Tower Crane TC7034 Construction Equipmen Sales Wholesaler

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Tower Crane TC7034 Description:

1.CMAX Tower Crane TC7034  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC7034 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC7034 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC7034  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC7034  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC7034 Parameter:

 Max. working range 70m, tip lifting weight 3.4T and Max. lifting weight 12T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 50

Max height with attachment (m) 200

Working range can be adjusted (m) 50、55、60、65、70

Min working range (m) 2.5

Max lifting capacity (t) 12

Tip load @ 50m (t) 3.4


Tower Crane TC7034  Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC7034 Diagram:

Tower Crane TC7034 Construction Equipmen Wholesaler Sales

Tower Crane TC7034 Construction Equipmen Wholesaler Sales

Tower Crane TC7034 Technical Sheet:

Tower Crane TC7034 Construction Equipmen Wholesaler Sales

Tower Crane TC7034 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC7034 for example, the first two letters “TC” means Tower Crane, “70”means jib length is 70 meter, and the last two letter “34” means the tip load is :3.4 ton.

3. What is the principal to quote the right tower crane to the client?

    First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Story where boy/girl makes 1000 paper cranes?
Sadako and the 1000 paper cranes by Eleanor Coerr; the anime theatrical.
Q:what is the best type of crane certificate to get?
Tower cranes and Gantry Cranes Since toer cranes are the most used in the construction industry gantry Cranes are used in all Ports for loading and unloading containers has a vast scope of work
Q:Are tower cranes the same as tower cranes?
Tomato, you tomato, potatoes, you potatoTalent exchange of tower crane and tower crane
Q:What is the safe distance of a tower crane to the surrounding buildings?
JGJ160-2008 "construction site mechanical equipment inspection technical regulations" on the 46 page clearly written, safety distance shall not be less than 0.6 meters,
Q:What is a really creative way to ask a girl to prom using 1000 origami cranes?
I love the idea!!! it's really cute!!! I have the perfect idea...it just hit me! MY IDEA: Do you have a lake or some type of water flowing in your school yard? Trees too? If yes, then here's the idea: 1. Put some type of plastic wrap at the bottom of each crane so they can float on the water. 2. Hang those oragomis you've shown in trees. 3.Have one of your female friends get her and bring her to the area. 4. Then when she's wondering what's going on....here's where you come in. You said that 1,000 oragomis stand for a wish right? This is what you say with a crane out of the water in your hand: Behind these cranes, is a maker who has a wish. When you hand her the crane, she'll get the point. Hope she says yes! And if she says no, screw her! I wish the guy who asked me was that creative. Any girl should happy to have a guy go through this much just for her. Good Luck Dude!!!!!
Q:What do you think of paper cranes?
paper cranes take me about 3 minutes to make, that means he took 50 hours making them, wich means he spent 2 whole days folding non-stop... that isn't enough to make a lasting impression, even for a 14yr. old.
Q:Making 1000 origami cranes?
That depends on your wish. If your wish is to have 1000 origami cranes or your wish is that you become really good in folding origami cranes I would think it will come true. But maybe you could also wish for a smile from every stranger you give an origami crane to as a present, you might not even have to wait until you've made 1000.
Q:Why did Dr. Crane work for Ra's Al Ghul and with Falconie?
Only Crane did. Falcone was merely the top dog crime boss at the time. Ra#x27;s al Ghul is a self proclaimed savior of the world, a person who thinks he can cleanse the world of crime, but actually an extremist who just wants to watch civilizations reach their pinnacle then see them destroyed. Here#x27;s a quote from Batman Begins: Gotham#x27;s time has come. Like Constantinople or Rome before it the city has become a breeding ground for suffering and injustice. It is beyond saving and must be allowed to die. This is the most important function of the League of Shadows. It is one we#x27;ve performed for centuries. Gotham... must be destroyed. Get the idea? Crane helped create a fear toxin in Batman Begins but Batman foiled it. Bane came to Gotham to wreak havoc and become Gotham#x27;s Reckoning but Batman foiled him and Ra#x27;s daughter, Talia#x27;s plans. Both plans were to spread fear and both were foiled. One last thing about Ra#x27;s: He#x27;s the immortal Devil of the D.C. Universe.
Q:What are the differences between the tower crane and the lift?
Tower crane is a machine which transports construction materials within the construction site based on its radial range. Usually the radius of tower crane is around 50m to 60m. Capacity ranges from 3 to 6 tons Lift is only used for vertical transport of materials or people in certain building or construction site. Capacity ranges from 2 to 4 tons.
Q:Stephen Crane and Willa Cather (talk about your odd couples) met briefly. He died shortly after at 29, I think
To Kill A Mockingbird is my widespread out of those video clips! ineffective night Cowboy and The wonderful Couple are large too! i've got no longer seen Psycho and The Hustler. The Graduate became into basically ok.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range