Tower Crane TC6520 VFD+PLC technical control

Ref Price:
$40,000.00 - 80,000.00 / unit
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

Structure of Tower Crane TC6520 Description


Feature: Tower Crane                          

Condition: New                              

Application: Construction          

Max.Lifting Load: 10T                           

Max Tip Load:2.0T                          

Independent Height:50M

Max Lifting Height: 200M                      

Span: 65m                                      

Certification: CE,ISO

Place of Origin: China(Mainland)          

Model Number: TC6520         

 

Packaging & Delivery of Tower Crane TC6520


Packaging Detail: Nude package          

Delivery Detail: 25-30days

 

Main Feature of Tower Crane TC6520


 

Our tower crane is self-erecting and wall-attached tower crane, in addition to it's advanced parameters, reliable performance, well-looking appearance, and excellent quality.

 

It has characteristica such as long boom, largeworking coverage, hydraulic rising, and tandem mounted tower body.

 

It's design idea shows advantages including simple structure and good applicability, convenient maintainability, and lower price at the same time to emphasize meeting the requirement from construction units at different levels.

 

It's lifting height is obviously increased thanks to its self-erecting and wall attached function.

 

It is applicable for construction of different industrial, commercial, office, and civil building lower than 220m, and becomes an ideal service-building machine at home.

 


Tower Crane TC6520 Specifiction

 

 



Images of Tower Crane

 

 

FAQ of Tower Crane

 

Q: What serice you could provide?

A: Providing timely delivery, standby engineers are ready to slove any of your problem

    Providing all-embraced warranty of products quality, worksite installation guidance

    Providing ample spare parts and training of operation and maintenance

    Engineers have more than 20 years' experience in tower crane, ready to solve any of your  problems.

 

Q: What about our tower crane's warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the tower crane?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How do they use cranes at +600 meters hight to build a building like the Burj Khalifa?
The cranes are jack-up cranes. They have their own self-contained jacks. As one floor is completed, they jack up to the next level. The cranes are on top of the buildings. They are designed by structural and mechanical engineers to loift a given weight.
Q:What special operators should be equipped for the installation and disassembly of tower cranes?
According to the requirements of the 2.0.3 specification: tower crane tower crane installation and disassembly operation should be equipped with the following: 1, hold a qualified safety assessment certificate of the project and responsible for the safety of people and machinery management personnel; 2, with construction qualification certificates for special operations of the construction hoisting machinery installation and disassembly, lifting work, special operation signal heavy drivers, riggers and other operations personnel. And an electrician.
Q:83 camaro crane cam 305 v 8 4brrl edelbrock carb problem.?
the first thing to do is eliminate a vacuum leak problem. get someone to keep the car running and then spray some carb cleaner around the base of the carb. if there is a leak it will be obvious. make sure all lines are plugged or not leaking even if you have to isolate the carb to be sure. if the carb was used it could also be a stopped up idle circuit. eliminate all the simple stuff before snatching out the distributor. that may well be the problem, but on older vehicles a idle stall is usually, but not always,' associated with a vacuum leak or bad carb.
Q:The arm of a crane at a construction site is 12.1 m long, and it makes an angle of 30° with the horizontal.?
(a) What is the magnitude of the maximum torque the crane can withstand if the maximum load the crane can handle is 500 N? τ = FL τ = 500(12.1cos30) τ = 5239.45 τ = 5240 Ν•m (b) What is the maximum load for this crane at an angle of 35° with the horizontal? τ = FL F = τ / L F = 5239.45 / 12.1cos35 F = 528.6109... F = 529 N I hope this helped. Please remember to vote a Best Answer from among your results. It's good karma as it keeps things in balanced exchange.
Q:Tower crane body standard section connection bolt screw upward or downward, why?.
A few days ago, a special training course of mechanical equipment, a safety supervision station old experts say the screw from the upward wear, stress is the same, but if the nut screw will fall off, in order to find problems. If you can't get it off the top and bottom nut, you won't find it
Q:Is there a world record for making paper cranes?
I would love to find out and compare it to the commercial where the girl is in the bathroom making toliet paper cranes. Since it's not published online - you'd have to find someone with a new copy of Guinness World Records
Q:what are Gantry cranes?
www.okorder.com/
Q:Who is the most gruesome Stefano DiMera or Alistar Crane?
Stefano DiMera
Q:What is the torque limiter of the tower crane A: the lift is stopped when the lifting torque is exceeded. B: over gravity
The torque limiter acts as follows: (a)In lifting process, when the weight of the lifting object moves ahead of the trolley when the lever force exceeds the moment limiter, the hook rises, the motor and the trolley forward motor are stopped at the same time, and the utility model has the safety function.
Q:how do they erect those huge cranes for constuction?
I'm sorry, but there is no way that a crane can lift another section of itself up in the manner described by the first person (lift another 20-foot mast section into the gap opened by the climbing frame). Can you lift yourself off the ground by pulling up on your own collar? I was told that the crane is jacked up from the bottom, and they slide another section below the jacked up crane. Then they lower and bolt the crane to the new section that was inserted under the bottom.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range