Crane TC5610 Construction Equipment Wholesaler Sales

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Tower Crane TC5610 Details:

Minimum Order Quantity:     1unit                                            Unit:     unit                            Loading Port:     China main Port

Supply  Capability:         5unit/month                                                                Payment    Terms:      T/T   or  L/C


Tower Crane TC5610 Description:

1.CMAX Tower Crane TC5610  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC5610  can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC5610 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC5610  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC5610  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC5610  Parameter:

 Max. working range 56m, tip lifting weight 1T and Max. lifting weight 6T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 41.5

Max height with attachment (m) 141.5

Working range can be adjusted (m) 44、50、56

Min working range (m) 2.5

Max lifting capacity (t) 6

Tip load @ 50m (t) 1


Tower Crane TC5610   Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC5610 Diagram:

Crane TC5610 Construction Equipment Wholesaler Sales

Crane TC5610 Construction Equipment Wholesaler Sales

Tower Crane TC5610 Technical Sheet:

Crane TC5610 Construction Equipment Wholesaler Sales

Tower Crane TC5610 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC5610 for example, the first two letters “TC” means Tower Crane, “56”means jib length is 56 meter, and the last two letter “10” means the tip load is :1 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.


 



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to change the mechanical property unit of crane (tower crane)?
Measures for the record and registration of construction hoisting machineryArticle 1 These measures are formulated in accordance with the provisions on the supervision and administration of the safety of construction cranes' machinery (Order No. 166th of the Ministry of construction) in order to strengthen the management of the record and registration of construction cranes.The construction and registration of the hoisting machinery as mentioned in the present Measures shall include the registration of the lifting machinery, the installation (disassembly), the notification and the use of the registration of the second.Third construction departments of the people's governments at or above the county level may use the computer information management system to handle the registration and registration of construction hoisting machinery, and establish a database.The construction administrative department of the local people's government at or above the county level shall provide the registration and registration and inquiry service of the building hoisting machinery within its administrative area.Article fourth rental, installation and use of units shall be submitted in accordance with the provisions of the lifting of construction machinery registration information, and the authenticity of the information provided by the responsible.The construction administrative department of the local people's government at or above the county level shall establish a system for the examination and registration of the hoisting machinery.Fifth construction machinery rental units or purchase building lifting units (hereinafter referred to as the "property units") in the construction machinery rental for the first time or before the installation, should be registered at the competent construction Department of the local people's governments at or above the county level to the unit of business (hereinafter referred to as the "equipment registration authority") for the record.
Q:Tower crane attached concrete pump can be? Are there any state regulations?
The state expressly states that it is not possible to have serious safety incidents in Hunan and Zhuzhou before
Q:Tower crane 4 how to change the rate of 2 magnification, how to change, say detailed points
There is a magnification pin on the hook group. When the magnification pin is removed, the pulley will automatically slide to the lifting trolley. At this point, the rope will be turned into 2 fold!Some manufacturers produce pulley, also need to be in the car, and then the magnification pulley with pin shaft fixed in the car!
Q:Emergency treatment of interrupted electricity during lifting of tower crane
When the power supply fails, you should first remove the things that are stuck in the gear!
Q:Which is the main basis for the disassembly and assembly process planning of tower cranes?
.0.11 tower cranes should be prepared before the installation of special construction program, and should include the following contents:1 project overview;2 installation location, plane and elevation;3 types of tower cranes and technical parameters of performance;4 basic and attachment device settings;5, climbing conditions and adhesion nodes detail;6 installation sequence and safety quality requirements;7 weight and suspension position of main mounting parts;8 installation of auxiliary equipment type, performance and layout;9 power settings;10 construction personnel allocation;11 rigging and special tools;
Q:Does tower crane belong to special equipment?
Tower crane is a high-altitude operation, the type of work belongs to special types of work, equipment belongs to special equipment.
Q:Brief introduction of ten no hanging criterion for tower crane operation
1, hanging weight more than no mechanical properties allow the crane; 2, the command signal is unknown, the weight is unknown, the dim light to hang; 3 working face, stand or floating active objects not hanging;
Q:What is the standard weight of a tower crane for 1.6*1.6*3 and 1.6*1.6*5m? Kg?
The standard weight of tower cranes for 1.6*1.6*3 and 1.6*1.6*5m is 500KG
Q:What are the main parameters of a tower crane?
For car luffing tower cranes, the maximum lifting height is only related to the height of the tower, and when the height of the tower is determined, the maximum height of the ceiling is a certain value.In addition to the 4 major performance parameters. And the working speed (including lifting speed, rotary speed and walking speed of car, traction speed), an important parameter gauge, wheelbase, total power, motor structure weight, balance and gross weight, etc.. These important parameters often determine the tower crane selection, such as speed of operation often determines the number of selected cranes, motor power requirements of power supply load, gauge, wheelbase of the site, and the structure weight, balance weight, weight of the foundation treatment of heavy machine requirement.Tower crane (tower crane) is called tower crane, also known as tower crane. A revolving crane mounted on top of a tall tower. The working space is large, mainly used for the vertical and horizontal transportation of materials and the installation of building components during the building construction. The tower crane consists of three parts: metal structure, working mechanism and electrical system. The metal structure includes the tower, the boom and the base. The working mechanism has four parts, lifting, luffing, turning and walking. The electrical system consists of motors, controllers, power distribution cabinets, connecting lines, signals and lighting devices, etc..
Q:What is the minimum radius of a tower crane?
Luffing jib crane luffing mechanism to control the lifting radius, which is lifting and landing boom.At the minimum radius, the boom is angled to the vertical.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range