Tower Crane for Sale,Tower Crane Price manufacturer factory price TC5010

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
50 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

TC5010 Description

Feature: Tower Crane

Condition: New

Application: Construction

Rated Loading Capacity: 4 ton

Rated Lifting Moment: 400 KN.m

Max. Lifting Load: 4 ton

Max. Lifting Height: 120 m

Span: 3-47 m

Place of Origin: Shandong, China (Mainland)

Brand Name: Meida

Model Number:  TC5010  tower crane

Certification: CE, ISO, SGS, GOST

Warranty: 12 months

After-sales Service Provided: Engineers available to service machinery overseas

Material: Q235b

Electrical components: Schneider

section dimension: 1.5*1.5*2.2 m

Power: 26.7 Kw

Rated hoisting capacity max radius: 0.8 ton

Working environment temperature: -20 to +55

Free standing heigh: 29 m

Jib length: 47 m

Machinery weight: 19.5 ton

Color: yellow or optional

TC5010    Features

1.Thirteen years of experience in supplying new self-erecting tower crane with Huiyou Brand.

2. Export to more than 20 countries with CE/ISO/GOST Certificates.

3. Stationary/Travelling, external/ internal climbing tower crane 

4. Impeller blasting/rust protection paint

5. Advanced painting process

6. Potain masts designed with dismountable panels, making teansport easier and cheaper. 

7. New designed mast, can be used to Internal and external climbing tower crane

8. Famous brand mechanism system, Schneider Electronic control system, jiangte and jiuhe motor

9. Engineers available to service machinery overseas.   

TC5010   Specification

 Tower Crane for Sale,Tower Crane Price manufacturer factory price TC5010

TC5010   Pictures

Tower Crane for Sale,Tower Crane Price manufacturer factory price TC5010

Tower Crane for Sale,Tower Crane Price manufacturer factory price TC5010

Tower Crane for Sale,Tower Crane Price manufacturer factory price TC5010

TC5010   FAQ

Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.


Q: What is 3 main mechanism of the tower crane?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.


Q: What can we do for the clients in the market and after-sale service?

A: There is branch office for us in the kingdom and she could provide any commercial assistance for the clients; our exclusive agent would fully represent lifting machinery for business communication and rapid & professional technical support.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:how to install a 1km high stack with a crane?
use a heavy lift helicopter, these are especially designed for this work
Q: why use 'and to also making the cranes', not 'to also make the cranes'?
To also make the cranes is the correct way to say it. To also making the cranes is incorrect.
Q:A crane that docks is capable of doing 550 J of work. How high can it lift a load that weighs 45N?
A crane can lift it's rated limits to full extension. Provided 45N is within it's rated capacity, it can lift it as high as the crane can lift items.
Q:why are siberian cranes endangered?
The traditional migratory and wintering habitats of this species are under constant pressure from the demands of the growing human population. These include: agricultural development, wetland drainage, oil exploration, hunting, and water development projects. The western population is primarily threatened by hunting whereas the eastern population is at risk from loss of wetland habitat.
Q:What are the differences between the tower crane and the lift?
Tower okorder.com) is a construction machinery.In modern building construction projects, It plays a principal role, most flamboyant machinery. As long as there is construction, there will soon be aGiant throngs, holding a flags, such as a great man, calling on the various large and small project officers, and calling on the various project teams. Lifts, in modern constructions, the role of the lift is also very important, it can replacea lot of features of the tower crane.
Q:Cranes or storks?
Depends on where you live ? Stick to Ornamental Pheasants or Ducks,Storks and Cranes,need to be penned in at night because you will have to pinion them to prevent them flying. Try some Golden Pheasants for a try ,Lady Amherst are becoming a rare commodity and are quite expensive,if you have Foxes and Mink,then no matter what you get you will have problems these two predators.
Q:In dragon ball, Why is master crane evil in the filler?
The idea is that Crane Hermit is a selfish man that would do anything to get what he wants. In the past, Master Mutaito was there to ram some discipline in his head and have him under control. Following the events of his death and the defeat of King Piccolo, nothing could really stop him from being a selfish jerk again. Roshi probably didn't mention Crane being bad before King Piccolo's arrival because he wasn't really evil before it either. He was selfish and greedy, but not outright despicable as later... at least not that much. Roshi seeing Crane as a friend might imply that Crane had some redeeming qualities during his years as Roshi's rival under Mutaito's guidance. About their baldness, I think they shaved their heads after a while due to how monks and some martial artists tend to shave their heads. That or it's a plot hole due/filler error. It's again either a plot hole/filler error or they just switched outfits once they reached a certain level of their training, just like how you gain a different color of band as you progress in Judo and Karate.
Q:Who should defend God, Denny Crane or Alan Shore?
Why oh why do you guys always blame God for man's actions? Oh, so dumb!! There is something called the conscience that God has placed in every human being. We should know right from wrong and often and most times people choose to do what is wrong. Your conscience is God's way of telling you which one to choose. That is where He speaks to us. You will be judged for your actions by your conscience and by the Almighty God.
Q:How to change the mechanical property unit of crane (tower crane)?
Measures for the record and registration of construction hoisting machineryArticle 1 These measures are formulated in accordance with the provisions on the supervision and administration of the safety of construction cranes' machinery (Order No. 166th of the Ministry of construction) in order to strengthen the management of the record and registration of construction cranes.The construction and registration of the hoisting machinery as mentioned in the present Measures shall include the registration of the lifting machinery, the installation (disassembly), the notification and the use of the registration of the second.Third construction departments of the people's governments at or above the county level may use the computer information management system to handle the registration and registration of construction hoisting machinery, and establish a database.The construction administrative department of the local people's government at or above the county level shall provide the registration and registration and inquiry service of the building hoisting machinery within its administrative area.Article fourth rental, installation and use of units shall be submitted in accordance with the provisions of the lifting of construction machinery registration information, and the authenticity of the information provided by the responsible.The construction administrative department of the local people's government at or above the county level shall establish a system for the examination and registration of the hoisting machinery.Fifth construction machinery rental units or purchase building lifting units (hereinafter referred to as the "property units") in the construction machinery rental for the first time or before the installation, should be registered at the competent construction Department of the local people's governments at or above the county level to the unit of business (hereinafter referred to as the "equipment registration authority") for the record.
Q:have you seen the spongebob episode pizza delivery skill crane or the splinter the most?
Well, Skill Crane is my favorite, but it doesn't come on that much. I think they play the Splinter WAY too much. (Oh, and also they play the one with the Salty Spitoon too much.)

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range