• Maglev Vertical Axis Wind Turbine 300W System 1
  • Maglev Vertical Axis Wind Turbine 300W System 2
Maglev Vertical Axis Wind Turbine 300W

Maglev Vertical Axis Wind Turbine 300W

Ref Price:
get latest price
Loading Port:
Shekou
Payment Terms:
TT or LC
Min Order Qty:
-
Supply Capability:
2000 units/month set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.  Structure of Maglev Vertical Axis Wind Turbine 300W

Maglev Vertical Axis Wind Turbine 300W is ranged as three-phase AC maglev wind turbine, which is designed for utility and adopts three Aluminum Alloy blades with magnetic levitation technology theory, it can work with  no mechanical friction,no gear  in the motor case.

 

2.  Main Features of  Maglev Vertical Axis Wind Turbine 300W

Benefits maglev VAWT in comparison to a propeller wind generators:

(1) higher efficiency than the propeller blades   works even in turbulence

(2) visually pleasing appearance

(3) rotation of the blade quiet or almost minimal acoustic noise

(4) movement of the blades even in low wind 1m/sec

(5) turbine construction is resistant to gale 160km/h (100MPH)

(6) designed for mounting on mast, straight or saddle area

(7) design: aluminum, stainless steel, fiberglass

(8) direction of rotation by earth hemisphere using Coriolis force

(9) half design against vane turbines, with the same power

 

3. Maglev Vertical Axis Wind Turbine 300W Specification

Rated Power:300W  

Wind wheel diameter:1230MM(D)/1090MM (H)  

Weight:29KG        

Minimum wind speed start:1m/s  

Minimum power wind speed:2m/s                                                                      

Minimum charge wind speed:2.5m/s    

Rated wind speed:12m/s    

Maximum cut off wind speed:15m/s                                                                      

Resistant to wind speed limit:65m/s                   

Controller output voltage:12V or 24V  

Controller output current:<20Amp                                                                        

Controller brake system: Over speed automatic Three-phase short-circuit braking

Normal operating temperature:-30~50 ℃

 

4. Maglev Vertical Axis Wind Turbine 300W Images

Maglev Vertical Axis Wind Turbine 300W

 

5. FAQ

 

Q1: How is the installation for the wind turbine?

Re: It is easy to instal the turbine, and the system can be assembled in under an hour without any welding.

 

Q2: Is it difficult to be connected to the PV system?

Re: No, it is easy acturally.

Q:What equipment is necessary on the list of electrical engineering equipment?
MSXB-F-75kVA/720kV frequency conversion resonance withstand voltage test device, MSDBF-30kVA multi frequency induction withstand voltage test device,
Q:Power equipment Market Overview
The first quarter of 2013, China's economy once again showed signs of slowing down, iron and steel, nonferrous metals and other raw material prices low volatility, electric power equipment manufacturing production costs at a relatively low level; at the same time by the industry overcapacity, fierce competition in the product market, a common means of low bid for corporate competition. Affected by the above two factors, the 1 quarter of China's power equipment manufacturing industry most price decline, in the electric power equipment Chinese Machinery Industry Federation statistics, 22 small manufacturing industries, there is decline in price index rose only 16 sub sectors, 6 sub industry price index.
Q:What are the relevant national standards for power equipment?
The standard is very thin do not know what you want to give you some of the specific power of the main reference
Q:The problem of electric power equipment withstand voltageWhy does the pressure decrease when the altitude is high? The air is thin, is not easy to breakdown (vacuum breakdown is not very low atmospheric pressure)
The air is easy to produce ionization, so it is necessary to improve the insulation level and increase the gap of high voltage electrical apparatus
Q:Would like to ask: railway communication, signal, power equipment installation related to mechanical and electrical engineering? If belong to, including specific aspects. Thank you
3, in fact, including the power of the two professional: power and electrification. Including contact network infrastructure, post, wire rack, remote control, lightning protection system, station lighting intelligent control etc..Belong to the scope of the installation should be the station (communication station) equipment into the test, the basis of processing and installation, equipment installation, commissioning of the single body, the electrical subsystem Unicom debugging, the whole system of professional debugging unicom. And other railway professional with the commissioning test, etc..
Q:I do sales of electrical equipment, how to deal with the power supply bureau?
380 low voltage line equipment (switchboard, overcurrent protector, etc.) or electrical equipment (such as electric energy metering, checking table, meter and electric meter box, etc.) if you want to make better cooperation effect you, if you have the ability, then of course you directly to the main leadership of the power department is better the.
Q:Hello, I would like to ask what are the main rotating equipment in the power system? What is a rotating device?
A device with a motor can be called a rotating device. Power system mainly refers to the generator, motor
Q:How to solve the short circuit of emergency communication equipment
, a number of amateur radio enthusiasts, radio license, the application of their own call sign plate, usually just play the role of decoration,
Q:1 what is the power system and the power network? 2 what is the rated voltage of the electrical equipment? Why do the power system to use a variety of voltage levels? 3
The electric power network is referred to as the "power grid", which refers to the connection between the bus from the booster station of the power plant to the bus of the substation.
Q:How to strengthen the management of electric power information communication equipment
As an important infrastructure in the process of automation and management modernization of China's power grid dispatching, the high efficiency and scientific performance of power information communication equipment can effectively promote the safe operation of power grid.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords