• 60/10 Topkit 10 Tons Tower Crane for Construction System 1
  • 60/10 Topkit 10 Tons Tower Crane for Construction System 2
  • 60/10 Topkit 10 Tons Tower Crane for Construction System 3
60/10 Topkit 10 Tons Tower Crane for Construction

60/10 Topkit 10 Tons Tower Crane for Construction

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
20 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Description of our Tower Crane

The tower crane is a combination of advanced technologies of the present day. The electric control system of the tower crane adopts the advanced “PLC + frequency converter” control mode of the present day, which has realized the stepless speed regulation and greatly improves the reliability, maneuverability and stability of the control system and the work efficiency of the tower crane.

TC 5511 tower crane belong to upper-swing hydraulic climbing tower crane with horizontal jib, winch-jib. All kinds of performance parameters and technical items are up to or better than the National Standard. The max radius is 50m. Independent loading-lifting height is 30m. Attaching loading-lifting height is 121m. The rated load moment is 630KN.m .

Advantage of our tower crane
1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.
2, suitable for the group of tower cross homework.
3, boom stability is good, combination amplitude range.
4, suitable for height have special requirements occasions construction.
5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

Specification of Tower Crane

Tower crane TC 60/10

Model:

TC60/10

Free standing height:

59.8m

Mast section type:

2*2*3m

Mast section composition:

1*7.5m basic mast+17*3m mast

Maximum capacity:

10T

Jib length:

60m

Tip load:

1.4T

Telescoping cage:

Included

Chassis:

Not Included

Hoist winch:

70RCS25

Slewing mechanism:

95SVT

Trolley winch:

4TVF

Cabin:

Cabin as your requirements

loading:

3*40'HQ

Loading port:

TIANJIN

 

60/10 Topkit 10 Tons Tower Crane for Construction

60/10 Topkit 10 Tons Tower Crane for Construction

 

Q:Just curious... I'm not in construction and always wondered...
little pieces by welly chopper
Q:i need the names of the organisms. like names of insects or fish or what ever they eat. give the organism's name. don't just say fish or insects. i need specific names.this is for a biology project.
Diet okorder /.. I'm sorry, I couldn't find any specific names, but here are some general ones. Sorry again.
Q:I've recently finished folding my 1000 paper cranes. I herd that there is a shrine in japan that takes them. Anybody know where that place is and the information I need to have to send them?
The most common place to take them is the Hiroshima Peace Memorial Park. They have a monument dedicated to a girl who was affected by the bomb and died from cancer. Her name was Sadako and they have these glass cases that people from all over the world put their 1000 cranes in. Here's a link to their website... www.pcf.city.hiroshima.jp/index_e2.html You might have to call first...good luck!
Q:tell me how to do it, in the easiest way
It's okorder /
Q:i just ordered a new JG 614 crane stock and do not know how to use the crane stock i would like to learn before it arrives can i have a link to a video or explanation please
Try reposting in the 'toys' or 'airsoft' section. This section is for men with real guns.
Q:the cable of Crane I creates and angle of 30 degree angle from the horizontal and the cable of Crane II creates an angle of 45 degrees from the horizontal.-draw a figure that gives a visual representation of the problem-write a vector to represent the tension on the cable of Crane I-write a vector to represent the tension on the cable of Crane II-write a vector to represent the 20000 lb cargo container being lifted -calculate the tension on both cables. Justify your answer.....please help me!!! thank you!!!!:)
All I can say is.. Big crane make big thing go up.
Q:anyone can tell me the common steel tube material using for crane boom, both main chord and lattice boom. thanks !
Most aerial cranes (Erickson Skycrane) are used for tasks such as remote location work or expedious work. It takes awhile to erect a crane for one air conditioner unit to be replaced on top of a 5 story building or to replace a cable on a wire bridge. They are also widely used for fire supression.
Q:Does anyone know where I can order Sugar Crane to grow?
Crane? anyway,, if your store has those little pieces you can buy to eat? or if you know someone with canes,, you strip off the hard outer covering,, this has the seed buds,, plant these in 3 inches of soil and wait,, cane is slow growing!! if you google sugar cane growing or go to wikipedia you will find plenty of info google buy sugar cane seeds you will find sites to order!!
Q:so yeah i know that cranes do the main work but i guess there are no such really toll cranes to do that with skyscrapers ?
That is a good answer. Ordinary cranes build the steel frame to a height of perhaps 60 feet. The frame is designed so a specially designed crane can climb up the side (like climbing a ladder) to about 50 feet where the climbing crane can complete the frame to about 100 feet, then the crane can climb to the 90 foot level and build the frame to about 150 feet etc. Another method is the floor at about the 60 foot level is completed and extra strong. A crane is assembled on that floor and can complete the steel frame to about 100 feet where another extra strong floor is built. The crane at 60 feet is then dismantled and moved to the floor at the 100 foot level, or perhaps this is a second crane. Repeat until the full height of the building is frame work. As cranes are removed at the lower levels, more floors can be installed and some of the finishing work done. Either way, you can see why very tall buildings are very expensive. Likely both methods are used for some very large and very tall buildings. Neil
Q:I was given a CCRadio and I have no idea what it is or what it does.The guy that gave it to me says it's an Awesome DXing radio (whatever that means). The display doesn't work but other than that the radio works fine and pulls in alot of stations the previous owner said. Can anyone help me understand what a CCRadio is and what it does? Thanks to all that contribute.
C Crane Company sells shortwave receivers. You can use it to listen to shortwave broadcasts, marine weather, NIST time signals, foreign broadcasts, clandestine broadcasts.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords