FZQ1650 Tower Crane

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

FZQ series anchorage luffing-jib tower crane is a sort of large crane applicable for thermal power, hydropower, nuclear power, petroleum, chemical industry, metallurgy, high-rise steel structure and other erection of large-scale construction projects, especially suitable for tower boiler lifting in power station and construction of tall buildings at narrow site.
To meet the requirements in different operating conditions, FZQ series tower crane has been successfully developed such as FZQ1380, FZQ1650, FZQ2200, FZQ2520. This series of products adopt advanced production technology and design concept featuring in high technology content and excellent performance, which keeps pace with international advanced level, and has gained tens of China national patent technology.
The pedestal of this series crane adopts box-type structure resulting in non-concrete foundation, which reduces the foundation treatment cost.
This series tower crane adopts advanced anchoring method and structure that the anchoring location can be flexibly adjusted to a wide application range.
The connection of tower section adopts “HALF” quick-type structure, which simplifies assemble and disassemble process. The standard section and anchoring section can be interchangeable owing to the same geometry dimension.
Boom system is manufactured of fine-grained ultra-high strength alloy steel pipe with significant reduction in weight; the mast is made of high-strength low-alloy steel pipe that provides the crane with compact structure and strong lifting capacity.

The hoisting mechanism adopts international renowned brand gearbox and Lebus drum, which guarantees its good performance; the electric control introduces full frequency conversion to realize fast, stable and non-impact operation.

The crane is equipped with complete safeguard devices to realize multi-protection for safe operation.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is tower crane? What are the types and features?
[definitions]Tower crane (tower crane) is called tower crane, also known as tower crane, originated in Western europe. A revolving crane mounted on top of a tall tower. The working space is large, mainly used for the vertical and horizontal transportation of materials and the installation of building components during the building construction. It consists of three parts: metal structure, working mechanism and electrical system. The metal structure includes the tower, the boom and the base. The working mechanism has four parts, lifting, luffing, turning and walking. The electrical system consists of motors, controllers, power distribution cabinets, connecting lines, signals and lighting devices, etc..
Q:How high the tower crane needs to be installed with the wall pole. How is it stipulated in the national standard?
The construction of tower crane installation, operation and dismantling safety technical regulations "(JGJ196-2010) design provisions in article 3.3 attachment device of tower crane: when the tower crane attachment for use, attachment device settings and free height should comply with the provisions of the instructions; when the attachment level distance, attachment spacing does not meet the the instructions should be carried out, design calculation and drawing the map produced and written instructions; the attachment device and embedded parts shall be the original component manufacturer or made with the corresponding ability of the enterprise; the attached device design, the main structure of the building to support the checking.The regulations on the supervision and administration of the safety of building cranes (Ministry of Construction No. 166th) states: "it is prohibited to install the standard sections and attachments of non original manufacturing plants on the free construction lifting machinery.".The independent height of the tower crane is determined by the manufacturer's manual. The independent height of the tower cranes of different manufacturers and different types is different. The installation of the tower crane needs to be installed with a wall rod. The specifications are stipulated in the instruction. The national standard requires the instruction of the manufacturer's manual.
Q:Tower crane and tower crane 5
Tower crane, tower crane, also known as tower craneTower crane = tower crane = tower craneThere are many ways of vertical transportation. Construction elevator hoist etc..Tower crane features: large operating space, mainly used in housing construction materials vertical and horizontal transmission and installation of building components.It consists of three parts: metal structure, working mechanism and electrical system. The metal structure includes the tower, the boom and the base. The working mechanism has four parts, lifting, luffing, turning and walking. The electrical system consists of motors, controllers, power distribution cabinets, connecting lines, signals and lighting devices, etc..
Q:Tower crane TC6013A-6-A2, what does "A-6-A2" mean later?
TC6013A-6-A2:TC is the abbreviation of tower crane, and 6013 is crane lifting moment, which means that 60 meters long arm tip can lift 1.3 tons. A says Model 6 means lifting capacity of 6 tons. "A2" means code.
Q:What is the difference between crawler crane and tower crane?
Tower cranes are generally used in high-rise building construction. They are self elevating and attached. The boom is very long and the construction site is very common. Multi story buildings can be replaced by automobile cranes.Crawler cranes are used in municipal engineering, such as subways, bridges and so on. Lifting weights can be moved.It's very easy to tell from the outside, so you can search for some pictures.
Q:Which is the main basis for the disassembly and assembly process planning of tower cranes?
.0.11 tower cranes should be prepared before the installation of special construction program, and should include the following contents:1 project overview;2 installation location, plane and elevation;3 types of tower cranes and technical parameters of performance;4 basic and attachment device settings;5, climbing conditions and adhesion nodes detail;6 installation sequence and safety quality requirements;7 weight and suspension position of main mounting parts;8 installation of auxiliary equipment type, performance and layout;9 power settings;10 construction personnel allocation;11 rigging and special tools;
Q:What is the brand of ZOOMLION tower crane?
How big is the lift? It depends on the size of the motor you use. 24KW motor, the choice is about 100A. 30KW uses 125-150A, 55KW, and 150-180A;Generally 40A contactor is used for turningCar selection of 25A on it.
Q:Examples of filling and acceptance forms for tower cranes and examples of filling in.
The 1 conclusion is "qualified" project, fill out the "tick".2, the conclusion is "unqualified" project, fill in "x"". Part of the "unqualified" sub item should also be painted on its number *".
Q:In what circumstances should a tower crane be demonstrated by an expert?
Three, lifting and installation, demolition works(1) use of unconventional lifting equipment, methods, and lifting weights of a single piece in excess of 100kN and aboveHeavy lift works.
Q:When the tower crane foundation is found, what should be discontinued?
The settlement, inclination and cracking of tower crane foundation can affect the stability of tower crane and should be stopped

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range