Dual Cores Heating Cable for Floor Heating System

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
5000 m
Supply Capability:
30000000 m/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Description of Product:

ANLT Dual cores insulated floor heating cable 
1.Double Cores-applied in difficult situation 
2.Silicon Rubber Insulated-Safe

 Specification:

Dual Cores  Heating Cable for Floor Heating  System


Features

Energy saving, self regulating, automatically vary its power output respond to pipe or vessel ambient temperature changes.l Cut to any length as you want (up to max circuit length), easy to install and pave along with pipe.

Low install cost than another heat tracing, less maintenance charges and less downtime.

No overheat or burnout even when overlapped.

Several output powers

Suitable for use in non-hazardous, hazardous and corrosive environment.

Dual Cores  Heating Cable for Floor Heating  System


FAQ:

① why from okorder?

Okorder is a qualified supplier of all kinds of building matierials in China. All products have been showed in Okorder website are under well controlled by okorder QC team.

All products had been produced under a clear quality standard and the quality is consistence among the shipments.

Okorder has already setted up more than 20 warehouses in different markets to show the products. You are convenient to know the products from your local place and it will help you to make decision easyly.  

②How to guarantee the quality of the products?

We have established a perfect quality management system,as for raw material and semi parts all are under strict quality test and we have a IQC system to control the purchases.

QC on site is very strict and all steps of process are measured per drawings. Before delivery, we set a OQC system to make sure each piece meet the standard of order.from design to delivery, 

③How long can we receive the product after purchase?

Lead time depending on order quanity, The normal order can be deliveried with 3 weeks.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Do you want to turn off the water return switch when the geothermal pipe is exhausted?
Geothermal (floor warm) water separator: We are exposed to the only equipment, but also we need to operate the exhaust equipment. Divided into the supply (into) water pipes and back (out) water pipes, in general, the top of the water supply pipe, the bottom is the return pipe, each have a valve, the ball valve: the horizontal direction is open, vertical helium float Feng Tong Feng is off. Gate valve: screw clockwise screw is off, counterclockwise twist is open. Another tool: a soft leather tube, the size and exhaust valve port similar to the elastic, can be tight in the exhaust valve port, to prevent the discharge when the pop, affecting health. A basin. 1. It is best to determine the exhaust in the normal heating 2. The best one by one system exhaust, in the geothermal first run process, because the pipeline pressure and water resistance is easy to produce air plug, resulting in water supply is not recycled, the temperature is not equal , Should be carried out by road exhaust. The method is: turn off the heating of the total return valve and the loop control valve, (the total return valve in front of the water separator, the pipe below the tube, the low temperature of the pipe is the return pipe.) First open the water separator A control valve, and then open the drain on the drain valve on the exhaust valve exhaust, drain the air and then close the valve, while opening the next valve. And so on, each way the air is drained and then all the valves open, the system is running. 3. The number of exhaust and heating are directly related to the length of time, such as running water and heating time, just started heating and fast heating because of heating time is short, circulating pump and heat transfer station also has time to stop, easily lead to gas block, so everyone Should be more exhaust, generally completely after a gas can be. In the later exhaust do not have to close the valve, you can directly discharge a small amount of air
Q:You are registered or heating works basically useless...
Home wall boiler attention to what the use of boiler concerns...
Q:Principle of pulsed geothermal cleaning machine
Practice has proved that the method of pulse geothermal cleaning is far from the effect of good projectile, the so-called pulse is a pulse device, the name is the water to form a spiral to play out, and then rotate in the pipeline flow to the flushing pipe wall The role of the general situation are part of the water block part of the blockage is serious, the mouth can not get into the water how will rotate in the wall? I have been engaged in geothermal cleaning has five or six years, the pulse of the basic method is a hammer , The effect is very poor, and always call me this is not hot, obviously not hot, so less than a last resort I will not use the pulse, and only those who can not be demolished, or with the projectile. Since you have been demolished on a demolition in the end chanting, that thing is very simple, the cost of the burden of the child from the nuclear shop as you said it is one or two hundred dollars, only two solenoid valves, and a control of the intensity Small board, purely bluffing stuff
Q:Taurus to warm what is the characteristics of oxygen
1, oxygen tube only in the closed circulatory system in the role of the central heating is no use. 2, in addition to the design of a reasonable, construction science, but also use a reasonable pipeline system to prevent the penetration of oxygen Into the heating system of water, because oxygen is the root of corrosion. Oxygen tube, as the name suggests, is to prevent oxygen molecules through the plastic pipe layer, so as to avoid the rapid corrosion of metal parts in the equipment. This product was developed in recent years.
Q:What is the basic task of heating engineering?
The basic task of heating engineering is to meet the needs of the heat load components: heat, heat, hot users
Q:My home renovation of the old house, ready to floor warm, plan to sand layer destroyed, about 3cm
You simply do not have a solution, who would dare to pour the body? 2 cm high 2 cm high bar, do not do the top of the ceiling with a color mirror with a color bar to do the shape, allowing the shelves to look like a trap,
Q:To warm which brand the best
You want to good point, then I recommend you to import it
Q:Use the boiler is often used to adjust the minimum number of degrees
Water temperature is 60 degrees minimum
Q:To warm or water pipe leakage from the time of the warranty period
To warm or water pipe leakage from the time of the warranty period...
Q:Gas boiler hanging water valve bad, how to pay the furnace.
After the wall valve has been damaged, it is best to replace a model with the same parts, once and for all, to facilitate future use and maintenance. If you do not find the same parts, and the water valve is only damaged, and not leaking, and not to the tap water back, you can use y the following way to fill: 1, the heating system to remove the remaining pressure (through the exhaust valve ), And then open any pipe at a connection, connect a three-way, so that the ends of the tee connected with the original connection, more than one end of the connection of a pipe and a valve, the valve and tap water can be connected The 2, open the valve, open the water valve, tap water into the heating system, observe the pressure gauge, to 1.5bar when the valve closed, remove the water pipe. You can use the boiler. 3, if the tap water pressure is too low, less than the minimum value of the start of the boiler, single Dan Wei Pie Pie Shi paint ten ginger can be manually pressed pump connected just the valve, manual pressure to 1.5bar.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range