Topless Tower Crane with High Quality and Competitive Price

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
20 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Descriptions of our tower crane:

1, TC4808 have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition. With their working radius from 2.25 to 48m, TC4808 tower cranes are famous for their large operating ranges, varied working methods and wide uses.  

2,This series of tower cranes has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism.

3, It is original in design, reliable in operation and satisfactory in shape.

4,Equipped with all necessary safety devices, these cranes show a good speed-control capacity,, satisfactory operating stability and high work efficiency.

5,They are widely applied for the construction of high-rise hotels, resident buildings, high-rise industrial buildings, large-span factory buildings and tower like buildings like tall chimneys. Best after sales service will be offered which will get rid of all your worries in the purchase of our products

 

Advantage of our tower crane:

1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, suitable for the group of tower cross homework.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

ItemParameter
Unita=2a=4
Rated hoisting momentkn.m400
Working radiusm2.5-48
Load capacity at max radiust0.8
Max load capacityt4
Hook heightIndependent type / Traveling typem31.5 / 32.5
 Anchoraging type12070
Working speed Hoistingm/min70/35/735/17.5/3.5
  Trolleyingm/min20/40
Slewingr.p.m0.31-0.6
Travelingm/min12.5-25
HoistingKW15/15/3.5
Mechanism powerTrolleyingKW2.2/1.5
SlewingKW2.2×2
TravelingKW1.7×2

 

TC4808 with CE ISO certificate top kit 4T types of tower crane price for sale

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Tower crane body standard section connection bolt screw upward or downward, why?.
A few days ago, a special training course of mechanical equipment, a safety supervision station old experts say the screw from the upward wear, stress is the same, but if the nut screw will fall off, in order to find problems. If you can't get it off the top and bottom nut, you won't find it
Q:Under what circumstances does a tower crane require third party testing?
New installation, demolition, close, major transformation, the use of site work committee, the use of factories to the Technical Supervision Bureau
Q:How to fix the cable on the tower of QTZ125 type tower crane?
segments can be fixed after solving this problem, usually with plastic copper (with insulating layer) and insulator is fixed on the tower body section,
Q:Brief introduction of ten no hanging criterion for tower crane operation
1, hanging weight more than no mechanical properties allow the crane; 2, the command signal is unknown, the weight is unknown, the dim light to hang; 3 working face, stand or floating active objects not hanging;
Q:Minimum QTZ63 tower crane special electric box open for many A
Tower crane (tower crane) is called tower crane, also known as tower crane, originated in Western europe. A revolving crane mounted on top of a tall tower. The working space is large, mainly used for the vertical and horizontal transportation of materials and the installation of building components during the building construction. It consists of three parts: metal structure, working mechanism and electrical system. The metal structure includes the tower, the boom and the base. The working mechanism has four parts, lifting, luffing, turning and walking. The electrical system consists of motors, controllers, power distribution cabinets, connecting lines, signals and lighting devices, etc..
Q:Tower crane 10-5-20 is 6T, and 10-5-21 is 8T. What do you mean by tons?
6T/8T refers to the maximum lifting capacity of a tower crane. It doesn't matter what 10-5-20 has to do with it. Maybe your list of numbers is serial number.
Q:Tower crane (tower crane)
In the form of the structure for the tower type, flat type and movable arm type. The model can be divided into QTZ63 suspension, QTZ80 crane, QTZ125 crane, QTZ crane, 315 crane and so on according to the moment division. Now used to arm length + tip weight of the way named, for example, 5513, that is, the longest length of 55 meters arm, the tip of the largest weight of 1.3 tons.
Q:Operation points of tower crane (tower crane)?
Safe use requires the use of tower crane, issued by the state competent authorities shall abide by the rules and regulations, but also comply with the relevant provisions in the manual: the crane working environment temperature is -20~40 degrees Celsius, the maximum working pressure is 205N/m2, when should stop using the winds of more than 6 level; the same construction site to install more than two sets of tower crane when should pay attention to the location of each tower, take the elevation of different operations, in order to avoid the tower crane jib, balance arm collision accidents; safety device of tower crane, luffing and slewing height, mass and moment limiter, the last two more important, if the two is not detected qualified, will be regarded as the unqualified, because it plays a role to ensure the safety and prevent the tilting of the tower crane. As a construction site, the tower crane torque limiter failure or to replace the operating personnel mistakenly believe that daily only hanging 800-1000kg materials, not what the risk, the results in a process of lifting materials, because of the construction site is narrow, hanging by the operator sight blocked, hanging objects hanging on building the steel frame, caused by tower crane shaking, was the occurrence of major accidents, thanks to the ground work riggers promptly notify the operator immediately stop to avoid rollover accident of tower crane appeared. It is obvious that all safety devices on the tower crane are essential and must be checked regularly to ensure that all the safety devices are in good condition, sensitive and reliable.
Q:What is a TQ80 tower crane?
To put it simply, QTZ is updated than the TQ model, and the TQ series first appeared in 70s, and the QTZ series came out in the 80,90. Various parameters must be more advanced than TQ.
Q:About tower crane torque limiter with 4 limit switches, each play a role, thank you
Lifting weight limiter: limit maximum lifting weight;Torque limiter: limit the maximum lifting torque;Height limiter: limits the maximum and minimum position of the hook lifting and lowering;Amplitude limiter: limit the lifting trolley in the boom on the outside, the inside position;Slewing limiter: limit of up to the number of rotating ring arm;

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range