Maglev Vertical Axis Wind Turbine for Home Use 600W-24V/48V
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 50 set
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. Structure of Maglev Vertical Axis Wind Turbine for Home Use 600W-24V/48V
The CXF series of vertical axis maglev wind turbines undergoes a continuous improvement process, which incorporates exterior design, utility design, electrical engineering, dynamic engineering, power mechanics, aviation air engineering, wind tunnel testing, lightening protection, computer simulation techniques and other multiple specialities. Under the light theory of magnetic levitation technology, fan motor will be rotated by wind power without any mechanical friction. Since the generator has no lubricant and no gear, the Magleve wind turbine are high-performance power generation, smooth operation, which is a milestone for a new age of power technology.
2. Main Features of Maglev Vertical Axis Wind Turbine for Home Use 600W-24V/48V
* Ideal for both of residential and commercial applications as well as off grid and on grid power systems.
* The unit provides a durable, reliable, and fully customized hybrid solution to Telecoms Base Receiver Station (BTS), Charging Station by Solar and wind and also very suitable for power supply to home
* Intelligent control system with active protective functions
* automatically lower rotational speed during strong winds
3.Maglev Vertical Axis Wind Turbine for Home Use 600W-24V/48V Specifications:
tems | CXF600 |
Rated power | 600W |
Dimension (Height/Diameter) | Ø1540mm / 1320mm |
Weight | 50 kg |
Blade material | Aluminum Alloy |
Blade quantity | 7 (3 Darrieusand 4 Savonius) |
Swept area ㎡ | 0.30 |
Min starting wind speed | 1.3 m/s |
Cut-in wind speed | 3.5m/s |
Rated wind speed | 13m/s |
Cut-off wind speed | 15m/s |
Survival wind speed | 60m/s |
Generator type | AC,3Phases |
Controller Output Voltage | 24V/48V |
Controller Braking System | 3-phase short circuit by NFB brake |
Ambient Temperature | -40~50 ℃ |
Noise | Less than 40dB |
Annual Energy Production (@ 5 m/s wind speed ) | about 1500 kWh |
4. Maglev Vertical Axis Wind Turbine for Home Use 600W-24V/48V Images
5. FAQ
Why to choose vertical axis maglev wind turbine ?
Re: You can find the answer in the following table
Comparison between HAWT AND MVAWT | ||
Item | Horizontal axis wind turbine (HAWT) | Maglev vertical axis wind turbine (MVAWT) |
Starting wind speed | High(≥3m/s) | Low(1m/s) |
Wind conditions required | Require stable wind direction | Any wind direction |
Encountered turbulence | Efficiency is reduce | Efficiency is not affected |
Power stability | Changing by wind direction | Without any wind effect |
Noise | Large (More than 45dB) | Low noise of less than 40dB thank to maglev frictionless technology |
Product appearance | Ordinary | Beautiful |
Installation height | High (need to avoid the terrain turbulence) | Low (not influenced by turbulence) |
Installation location | Open area like suburb | Any locations |
Generator material | Plastic or composite | metal |
Structure strength | Poor (easy to broken) | High(double strengthen arm) |
Resistance of wind speed | Poor(about 40 m/s) | High |
2. Is it hard to install the wind turbine?
Re: System can be assembled in under an hour , without any welding; and ingle or multiple unit connections for greater energy generation. In addition, it is easy for connection with PV systems
- Q:How to handle the qualification test, what kind of power equipment
- (a) legal person qualification and perfect organization; (two) the registered capital and net assets of 60 million yuan; (three) the last 3 years to bear the following first items listed, third project and second sub items listed in any one project, and the project quality: above 1 thousand and 330 volts voltage substation 2 or 220 thousand volt substation 5; more than 2 thousand and 330 volt overhead lines 300 kilometers or 220 thousand volt overhead line of 500 kilometers; more than 3 thousand and 220 volt cable line 80 kilometers or 100 meters above the level crossing tower crossing project 1.
- Q:What is the amount of equipment used? Higher profits? Do you have any power generation companies in China?
- Two equipment: all kinds of protective devices, automation devices and systems, including communications equipment, computer equipment, etc.; monitoring equipment: computer, industrial television and related equipment; fire equipment;......
- Q:Pre checking and checking of goods in power system
- Pilot: the full name of the preventive test, generally in terms of a power system equipment, in order to find in the operation of equipment problems, to prevent the occurrence of accidents or damage to equipment, equipment for inspection, testing or monitoring, including oil sampling test or gas samples. The preventive test is the operation of power equipment and to maintain an important aspect of the work
- Q:How long has the power of power electronic equipment delivered water
- ; equipment (mainly separator population) and pipeline (mainly elbow) wear faster, if the design, construction or improper operation, is easy to cause material deposition, so that the conveying jam, interrupt; transportation should not be high humidity, viscous or easily broken material etc..
- Q:Definition of power equipment defects
- An abnormal or hidden danger of the equipment or facilities that are in operation or spare. These anomalies or hidden dangers will affect the human body, power grid and equipment safetyReliable and economical operation of the power grid and equipment; equipment output or life; power quality.
- Q:What are the technical measures to ensure the safety of the power line equipment?
- 5 hanging sign and installing fence (fence).These are the contents of safety regulations (line part)
- Q:Electric power equipment start-up and commissioning of the project there is a difference?
- After a single commissioning, and then linkage test, after the test, such as no-load, put into operation in the above steps are completed, the test is no problem, start running with load.
- Q:The company has a number of power equipment to be exported, need to go through the sea, the technical requirements of three, I would like to ask what is the three here? How to check whether the complete sets of components used to do three treatment? Please exhibitions, grateful!
- As well as protection, control, measurement and other devices are assembled in a whole cabinet, there are a number of high-voltage switchgear in power plants, substations or power distribution equipment installed after the installation of the power plant is called a complete set of power distribution equipment.
- Q:What is the meaning of the high - voltage high - voltage device in power system, which is mainly used to protect the equipment and equipment
- There has been greater than the power load power requirements, response to the power parameters is high frequency, this requires high cycle splitting device, tripping the corresponding circuit breaker, to remove the part of power grid connected or separated from the original into two or more power to lift the accident or the narrow scope of the accident to
- Q:Recently went out to do the test, do not know the difference between the two tests
- The purpose of the test is to test the performance of the equipment to prevent the occurrence of the fault, the former is the first time after the installation of the equipment to change the nature of the acceptance test, which is run during the routine. The content of the test items are different.You check the 1 power standards will know, since you do this test should have a standard hand.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Maglev Vertical Axis Wind Turbine for Home Use 600W-24V/48V
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 50 set
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products