Product Description:

Details

1. Lightning rod built in wind turbine body, safe in storm weather

2. No need city power, off grid,

3. Beautiful for the LED street lighting system and the residential block

4. No pollution, low carbon, green life

5. Direct drive, no mechanic friction

6. Start up at 1.0 m/s, cut in wind speed 2.5 m/s




Specification:

Maglev wind generator

TypeCXF200CXF300CXF600CXF1000CXF3000
Rated Power200W300W600W1000W3000W
Size(Height / Diameter)1035/1150mm1090/1240mm1320/1540mm2200/2400mm4200/4570mm
Turbine Weight22.5KG31KG49KG180KG715KG
Blades MaterialAluminum alloyAluminum alloyaluminum alloyaluminum alloyaluminum alloy
Blades Qty.33333

Start-up

wind speed

1m/s1.3m/s1.3m/s1.5m/s1.5m/s

Cut in

wind speed

2m/s3m/s3m/s5m/s, 3.5m/s3.5m/s
Rated Wind Speed13m/s12m/s13m/s13m/s13m/s
Cut out Wind Speed16m/s15m/s15m/s15m/s15m/s
Survival Wind Speed60m/s65m/s65m/s60m/s60m/s
Generator TypeAC,3 phasesAC,3 phasesAC,3 phasesAC,3 phasesAC,3 phases
Controller output voltageDC12VDC24V/12VDC24V/12V/48VDC48V/24VDC48/96V
Controller output current<12Amp<20Amp<30Amp<50Amp<130Amp
Controller braking system

3-Phase /short circuit protection/ NFB/

Manual break or automatic brake optional

Ambient Temperature-30~50 ℃-40~50 ℃-40~50 ℃-40~50 ℃

-40~50 ℃




Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Ask the expert about the design of the power system diagram, 6kV side of the electrical equipment how to supply
220380 through 6KV.4kvIf you need to use 6kV from the 6KV bus with the line (equipped with power distribution switch), without the 6KV transformer, your system diagram is not equipped with the outlet is wrong
Q:What equipment is needed in the national grid project
If the grid equipment. There is a device: power transformers, switches, knife gate, bus, GIS, HGIS, voltage transformers, current transformers, high resistance, lightning arrester, bare wire, line hardware, insulators, towers, power cables, etc.
Q:How to handle the qualification test, what kind of power equipment
(a) legal person qualification and perfect organization; (two) the registered capital and net assets of 60 million yuan; (three) the last 3 years to bear the following first items listed, third project and second sub items listed in any one project, and the project quality: above 1 thousand and 330 volts voltage substation 2 or 220 thousand volt substation 5; more than 2 thousand and 330 volt overhead lines 300 kilometers or 220 thousand volt overhead line of 500 kilometers; more than 3 thousand and 220 volt cable line 80 kilometers or 100 meters above the level crossing tower crossing project 1.
Q:Electric power equipment start-up and commissioning of the project there is a difference?
The start of the equipment is started in the single test.
Q:What are the necessary equipment for power line project?
It must have a climbing tool, such as irons, safety belts, safety helmet; and lifting equipment, such as cranes, hydraulic lift truck, pulley, winch, pole and so on; there must be bearing equipment, such as various tensioners, hand gourd, line cards, traction machine, tension machine;
Q:What is the redundancy of electrical equipment
Redundancy is a part of the system that is repeatedly configured. When the system is in trouble, the redundant components are involved in the work of the faulty components, thereby reducing the failure time of the system.
Q:What are the two devices in the power system
Your question is somewhat ambiguous, as I understand the following: the two equipment is a device for the work of the control, protection, monitoring and measurement equipment
Q:Pre checking and checking of goods in power system
That is one of the effective means to ensure the safe operation of electrical equipment. Over the years, the power sector and power equipment of large industrial and mining enterprises are basically in accordance with the rules of the preventive test of power equipment issued by former Ministry of electric power "(hereinafter referred to as the" Regulations ") requirements for testing, the timely detection and diagnosis equipment defects play an important role.
Q:What is the power system and the power grid 2 what is the rated voltage of electrical equipment
The electric power network is referred to as the "power grid", which refers to the connection between the bus from the booster station of the power plant to the bus of the substation.
Q:Electric power automation equipment
Power system relay protection, remote control, communication, information technology,

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range