TC4021 8T Luffing Tower Crane with CE ISO Certificate

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Descriptions of our TC4021 8T Luffing Tower Crane with CE ISO Certificate


1, the topless tower crane reduce the dismounting requirements, lower weight, low mounting height, dismount each mast at a time in the air, save the labor cost, safety and fast.

2, it is suitable for crossover work of the cranes, without the tower cap and pull rod, the safety will be increased when there need the crossover work.

3, It is suitable for the special requirement about the height, such as airport nearby, tunnel, workshop ,and the construction site with high-tension cable.

4, It is suitable for the construction site that has the requirement about the crane boom, it can be used as internal climbing crane in the high-rise buildings, irregular roof or small areas.

5, It is very convenient for dismounting in the restricted construction site, dismount each crane boom at a time by manual.

6, The steel structure of crane boom has long using life and high safety standard.

7, The crane boom is good applicability, high-usage,the design of the topless tower crane boom is easy for realizing the serialization and standardization. Reduce the design and making cost.

8, Low design cost, short cycle, can much better satisfy the multiple demands of the customers.


Advantage of our TC4021 8T Luffing Tower Crane with CE ISO Certificate


1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.


Features of our TC4021 8T Luffing Tower Crane with CE ISO Certificate


TC4021 8T Luffing Tower Crane with CE ISO CertificateTC4021 8T Luffing Tower Crane with CE ISO CertificateTC4021 8T Luffing Tower Crane with CE ISO CertificateTC4021 8T Luffing Tower Crane with CE ISO CertificateTC4021 8T Luffing Tower Crane with CE ISO Certificate


TC4021 8T Luffing Tower Crane with CE ISO Certificate

FAQ TC4021 8T Luffing Tower Crane with CE ISO Certificate

1. why chose us?

China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various

kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.

 

2.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

3. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

4.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.   

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Reason why some contruction cranes/wrecking ball cranes use tires.?
It really depends on the terrain or the platform where this crane will stand.. If it is in a muddy or sandy terrain, then they may opt to use a chain tire. Cranes, dont merely rely on the tires. Cranes use outriggers. These are the extending arm of the crane. This hydraulically operated mechanism goes out of the cranes body, extends and extablished itself at four corners and sits at the ground to provide leverage for the cranes. This will prevent the crane to overturn when it is doing the operation.
Q:What kind of tower cranes are available? How about the scope of all kinds of tower cranes?
Tower crane is divided into fixed tower crane, mobile tower crane, jack up tower craneThe mobile tower crane is divided into track type, tire type and automobile typeThe jack up tower crane is divided into two parts: internal climbing type and attached typeUsage: loading and unloading concrete by hanging tank for general construction and installation
Q:Explain how the idea of a counterweight used in cranes or in stand up basketball hoops relates to the concept of torque and equilibrium?
Sure. Let's say that a crane needs to hoist a load of 10 tons, and that because it needs to reach over some obstacles, needs to lift at a horizontal distance of 50 feet away. That creates a torque about the base of the crane of 500 ton·ft. By positioning a counterweight on the opposite side of the tower, the magnitude of the moment can be mitigated. For instance, let's say a counterweight of 10 tons is positioned at 25 ft on the other side of the tower. The moment produced by the counterweight is 250 ton·ft, so the net moment at the base is 250 ton·ft. Furthermore, when the 10 ton load is positioned and release, there is still a 250 ton·ft moment at the base of the tower; it has simply switched direction (say from rotating the crane to the right, to rotating it to the left). If you find this helpful, please award Best Answer!
Q:How illegal is it to climb a crane?
Not at all if you don't get caught. However cranes are private property, you'll get your a.ss handed to you if you get caught.
Q:Do cranes eat squirrels?
I do love the variety of questions that crop up on YA! The things you learn.... My immediate thought was, Sandhill Cranes do not eat squirrels. Then I thought, well, they eat fish. So I looked it up: Yes, Sandhill cranes eat snails, insects, small reptiles, amphibians and RODENTS (that's squirrels, folks!).
Q:what eats Sandhill Cranes?
Predators of the sandhill crane include man, feral dogs, wolves, and coyotes (Canidae), crows and ravens (Corvidae), hawks and eagles (Accipitridae), jaegers (Stercorarius spp.), raccoon (Procyon lotor), alligator (Alligator mississippiens), bobcat (Felis rufus), black bear (Ursus americanus), river otter (Lutra canadensis), and snakes
Q:how do you raise cranes?
Tower cranes are usually erected in one of two ways. You could lift the parts into place with a mobile crane with a telescopic boom which is taller than the crane being built. Some people ask why you dont just use the mobile crane all the time, but the tower crane has higher lifting capacity, longer reach and is cheaper. Some tower cranes are assembled at ground level. The long boom, cab and counter weight are assembled and then jacked up off the ground. A small bit of tower is then sliped in beneath the assembly and attached. The crane is the jacked up again and another portion of the tower sliped in. This is repeated until the desired height is reached. The first method is the most common.
Q:How many meters of cranes should be in accordance with the anemometer?
In accordance with national regulations, outdoor cranes need to install anemometer.Specific provisions"GB6067.1-2010 crane safety regulations", 9.6.1 anemometer and wind speed alarm9.6.1.1 high speed cranes for outdoor work shall be equipped with an anemometer. The anemometer shall be located upwind of the upper part of the crane.9.6.1.2 high speed crane for outdoor operation should be equipped with an air speed alarm that displays instantaneous wind speed, and when the wind speed is greater than the working wind speed setting value, the alarm signal should be sent out.
Q:What happened to White Crane?
I can't comment on the people you mentioned. What I can say is that White Crane is a good style. BUT, it was never as popular as arts like Goju-ryu, Shotokan, Shito-ryu, and many others. It is curious that Wikipedia would say something like the style is less popular. But then I have always taken what I see on the internet with a grain of salt. Anyone can post any thing they want on the net. That does not make it true.
Q:how did charles darwin influence stephen cranes writing?
Influenced by Darwin’s Theory of Evolution, Crane believed that people’s actions were determined by environmental factors rather than by conscious choices on their part. He believed also that conflict was the crucible in which human development occurred, and thus was attracted to the violent and seamy aspects of human experience.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range