• Factory price china yuchai diesel generator sets 360kw System 1
Factory price china yuchai diesel generator sets 360kw

Factory price china yuchai diesel generator sets 360kw

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
300 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specifications

open type dioesel generator with yuchai enginee 
1) Factory direct sale 
(2) CE, ISO9001 quality 

Power range

18-650KW

Engine

All series powered by Yuchai engine

Alternator

All series owning alternator options of Stamford/Marathon/ENGGA

Controller system

Hanging control box, automatic control module Smartgen HGM6310

Base frame

International channel steel welded base, inbuilt composite damping system; sandblast, acid-washing, antiseptic treatment

Radiator

Standard genset-joining radiator of 40 °C ambient temperature

 

 

Diesel generator Powered by Yuchai Engine,which yuchai is a large state-owned enterprise and a Nasdaq listed company in USA (NYSE:CYD). Its main business covers diesel engine, contruction machinery, vehicle parts. The engines produced by Yuchai include series YC6G, YC4G, YC4E to which American technology applied, series YC6A, YC6B, YC6J, YC4B, YC4D, YC4F, YC4W to which German technology applied, and YC6M series in which world top technology integrated, totally 12 series.

YUCHAI SeriesPower(KW)Power(KVA)Jichai Engine ModelCylinder NO.Fuel consumption
g/kw.h
DimensionL*W*HWeight  
 KG
FKS-Y360360200YC6G245L-D206≤1952500*970*15002300


Q:1. Both fans are running2.Both fan is running 3.Both diesel generators were serviced 4.Both diesel generator was serviced5.Both diesel generators had been serviced. / Has been servicedWhich one is correct, and why?
Both fans are running is correct. You are talking about more than one item, therefore the plural are is correct. Both diesel generators were serviced is correct, for the same reason. The first part of the last sentence, both diesel generators had been serviced is also correct if you are talking about the past historic tense.
Q:I want to shut it inside a small room, but will it not suffocate ? Which part of the gen set should be moved out of the room ?
The size is relevant. Is this a small portable set for homes, or a large stationary unit for a building. I'll assume the latter. Enclose it in a sound barrier, but bring the exhaust out the top and make an air inlet at the bottom that goes to the air intake of the engine. You may need additional openings for ventilation to keep the engine from overheating. You may be able to bring the radiator outside the enclosure to solve that problem. Make sure you have a very good muffler. Look into finding a better one. You may be able to buy an enclosure for the generator, check with the manufacturer. PS, you seem to have this located indoors. That is a very bad idea.
Q:I was offered a job in the same general posistion for a YOUNG company that has offered me 15.00 more a hour, lead position, training in a differnt brand of the same product I work on and, basicly the freedom to choose my own hours (avg. 40-55 hrs). Or do I stay where I am at were I have some stabability, lead position, unstable hours (avg. 40-65 hrs plus nights away from home/family), possabilities of advancment and, a since of loyalty to bosses. Note: I worked hard to get where I am at, however, my current knowledge is the bases for new job. WHAT DO I DO????????????
It all depends on you. If you want to get paid more and have more free time with your family then choose the new job but if you want to have a stable job and not have as much time with your family then stay with your job. If i was you I would go to the new job but thats just me.
Q:Did some searching, and found little other than single, model specific, manuals (either paper or on CD). The paper manuals are $50-60 each. Single model PDF manuals on CD are about $20.Does anyone know if a comprehensive set of shop service manuals is even available for Yamaha Portable Generators? (gas and diesel) I don't mind paying, but I don't want just ONE manual, I want 'em all. That way I don't have to go through this again when a different model Yamaha comes into my shop. TIA for any help!:-) ?
try okorder
Q:Have a big V12 Diesel Generator what is the purpose of the governor / actuator and also the Speed and Load Controller?
The governor keeps the motor from running faster than a set rate, an actuator receives an input from a button and causes a mechanical device to engage. Speed and Load controllers determine how fast the generator motor should turn over for a certain electrical demand, as in number of devices plugged in to the electric socket.
Q:I want to ask that how much fuel does a diesel generator consume in one hour?How can I calculate the fuel consumption?
it consume 10litre
Q:i have Diesel generator100KVA , how many air conditioner of 2 tons (i phase)i can use with this generator without overload
you need to look at the power requirements of the air conditioner of 2 tons it should indicate it's power requirements.
Q:I have a diesel truck as well as a 25,000 watt diesel standby generator for my home. I'm curious if they will be affected should a solar flare zap us. I'm not too well versed in the whole solar storm issue.
no its diesel and not electric
Q:Aside from the fact that they just had a massive natural disaster and there resources are stretched to say the least, what is main reason they cant get the reactor under control?From what I've heard it's not receiving enough power to maintain cooling system so it can maintain controlled fission.In my limited understanding it seems the plant survived relatively unscathed other than there diesel generators being flooded/destroyed. The plant is currently on battery backup's which I assume are relatively large and cant just be switched out to maintain the cooling system. Is it just an issue of supplying enough power for the cooling system? Couldn't they park the the USS Ronald Reagan off shore there and borrow some power until stabilized, considering you could power a sizable city off its reactor?
the tidal wave was created by a nuke detonated in the ocean. They might have had a bomb inside the nuke plant. Now think of tidal waves and attacks against nuclear plants. If a whole nuke plant goes up you'll have nothing over 1,000 mile radius. It's time to close these plants.
Q:I'm a student majoring in Architecture one of my class, Building Utilities, needs me to survey a high rise building. In my team, we divided the parts bc there are so many and one of my job is to electricity. Can someone explain to me the meaning of phase, R.P.M, power factor, and (especially) their respective units/numbers from this picture
Phase is 3Φ 4W, which means three phase, four wires. Three wires for each of the phases and one wire for the neutral. There are two ways to connect 3 phase generators, ywe which looks like the letter Y (3 or 4 wires) or delta which looks like a triangle (3 wires). Voltage is 380/220V, which means a wye-connected generator with two voltages available. For heavy loads like heating and motors, a line voltage of 380V, measured across two of the phases, is available. For light loads like lights and outlets, a phase voltage of 220V, measured across a phase to neutral, is available. The use of 380V means smaller conductors can be used. When the generator spins at 1500rpm (revolutions per minute), the output frequency is 50Hz. N 120 f / P P 120 f / N 120 * 50 Hz / 1500 4. The generator has 4 poles per phase. Since it is an even number, the generator is a synchronous generator. Prime is the Apparent Power S in kVA that the generator set is capable of providing for an unlimited number of hours per year. In this case 600kVA. But as a Standby Generator (Emergency) operated less than 500 hours/year, the apparent power S is 660kVA. Current is 1003A. This is the rated current that can be supplied to the building at 380/220V. S √(3) V_LINE I_LINE I_LINE S / (√(3) V_LINE) 660kVA / ( √(3) * 380V) 1003A Power factor 0.8 lagging, which means at worst case the loads attached to it can have a power factor greater than 0.8. Power factor P / S. P S * pf 660kVA * 0.8 528kW The Real Power P or W loads the generator can supply are 528kW. So it can supply 5280 100W light bulbs, for example. If power factor is 1, 660kW could be supplied. There should be an electrical switchboard close to the generator, which will have labels showing how power is fed throughout the building. Everything else is specific to the device (Model, Serial, etc). Probably too much information for you, but when you are trying to understand something too much is better than too little.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches