Tower Crane Split in row of weight QTZ160(7015)

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
700 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

QTZ160(7015) Description

Feature: Tower Crane               Condition: New 

Application: urban construction  Rated Loading Capacity: 8T /10T

Rated Lifting Moment: 160MT    Max. Lifting Load:8T/10T

Max. Lifting Height: 195M           Span: 70M 

Model Number: QTZ160(7015)

Certification: ISO9001:2000; CE;Ukraine & Belarus Certificate 

Colour: Orange/ Yellow 

After-sales Service Provided: Overseas third-party support available 

QTZ160(7015) Features

1.Thirteen years of experience in supplying new self-erecting tower crane with Dahan Brand.

2. Export to more than 20 countries with CE/ISO/GOST Certificates.

3. Stationary,Travelling, external,internal climbing tower crane 

4. Impeller blasting,rust protection paint

5. Advanced painting process

6. Potain masts designed with dismountable panels, making teansport easier and cheaper

7. New designed mast, can be used to Internal and external climbing tower crane

8. Famous brand mechanism system, Schneider Electronic control system, jiangte and jiuhe motor

9. Engineers available to service machinery overseas.   

QTZ160(7015) Specification

Tower Crane Split in row of weight QTZ160(7015)

QTZ160(7015) Pictures

Tower Crane Split in row of weight QTZ160(7015)Tower Crane Split in row of weight QTZ160(7015)Tower Crane Split in row of weight QTZ160(7015)

QTZ160(7015) FAQ

Q: What kind of steel used for tower crane?

A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.


Q: What is tower crane?

A: Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.


Q: What is the principal to quote the right tower crane to the client?

A: First, we need to know clients’ requirements. Normally the following information should be clarified by the client:  max lifting capacity, height (height under hook), tip load and jib length.





Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:When the tower crane top height is more than meters
Circular of the Ministry of housing, urban and rural construction on Issuing the measures for the safety administration of sub hazardous and sub divisional projectsAnnex No. [2009]87 [Annex two]"More than a certain size of the risk of larger sub sub project scope."
Q:More than meters of tower cranes must be equipped with red barrier lights at the top
however, tower cranes over 30 meters above the tower shall be equipped with red light on the top of the tower and jib.
Q:Are there any special requirements for the installation of wall fittings of tower cranes?
The wall pieces should be rigidly connected on the wall of the embedded parts.
Q:Tower crane and tower crane 5
Tower crane is tower crane. It depends on where you are and what you transport. These are the keys.
Q:Tower crane body standard section connection bolt screw upward or downward, why?.
Usually it is worn from top to bottom, so that the nut is loose and the bolt will not fall directly
Q:What should the sub contractor do before the installation of the bridge crane in the workshop?
Baidu search [tower crane tower demolition, lowering section safety technical disclosure]. If it is installed, remove the "two words" to "installation", and other contents are adjusted slightly.
Q:How to build a tower crane?
4, combination and installation with the boom, hung with arm pull rod.5, the assembly and installation of crane. This boom just installed in the rotary device, the other end is able to lift and hang rod, in accordance with the installation instructions.The power supply auxiliary hoist with 6, switch on the tower cap following installation, the installation of counterweight boom hoist with the.
Q:How many meters is the tower crane installed on the edge of the deep foundation pit?
If you set the tower crane foundation in the foundation pit, which is based on another piling, the general is to help the wall of the tower crane (unless your project in the free height under it), so far away from the foundation by the wall distance set.The two tower cranes are all supported by piles and steel lattice columns in the foundation pit. The distance is determined by the distance between the outer edge of the main structure and the supporting wall.
Q:What is the inspection certificate for tower cranes?
Inspection certificate of tower crane must have two certificates:1, the manufacturer issued its own "product quality certificate"2. The product quality supervision and inspection certificate issued by the Technical Supervision Bureau
Q:What type of tower crane does not include tower crane in variable amplitude mode?
Tower crane, tower crane.Tower crane according to its different types, there are the following classification methods.(1) divided by structure type of fixed tower crane by connecting a fixed tower in the foundation or structure, tower crane lifting operation.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range