric film from the heating how?
The heat is running up
Q:Liquefied gas can be installed to warm it? And natural gas to install what is the difference between the safety factor, the amount of engineering and other aspects of contrast, liquefied gas will not trouble?
Liquefied gas certainly more expensive than the use of natural gas and the degree of damage to the stove than the natural gas is also high for the carved stalk rush moxia smoked smoked more construction is relatively complex, if not natural gas is not as good as electricity + hot
Q:Geothermal coil spacing is too hot not how to do
The spacing is too large to increase the water supply temperature (& lt; 60 degrees), or to accelerate the hot water cycle
Q:Dual-use boiler is also only one burner, then the life of hot water and heating hot water is how to burn at the same time? More
Dual-use fireplace life hot water, heating function is not working, and always life is hot and dry tripod scraping scraping calcium state water abalone priority, no life hot water demand and then switch to heating, casing machine and plate change Machine life hot water function is different...
Q:My home is the developer himself installed boiler heating, the developer to the unified pavement to warm, my family is the first year of the new building, home water and backwater are not hot! I am five units from the boiler room farthest unit, developers say 15 floor is the following from the bottom of the water, 16-30 floor is from the water down, each floor a total of 6 households, I live on the 5th, 1 , 2,3,6 are no problem, only our home and No. 4 problem, we and 6 is a pipeline, 6 home 22 degrees, water meter room is the main road is warm, into the home of the 6th pipe is Hot, and 4,5 into the home of the pipeline is cool, but also do not feel the sound of water? The property fiddle for a week and there is no good bowel flat section of the strong light hold the dog platinum, how is it? More
Agree with the views of the S-Jun always, first check the pipeline, the valve is smooth, if no problem to put a breath. To warm the heat in addition to blocking the gas is blocked, no other problems.
Q:What are the heating components of the heating system design?
In the design of the design, the design of the heating system is based on the basic heat consumption and the additional (corrected) heat dissipation of the envelope. The basic heat consumption refers to the sum of the stable heat transfer from the room to the outside through the various parts of the room envelope (doors, windows, walls, floors, roofs, etc.) under design conditions. Additional (modified) heat consumption refers to the heat transfer of the envelope structure changes the basic heat consumption to correct the heat consumption. Additional (corrected) calorie consumption includes the amount of heat applied to the correction, wind addition, height addition and external door addition.
Q:Can the warm pipe be used as a drinking water pipe? Question added: PE-RT tube heat-resistant polyethylene pipe can be used as a drinking water pipe? ?????????More
The general water pipe is PPR, to warm the commonly used PB, PEX-C, and other places to have an oxygen barrier layer, each loop is not more than 120 meters ... can be used, but the tube field slump dry limbs The wall thickness is different, the pipe is also different
Q:Seeking the whole process of the head test pressure, text description, detailed point,
Test pressure 1. Test pressure single test pressure and system test pressure, single test pressure: after the completion of the trunk pipe or hidden parts of the pipeline installation is completed according to the design and specification requirements for water pressure test. System test pressure: heating system installed according to the design and specification requirements for system water pressure test. 2. Heating, air conditioning system test procedures: a first check the entire system of all control valves are open, the system should be separated from the outer pipe network, open the gas tank release valve. B will be the water main pipe, test pressure pump and other temporary pressure test pipe connected to the main water supply pipe, and irrigation to the system, to be filled with water system and cutting ingot Cui melon Chaozhao sleep bile duct system After the discharge of the air, the release of the valve out of the water so far), close the release valve; c operation test pump to boost, boost the process should pay attention to check management, fittings and accessories are leaked, such as seepage Leakage should stop the pressure to suppress, and after the buck to repair, change pad, tighten and so on. D system without leakage, the pressure and boost to the test pressure, stop the pump check, and observe the pressure gauge, requiring 10 minutes pressure drop of not more than 0.02Mpa, that is qualified.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords