Tower Cranes self climbing grove QTD4015

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
60 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

QTD4015 Description

Feature: Tower Crane                  Condition: New 

Application: urban construction    Rated Loading Capacity: 6T 

Rated Lifting Moment:120KN.M    Max. Lifting Load: 6T 

Max. Lifting Height:34M               Span: 40M 

Model Number:QTD4015

Certification: ISO9001:2000; CE;Ukraine & Belarus Certificate 

Colour: Orange/ Yellow 

After-sales Service Provided: Overseas third-party support available 

QTD4015 Features

1.Ten years of experience in supplying new self-erecting tower crane with Taiwo Brand.

2. Export to more than 20 countries with CE/ISO/GOST Certificates.

3. Stationary/Travelling, external/ internal climbing tower crane 

4. Impeller blasting/rust protection paint

5. Advanced painting process

6. Potain masts designed with dismountable panels, making teansport easier and cheaper. 

7. New designed mast, can be used to Internal and external climbing tower crane

8. Engineers available to service machinery overseas.   

QTD4015 Specification

Tower Cranes self climbing grove QTD4015

QTD4015 Pictures

Tower Cranes self climbing grove QTD4015

Tower Cranes self climbing grove QTD4015

Tower Cranes self climbing grove QTD4015


QTD4015 FAQ

Q: What about our tower crane's warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.


Q: What is 3 main mechanism of the tower crane?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.


Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.





Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Can a crane malfunction like the one from spiderman 3 happen?
I have not seen the movie, but I think I saw what you're talking about on a preview. I would think that the safeties involved in the control system for a crane would make it highly unlikely to happen. There is no absolute assurance, only probabilities or likelihoods. You just hope that you have enough failsafes in the system so if one part of the system fails, the others will take over, or shut the whole thing down properly.
Q:How do crane operators get up there?
There are ladders leading up there. Crane operators are fit enough to do the climb at least twice a day. I climbed cranes on weekends as a hobby photographer to take panoramic shots from that nice position up there. It was quite a climb to get up more than 200ft (60m)
Q:Are the creators of the Karate Kid movies apologetic about the white crane defensive stance?
Why should they be? That stance is from an art that is practiced by a small number of practitioners in Okinawa known as Hakutsuru, which means White Crane. It was hollywood-ized... so what? The original movie was written by a practitioner of Goju Ryu, who trained in NYC under an instructor from the Bronx named Kao Loong Ong. He knew there was a link between White Crane and the development of Okinawan Karate. Robert Kamen trained with Kayo, as he is known, who is Chinese and is well known in NYC's China Town. If they should apologize, hollywood must apologize for their misrepresentation of SO many things - insults to practically all the cultures of the world.
Q:how a tower crane for a high rise building construction is erected?
Depends on the type - if the building is not that tall, the tower crane could be built by any taller crane (either a mobile one or an existing one on the site). If the building is very tall, a self-erecting crane is usually used; this type has a sort of jack mechanism somewhere in the tower (usually near the bottom), so as it is needed, the existing tower can be lifted, and another tower section is inserted to raise the entire structure, repeating the process as needed as the structure the crane is building gets taller (thus, the crane is building itself as it goes along).
Q:what is the crane track base ?
Mechanical or birds?
Q:Japanese 1000 paper cranes?
I think it's a one time deal. You don't have to string them. You have as long as it takes. Look up Sadako Sasaki. She was a 12 year old Japanese girl who tried to fold 1000 cranes while in the hospital in the 1950's. She had A bomb disease, also know as leukemia. She got it because of the bombing of Hiroshima as a baby. She died after only making 650 or so cranes. It's a very good true story though.
Q:How does cranes make use of simple machines?
Is A Crane A Pulley
Q:What's the difference between QTZ63 and qtz630, isn't it the same kind of tower crane?
Should be the same series, but lifting weights are not the same
Q:A crane lifts a 2.75x10^3N bucket containing 1.20 m^3 of soil (density = 2.00 x10^3 kg/m3)to a height of 6.95m?
Crane work = weight to be lifted x 6.95 m Weight to be lifted = 2.75x10^3 N + 1.20 m^3 (2.00 x 10^3 kg/m^3) (9.8) = 2750 + 23520 = 26270 Therefore, Crane work = 26270 x 6.95 = 182576.5 J
Q:What should I do with my 1000 paper cranes?
Sell them or give them to someone who is going to get married. My nephew gave paper cranes to every guest who came to their wedding. Each guest was to write a line of advice or blessing on their crane. Then the cranes were hung on strings with little clips at the reception. It was beautiful! Folding a crane takes time, patience and understanding. These same qualities are vital for a marriage to last. This is why the symbolism of 1,000 hand-folded cranes decorating a wedding is so powerful.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range