VAWT 200W-3KW

Ref Price:
Loading Port:
Shekou
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
500 units / month set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Details

1. Lightning rod built in wind turbine body, safe in storm weather

2. No need city power, off grid,

3. Beautiful for the LED street lighting system and the residential block

4. No pollution, low carbon, green life

5. Direct drive, no mechanic friction

6. Start up at 1.0 m/s, cut in wind speed 2.5 m/s




Specification:

Maglev wind generator

TypeCXF200CXF300CXF600CXF1000CXF3000
Rated Power200W300W600W1000W3000W
Size(Height / Diameter)1035/1150mm1090/1240mm1320/1540mm2200/2400mm4200/4570mm
Turbine Weight22.5KG31KG49KG180KG715KG
Blades MaterialAluminum alloyAluminum alloyaluminum alloyaluminum alloyaluminum alloy
Blades Qty.33333

Start-up

wind speed

1m/s1.3m/s1.3m/s1.5m/s1.5m/s

Cut in

wind speed

2m/s3m/s3m/s5m/s, 3.5m/s3.5m/s
Rated Wind Speed13m/s12m/s13m/s13m/s13m/s
Cut out Wind Speed16m/s15m/s15m/s15m/s15m/s
Survival Wind Speed60m/s65m/s65m/s60m/s60m/s
Generator TypeAC,3 phasesAC,3 phasesAC,3 phasesAC,3 phasesAC,3 phases
Controller output voltageDC12VDC24V/12VDC24V/12V/48VDC48V/24VDC48/96V
Controller output current<12Amp<20Amp<30Amp<50Amp<130Amp
Controller braking system

3-Phase /short circuit protection/ NFB/

Manual break or automatic brake optional

Ambient Temperature-30~50 ℃-40~50 ℃-40~50 ℃-40~50 ℃

-40~50 ℃




Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Power equipment sales process, the customer asked the most questions thank you
6, some of the common causes of the failure of the equipment and processing needs to understand, it is possible that users will ask some of the problems they encounter oh;The last thing is the most important, in order to get the order: it depends on how to ensure that the interests of their clients, and this look at your company policy, the interests of the customer relationship and ensure equal importance! Basically so many questions, other topics. Absolute hand!
Q:Electric power equipment start-up and commissioning of the project there is a difference?
The start of the equipment is started in the single test.
Q:The concept of "remote message" in communication and power equipment
Remote signal to speak a little bit is the alarm signal, switch position signal to the control room
Q:What is the concentrator of the power set
Centralized meter reading. Power system is an important part of power automation system, and it is an intelligent system which develops rapidly in recent years. The system integrates data acquisition (JY-RTU6640), intelligent control and network communication, and realizes remote data exchange and real-time monitoring. Through the centralized meter reading for power users, improve the accuracy, reliability and safety of meter reading work; can realize the real-time calculation of line loss; to detect anomalies and the phenomenon of stealing electricity meter; effective control of electricity arrears behavior; reduce the cost of management, so as to improve the modern management level of power marketing.
Q:On the safety hazards of electric equipment safety
4 where the demolition, the power line protection zones of overweight, lifting, drilling, piling, scaffolding and other construction work, it shall be permitted by the power supply departments, take appropriate safety measures, and can work in the power supply department under the supervision of professional staff.5 prohibit the installation of electric power facilities within the range of 500 meters to carry out blasting operations, fireworks, etc..6 prohibit fishing in the power line protection zone, in case of personal electric shock accident.7 ban on power line protection zones, such as various types of debris piled hay straw, especially prohibit piling flammable and explosive materials.
Q:In the city emergency security system, what are the relevant power equipment
High / low voltage switchgear, power distribution cabinets, industrial ovens, constant temperature and humidity test box, ovens, air curtain machine (invisible door), inductive automatic door, air conditioning and industrial fans, NELL thyristor module, thyristor, single / three-phase bridge rectifier, fast recovery module
Q:Is the installation of railway communication, signal and power related to mechanical and electrical engineering
Communication signal power belongs to mechanical and electrical installation engineering. However, it is different from the mechanical and electrical installation of industrial equipment, especially the railway communication and signal system. The main differences are the following points: 1, mechanical and electrical installation is mainly refers to the installation of equipment, power, monomer debugging, linkage commissioning commissioning. Railway communication, signal, power, but there is a very strong system requirements, including the total network management system debugging, and other railway system of professional linkage debugging. For example, the signal CTCS system, track circuit and the coordination of the work system commissioning; and passenger cars, motor vehicles, truck station shunting system linkage debugging, etc.
Q:Insulation level of electrical equipment used in neutral point grounding system shall be
For example, 220kV transformer (YNYnd11) insulation level high voltage side is LI950AC395-LI400AC200, the front half part (head) of the lightning impulse voltage and power frequency withstand voltage were significantly higher than that of the second part (neutral side). According to the power frequency withstand voltage needs to achieve 1.6 times the rated voltage requirements, the first end of the line voltage is considered in accordance with 220kV, the neutral point according to the phase voltage (127kV) considerations. But there are some places are fully insulated, that is, according to the line voltage calculation.The triangle connection must be considered by the line voltage. Overall, C is definitely right.
Q:What is the GIS in power system
Popularly speaking, GIS is often we can see the switch station, also known as high-voltage distribution device.There are three types of high voltage power distribution equipment: the first is the conventional air distribution equipment, referred to as AIS. The bus bar is exposed directly to the air, and the breaker can be provided with a porcelain column or a tank type. This type is used in Gezhouba Dam power plant.
Q:What is the redundancy of electrical equipment
I/O card: to the server, mainly refers to the network card and hard disk control card redundancy. Network card redundancy is inserted in the server dual network card. The card was large and redundant technology medium on technology, now has been owned by the PC server. PC server such as Micron's NetFRAME9200 up to 4 network card redundancy, the 4 network card each bear the network traffic of 25%. COMPAQ all ProSignia/Proliant servers have fault tolerant redundant dual nic.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range