Woven Bamboo Flooring for Floor Heating System

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1200 m²
Supply Capability:
30000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Description of product:

Woven bamboo flooring for heating 


Specification:

1.carbonzied horizontal structure 

2regular knots texture 

3 F-type click lock 

4.A grade


Features:

1. horizontal carbonized structure

2.gloss lacquer finished

3.beauty,various color for choose

4.meet E1 grade

5.pass CE/ISO9001/ISO14001 certification

6.size:1000x126x17mm or 960x96x15mm

7. harder and stronger

8. this series bamboo flooring: high-temperature and pressure carbonized desugared,degreased and dehumidification, strong hardness with high density, fine tissues with high elasticity, anti-wear & spilt-rersisting, E1 grade quality Assurance and mothproof, mildew proof, healthy & environmental.


Photos:


Woven Bamboo Flooring  for Floor Heating System


FAQ:

① why from okorder?

Okorder is a qualified supplier of all kinds of building matierials in China. All products have been showed in Okorder website are under well controlled by okorder QC team.

All products had been produced under a clear quality standard and the quality is consistence among the shipments.

Okorder has already setted up more than 20 warehouses in different markets to show the products. You are convenient to know the products from your local place and it will help you to make decision easyly.  

②How to guarantee the quality of the products?

We have established a perfect quality management system,as for raw material and semi parts all are under strict quality test and we have a IQC system to control the purchases.

QC on site is very strict and all steps of process are measured per drawings. Before delivery, we set a OQC system to make sure each piece meet the standard of order.from design to delivery, 

③How long can we receive the product after purchase?

Lead time depending on order quanity, The normal order can be deliveried with 3 weeks.




Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:One hundred and seventy square meters of house electric heating to use much of the furnace?
One hundred and seventy square meters of house electric heating to use much of the furnace?...
Q:Home gas boiler why the circulating pump is always non-stop turn?
Gas boiler water pump will automatically start and stop according to the water temperature, under normal circumstances during the water pump is kept non-stop. Because the pump operation can make the system temperature uniformity, the temperature inside the furnace can reflect the system temperature. But not all brands of fireplaces are so. So the pump motor is not working properly.
Q:To warm the water back to the water is not hot
The gas valve to get off the gas to see if the valve is open
Q:To warm the winter do not have to be frozen
Of course not. If that is not the case of the market? But now more and more people in use. So at night you can feel at ease! The The
Q:What is the service life of the air source heat pump water heating system?
Air source heat pump water to warm the general service life of up to 50 years or so, but if in daily life without reasonable use, will certainly cause water to warm the service life is shortened, so we use water to warm when appropriate to use, and do not forget The water to warm the corresponding maintenance. Carry out the necessary periodic inspection of water to warm the system mainly by the insulation facilities, sub-catchment, geothermal system, pipeline valves, backfill concrete composition. Among them, the sub-catchment has shunt, collecting, constant pressure, exhaust and so on. Therefore, the sub-catchment installed directly affects the quality of the project and the quality of heating. Scale, material, installation and other factors will affect the role of the water separator, if the above factors are not well resolved, there will be leakage, the pipeline longitudinal cracking, valve off and so on. These phenomena often appear in the upper and lower bar of the water divider interface, the angle valve and the main bar connection, the angle valve handle, and the exhaust valve at the top and the root. This phenomenon will generally occur in the water to warm the system used a year or two later. Therefore, the water to warm the system in the use of a year or two later, the user in their daily lives should pay attention to regularly check their own water to warm the system to prevent such phenomena in time to produce. Check the method can follow the "one look, two screw, three pull" principle
Q:What are the structural materials for the heating of household boilers?
Insulated material of water and electricity separation of ceramic electric heating pipe
Q:1200 square meters of villas need much electric heating stove
Have you considered heating it?
Q:Collective heating, and their own to change the use of heating valve installed
Install a mixed water center to prevent the temperature is too high and affect the life of the warm pipe to warm the temperature is generally maintained at about 60 ℃
Q:What is the geothermal decoration process?
General geothermal installation of the construction steps: the first step to heat the first pavement to clean up the ground, pay attention to the corner clean up, to ensure that enough to allow enough expansion joints. The second step in the ground layer of plastic sheeting to isolate the moisture, let the plastic cloth in the four corners were higher than the ground 10cm. The third step to lay the mats. Note that to leave the expansion joints, the interface at least overlap 5cm, and must be sealed with a good tape. Use skirting boards that are thicker than ordinary floors and need to be built independently. After 24 hours of installation, the floor can be heated. In order to facilitate the heat, the cushion material should not be too thick. Common sense: to use geothermal floor special glue; can not shop pads; can not play keel, because this gap will leave the air, air thermal conductivity is low, is not conducive to heat transfer. Floor and floor between the mat can not use ordinary foam mats, be sure to use geothermal paper mats, because this mat heat conduction, no deformation. Ordinary foam mat heat slowly, long-term high temperature conditions, easy to produce harmful gases, endangering the health of users. Whether it is water heat radiation heating or cable heating heating system touch usurped Du Gu Sen Sen single system, do not live in the field on the ground furnace, electric furnace, etc., because the surface temperature is too high, then the ground under the aluminum-plastic composite pipe May melt. Geothermal flooring Due to the specificity of its function and the complexity of geothermal system, compared with ordinary flooring, geothermal floor maintenance and maintenance has its own unique, in the heating and moisturizing to pay special attention.
Q:Rooftop electric film from the heating how?
The heat is running up

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range