• Tower Crane TC6016 stepless speed in China System 1
  • Tower Crane TC6016 stepless speed in China System 2
  • Tower Crane TC6016 stepless speed in China System 3
  • Tower Crane TC6016 stepless speed in China System 4
  • Tower Crane TC6016 stepless speed in China System 5
  • Tower Crane TC6016 stepless speed in China System 6
Tower Crane TC6016 stepless speed in China

Tower Crane TC6016 stepless speed in China

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 Quick Details


Feature: Tower Crane                          Condition: New                                           Max.Lifting Load: 10T

Span: 60m                                             Place of Origin: China(Mainland) 

Brand Name: CMAX                              Model Number: TC6016         

 

Packaging & Delivery


Packaging Detail: Nude package          Delivery Detail: 25-30days

 

Specifications


● Max. working range 60m, tip lifting weight 1.6T and Max. lifting weight 10T.


● Slewing mechanism and trolleying mechanism equipped with VFD technical control, stable and reliable,can provide stepless speed regulation.


● Outstanding in working efficiency, operating speed and stability. Reduce future maintenance cost.




FAQ

 

Q: What is the difference between CNBM and CMAX?

A: CNBM stands for China National Building Materials (Group) Corporation, which is established in 1984, is the largest state-owned group corporation of building material & machinery with a total asset of 15 billion USD and a staff of 100000.

CMAX is the brand name of CNBM Group’s construction products, C stands for China and Max stands for Maximum.

 

Q: What is the principal to quote the right tower crane to the client?

A: First, we need to know clients’ requirements. Normally the following information should be clarified by the client: max lifting capacity, height (height under hook), tip load and jib length.

Second, we need to know what the foundation requirement from the client is. (Fixed/undercarriage/ undercarriage with traveling system), mast section type (panel/integrated), power supply source (voltage, ampere and frequency), the distance between the machine and power supply……

Third if there are special needs, CNBM could suggest proposal according to clear data provided by the clients. End-user, as construction machinery buyer, knows the site situation well and should make decision, such as the machinery specification, type…….

 

Q: What about our tower crane's warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the tower crane?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.



 


To Lead The Revoluation of International Trade

Q:I am 15 years old and into urban exploration. The only thing I haven t done yet is climb a crane. I don t want a big lecture on the dangers because I am fully aware of how dangerous it is and am also fully confident in my abilities. I am also ready to take full responsibility if I were caught. Although I know its Illegal, I don t know how Illegal it is and I would like to know the following...1. Will Crane Climbing get me charged with criminal trespassing?2. Will I get time in Juvenile?3. Is it possible that I could accidentally activate/deactivate something that would endanger the workers?4. What would happen if a worker got ahold of me?And again I feel like I need to mention that I don t want a Bull **** lecture on it not being safe. :)
Yea, BS you'll be taking full responsibility. If you get hurt during this, who will have to take care of you? A parent. If you have to go to court, who is going to have to take time out of their day to go with you? A parent. Legal issues always have fines and court costs attached to them. Who is going to pay for that? Again- a parent.
Q:It's a local company in Omaha that seriously could be the next Starbuck's if they ever expand.
It won't expand if Starbucks have their way. They have driven all their competiton out of business. I hope Crane Coffee can survive.
Q:I was wondering if Steam Cranes are still used to clear train derailments or are the all mothballed now? What do they use to clear derailments now days if the not the Steam Cranes? Also way are there 2 types of hooks on the crane anyway? Thanks
They started to go by the wayside in the early 80's around here, though they were still in use until technology caught up and they could manufacture a 200 ton capacity crane for use on the highways. They had Hi-rail equipment and could get to the scene of a derailment much quicker than the old steam derricks. Near the end, I know there were at least 5 still operating, but the problem was, there were only two guys on the system that could run one of the things. Steam is the key word. We're all used to seeing crane operators running the machine from their little cab and moving the levers that control the hydraulics. But, it was amazing to see a guy run one of the Bucyrus Erie 200 ton derricks. All the functions were controlled by various valves that were scattered around the operators position, and it was like watching some kind of choreography; ballet, even. The sights, smells and sounds of the thing in action were no less eye catching than watching the operator himself.
Q:Answer please~
You know what? I thought they did but I just went through my copy again and I can't find any mention of him by name. I apologize for the incorrect answer I gave earlier.
Q:how a tower crane for a high rise building construction is erected?
Depends on the type - if the building is not that tall, the tower crane could be built by any taller crane (either a mobile one or an existing one on the site). If the building is very tall, a self-erecting crane is usually used; this type has a sort of jack mechanism somewhere in the tower (usually near the bottom), so as it is needed, the existing tower can be lifted, and another tower section is inserted to raise the entire structure, repeating the process as needed as the structure the crane is building gets taller (thus, the crane is building itself as it goes along).
Q:You know those machines you pay and get like 15 seconds to operate the fricken metal hand?Can you give me some tips?
make sure you find something that isn't trapped by anything else in the pit.. line up the crane one the front, then move over to the side and line it up... these machines used to be a lot easier 20 years ago, but now the arm doesn't apply much pressure.. it has to be lined up just right or you will never get anything...
Q:Please no direct translations. I need the official name of the whooping crane in French.
When I don't know a word and it is not in the dictionary, I enter it in wikipedia and then change the language on the left to see the corresponding article in the other language.
Q:I'm talking about the movie, for those of you who have seen it. If you have seen it, you can probably recall one of the final scenes where head Gamemaker Seneca Crane is being walked to his death by two Peacekeepers. I really want a picture of this! Why? Because the Peacekeeper on the right is my dad! I think it would be awesome if I could get him a picture of this since he is so proud of it! So if anyone knows where I can find a clip of this scene, or knows where I could get a picture, could you please tell me? I'd really appreciate it! Thank you!
I don't think it would be out there yet, as the movie just came out. I would try searching Seneca Crane and then your dad's name. You also might be able to find it on YouTube. It's really cool that your dad was in the movie!! Good luck finding the picture!
Q:the red badge of courage, a novel about the civil war, the verb wrote is A) transitiveB) intransitive
Transitive - because it has an object The Red Badge of Courage. . Generally, if you can put the word something after a verb, it is transitive. Stephen Crane wrote something .
Q:Tower crane 5610 why is it called QTZ63?
Q is reusable, T is tower, Z is jack up, and combined is jack up tower crane. (this is the earliest known China, now the various manufacturers have their own name, some close to the French take, such as F0/23B, the tower jib 50 meters, a maximum weight of 10 tons, 2.3 tons of weight lifting arm tip)80 is the moment, the unit is t * m, (should say is the force multiplied by distance, 800kn.m) for 5613 cranes, the maximum lifting capacity of 8 tons, the boom length is 56 meters, arm tip lifting weight 1.3 tons, maximum weight in the range of 2.5 meters ---13 meters, calculation of 8 * 13=104, so the name is QTZ104, now the provisions should be a QTZ104, but before, people think is 8 tons of weight, so called QTZ80, is now available.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords