Sampling Cooler/ Enfriador de Muestros/ Cooler for Samples for Boiler Water

Ref Price:
Loading Port:
Nanjing
Payment Terms:
TT OR LC
Min Order Qty:
10 set
Supply Capability:
100 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Sampling cooler used for boiler room or soda assay sample cooling

 power station, the water in the boiler and heating system mostly 

higher temperature, and high temperature is not convenient to 

sampling, also not easy to determine, in the sample should be cool,

so let's introduce the sample of sampling point sampling cooler for 

cooling, general requirements to ensure traffic in the 500-700 ml/min, 

the sample can take a 30 to 40 degrees cold, satisfy the People's 

Republic of China power industry standard DL/T 457-457.
Sampling tubes adopt stainless steel tube, can not use carbon steel or 

brass tube, in order to avoid the sample is in the process of sampling

tube of metal corrosion products pollution.
Sampling cooler is suitable for the high temperature of the liquid and 

gas media such as sampling, has a compact structure, high heat transfer

efficiency, convenient washing, long service life, etc.

Specifications and Models:

QYL-133/0.3 QYL-159/0.35 QYL-219/0.45 0.38 QYL-273/0.55

1: sampler for stainless steel tube and shell for carbon steel.
2: the sample cooling pipe generally choose diameter 10, 12, 14, 16, 18mm 

(or the user specified) interface optional welding and flange, 

cooling water interface for DN25, external thread.
3: the general selection is often: QYL - 159/0.32, and QYL QYL - 219/0.40-273/0.54.
4: whether to need to be combined (i.e., whether to support, water tank, valves, etc.).

Types of sampling

1. Boiler water sampling
Boiler water sample generally removed from the sound of continuous 

drainage tube, led to the cooler again.Sampling points should be near 

the outfall to elicit the exit of the drum, as far as possible and as far 

as possible in a drum derivation after first before discharge valve.
2. Water sampling
After water sampling points generally located in the feed water pump, 

high pressure feed pipe economizer before, should be in a small pipe, 

vertical pipe to pipe connect water supply samples which led to the 

sampling cooler.After water sample tube should be located in feed

water dosing enough to each position.

3. The water sampling
Water sampling points on general in the exit of the condensate pump,

the condensate pipeline, should not be installed in the entrance of the 

condensate pump, because of the entrance of the condensate pump 

pressure below atmospheric pressure.
4. The hydrophobic sampling
Hydrophobic general sampling in the drain tank.Sampling points are usually 

located in around 300 mm from the bottom of the drain tank.
Samples by sampling cooler, 5 will steam condenses into water.Steam in the sampler 

flow generally for 20 to 30 kg/h.Demand for sample which leads to the catheter and 

cooler, the same as the water sampling.

FAQ

We have organized several common questions for our clients,may help you sincerely:

①How about your company?

A world class manufacturer & supplier of castings forging in carbon steel and alloy steel,is one of the large-scale professional investment casting production bases in China,consisting of both casting foundry forging and machining factory. Annually more than 8000 tons Precision casting and forging parts are exported to markets in Europe,America and Japan. OEM casting and forging service available according to customer’s requirements.

②How to guarantee the quality of the products?

We have established the international advanced quality management system,every link from raw material to final product we have strict quality test;We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.

③How long can we receive the product after purchase?

In the purchase of product within three working days, We will arrange the factory delivery as soon as possible. The pecific time of receiving is related to the state and position of customers.Commonly 7 to 10 working days can be served



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How do I find someone to auction electrical engineering equipment?
Perhaps try an OKorder seller, or let a friend or relative put it on OKorder. It is quite a bit of work to sell on OKorder properly, but if you give then half the proceeds, you both might win! Another approach is to bring it to a large city electronics swap - all kinfds of electronics geeks come to these and you will gets lots of advice on value.
Q:What are the specific requirements for an electrical engineering drawing?
Certain groups like NASA, the US government, etc have specific requirements for all drawing including electrical drawings. Some engineering companies and industrial companies have standards as well. Basically any engineering drawing has to address to tasks to be done, the materials and equipment to be used, the codes and standards to be met, and any specific requirements that are over and above common practice. A specific requirement might be something like stating the color coding for wiring that could be unsual. Look at the results of a simple online search for more information.
Q:Resistors problem plz help ?
english.cxem.net/infrared/ir3-5.g Anita
Q:Crossword: (5 letters) Fire extinguisher?
WATER!!! no? Novec is another one like Halon
Q:In view of the EMP technology that some countries have, why can't we harden electrical lines and equipment?
First of all, the cost of producing an EMP weapon that could effectively disrupt equipment in an area larger than a few square meters would be astronomical. Second, it would be much more effective to initiate a cyber attack which could produce exponentially more damage than an electical magnetic pulse. Third, electrical lines generate significant amounts of EMI and EMF so it really is not necessarry to harden them. It wouldn't really proctect them, they don't need it. By harden I assume you mean EMP sheilding typically used in military sytems?
Q:where can i find electrical equipments in kathmndu, Nepal?
you have to go to asan you kind find many stores selling them. You just go to asan and ask for anyone there they will tell you the way correctly.
Q:does the brass pin conduct electricity?
This Site Might Help You. RE: does the brass pin conduct electricity? does it or not losers?
Q:Are surge protectors really necessary?
Most electronics or electrical devices in the average home only have fuses or circuit breakers as safeguards. They are meant to protect your electrical wiring or prevent fires, not protect the equipment. An electrical surge or spike (they are different things) won't necessarily trip a fuse or circuit breaker, and even if it does, the damage to your equipment may all ready have happened. A surge protector is designed to handle and dissipate this type of event and protect the equipment.
Q:Calculating The Correct Alternator For My Sound System?
Ideally , you want an alternators output amperage to be equal to the maximum amperage draw of all of your amplifiers plus about 40 amps to run the rest of the electrical equipment in your car. So if your amplifiers draw 150 amps at full power you would want a 190 amp or larger alternator. If you can not get a alt. that large , extra batteries can help fill the gap. The rule of thumb for batteries is one cca of battery power per watt of amplifier power.
Q:Stock 2000 Monte Carlo fuse keeps popping?
The fuse is a safety mechanism it will burn or pop as you say before damage can occur to the electronic component if it continually pops/ burns out that usually means there is a short in the wiring or on the part itself. Electrical problems can be a real pain in the a$$, even if you are experienced. So if you are not mechanically inclined I suggest not to try to track this problem down by yourself.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range