Tower Crane TC6024 Chinese Qualified Brand

Ref Price:
$40,000.00 - 80,000.00 / unit
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month
  • OKorder Service Pledge
  • Quality Product
  • Order Online Tracking
  • Timely Delivery
  • OKorder Financial Service
  • Credit Rating
  • Credit Services
  • Credit Purchasing

Add to My Favorites

Follow us:

Structure of Tower Crane TC6024 Description


Feature: Tower Crane                          

Condition: New                              

Application: Construction          

Max.Lifting Load: 10T                            

Max Tip Load:2.4T                          

Independent Height:50.5M

Max Lifting Height: 200M                      

Span: 60m                                      

Certification: CE,ISO

Place of Origin: China(Mainland)          

Model Number: TC6024         

 

Packaging & Delivery of Tower Crane TC6024


Packaging Detail: Nude package          

Delivery Detail: 25-30days

 

Main Feature of Tower Crane TC6024


 

Our tower crane is self-erecting and wall-attached tower crane, in addition to it's advanced parameters, reliable performance, well-looking appearance, and excellent quality.

 

It has characteristica such as long boom, largeworking coverage, hydraulic rising, and tandem mounted tower body.

 

It's design idea shows advantages including simple structure and good applicability, convenient maintainability, and lower price at the same time to emphasize meeting the requirement from construction units at different levels.

 

It's lifting height is obviously increased thanks to its self-erecting and wall attached function.

 

It is applicable for construction of different industrial, commercial, office, and civil building lower than 220m, and becomes an ideal service-building machine at home.

 


Tower Crane TC6024 Specifiction


 


Images of Tower Crane

 

 

FAQ of Tower Crane

 

Q: What serice you could provide?

A: Providing timely delivery, standby engineers are ready to slove any of your problem

    Providing all-embraced warranty of products quality, worksite installation guidance

    Providing ample spare parts and training of operation and maintenance

    Engineers have more than 20 years' experience in tower crane, ready to solve any of your  problems.

 

Q: What about our tower crane's warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the tower crane?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.

Q:In the Bride comes to Yellow Sky, Stephen Crane uses symbolism to evoke in readers a sense of the “old west”. However, the knowledge of the “old west” that the average person holds in his or her mind is false and nothing more than a Hollywood created myth. By using the symbols inherent in Hollywood’s old western myth Crane manipulates the reader’s misconceptions only to leave them feeling stupid when he reveals a hole in that way of thinking with the irrational ending.This is actually a thesis i'm working on for an analytical essay on the piece.I need to know if anyone has ever read the story and gotten the same feeling Crane was having fun at the reader's expense or perhaps poking fun at the old western I have very good points from the text to support my thesis but i cannot find anything online that touches on the possability of this being a parody. Anyone else think Crane's having fun or is a bit condescending in this piece?
I have to say no. Your question erred in a significant way. Hollywood didn't create this false image of the West. The false image was created a long time before by people living in the age of the incidents. It didn't take publishers long to notice that people living back East enjoyed these gritty depictions of the West. Dime novels were a big seller in the 18th and 19th centuries. Look at Stephen Crane. He died in 1900. Hollywood was non-existent as the facet of American life that it holds now. Crane would have been writing this story with the idea that he was depicting a real slice of the wild West that was becoming more civilized.
Q:I started to make 1000 paper cranes to make a wish come true and before I start I have a few questions. How many times can you make 1000 cranes to make a wish come true? Do you have to string them? And how long do you have to make them?
You only have to fold 1000 to make your wish come true. It doesn't matter how long you take on them, but they should look acceptable if you'd like to display them. All you really have to do is fold all 1000 cranes; you do not have to string them, but I think it looks very nice. You could also put them inside of a jar. :)
Q:What is the difference between lifting height of tower crane and independent height?
Of course there is a difference. Independent height refers to the highest height of tower crane in its free state. Lifting height refers to the height of actual tower crane design.
Q:How does the torque of a construction crane relate to the torque of a car?
In an automobile, you are looking for torque over a wide range of speeds and loads. A crane does not need to have a great deal of speed in terms of lifting an object but does need a great deal of torque. The result is an automobile needs much more horsepower to meet its goals while a crane can actually lift a huge load with a much smaller amount of horsepower. I personally can remember a lift on one of the construction projects I was field engineer on. The lift of 650,000 pounds was made with two 85 horsepower Ford gasoline engines and two industrial gear boxes.
Q:my yard is infested with crane flies. Help please.
It's impossible to think of an insect more harmless than a crane fly. Enjoy them.
Q:What should I do with them? who would accept them if I donated them?
My brother-in-law won my niece an orange, Halloween cat from a crane when she was very small. She carried that cat everywhere. However, she recently lost it. I've been googling for a replacement. Is there any chance that you have an item like that in your menagerie? And to answer the original question, Salvation Army and Goodwill are great places, but so are state and federal organizations like the Department of Social Services and local Police Departments or Fire Stations. I work for DSS and many agencies like that give away a stuffed animal to any child involved in a case. Just a thought.
Q:How do you test the tower crane? Myopia can span tower crane? Brother here, please all heroes.
See the ability of individuals, the first ticket 650 yuan graduation card ID card (copy) medical certificate according to 3 inch 3 days learning theory exam two days of practice examination through 15 days notice thank you hope to adopt licensing
Q:Hi friendsI need some sketches of automotive crane?In which site or web log I can find it?
I'm not sure what you mean by an automotive crane: a tow truck, a crane for lifting car engines, or a crane for lifting cars. Anyway, try google images. Search for automotive crane and see what it turns up.
Q:are parts availble for shop crane? Hydraulic ram plunger o rings has split....need part?
What is the crane make and model? If you don't have the model of the crane you can stop by almost any hydraulic/hose shop, they should be able to match up the packings.
Q:Operation points of tower crane (tower crane)?
Slewing bearing: tower crane is one of the most critical components, mainly to bear overturning moment and vertical load. After the failure, the demolition and replacement is extremely difficult, loss of large, so you have to check carefully to do maintenance, each 200H must be a senior grease lubrication from the rotary bearing surface, until now exudation. Slewing bearing adopts high strength bolt connection, if the pretension is not enough, or long-term operation, do not check, not fastening, will cause loose. If the individual bolts loose, will cause the remaining bolts overload, the consequences will be disastrous. The luffing mechanism only moves horizontally, the load is light and the line speed is not high, so it should be easy to master and operate. However, the amplitude involves the change of the lifting torque, and if there is no stopping in time, there will be the possibility of over torque. Therefore, the main requirement of variable amplitude operation is stationary parking and accurate positioning. The tower crane is of great height and the hanger is hung longer, so it is easy to swing the hanger when it is running. This is an objective phenomenon. What is called stabilization hook operation is how to make the swinging hook stop quickly, or how to make the hook move with the movement of the crane as soon as possible, and minimize the operation of the swing. The operation of stabilization hook is the skill that the driver should master.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request