10t Topkit Tower Crane TC6016 CE and ISO9001 certified

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
2 unit
Supply Capability:
200 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Specifications

1, 18 years' manufacturing experience 
2, ISO9001 and CE; 
3, Alibaba gold supplier; 
4, on time delivery 
5, near from Shanghai

 

 TIP TOWER CRANE: TC6016/TC5420/TC4825 (QTZ125), 10t

 

Parameter:

 

ItemParameter
Rated hoisting moment1250kn.m
Working radius2.5-60m
Load capacity at max radius1.6t
Max load capacity10t
Free standing height50.5m
Max attached height200m
Working range adjustable48m, 54m, 60m
Hoisting
mechanism
(VFD+PLC)
Falls24
Lifting capacity(t)0-2.50-50-50-10
Speed(m/min)0-800-400-400-20
MotorYZPBF250M1-6-45KW
Hoisting
mechanism
(VFD+PLC)
Speed(m/min)0-56
MotorYPBE132S-4-5.5KW
Slewing
mechanism
(VFD+PLC)
Speed(m/min)0-0.6
MotorYTW112M-4-4KW*2
Climbing speed(m/min)0.5
Counterweight(t)48m jib54m jib60m jib
15.4517.8518.9
Mast section size(L*W*H),m2*2*3, panel style
Working temprature-40°C to 60°C
Max working wind(m/s)20
Total Power(KW)60
Rated working voltage & current380V/116V


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Is it difficult to test tower cranes?
A tower crane installation scheme, 1, compilation basis, project overview, working environment, 2 workers and 3 endurance calculation and installation equipment for 4, installation procedures, methods and requirements for 5, commissioning record 6, two safety technical measures, safety technical disclosure, three installation foundation concrete test report of four, the tower crane installation and acceptance of table five, safety supervision station issued a permit for six, seven, demolition demolition project safety technical clarificaiton tower crane installation scheme project name: preparation: position (title): Approval: job (title): the construction unit: tower crane installation demolition project, the preparatory work before construction: 1. The tower crane installation position, according to the effective range of the construction requirements, site conditions and the role of tower crane, convenient installation and disassembly, the tower crane configuration in 17 axis to 18 Between the axis, away from the outer wall of 5 meters, with 11 standard section. 2, the basis of the principle, the use of concrete foundation, strictly according to random basis drawing. 3, the examination of concrete pressure report, tower foundation has been completed by design and construction, the safety group acceptance, the basic test block delivery, after the test pressure qualified, must be installed. 4. The installation site is level and the channel is repaired. 5, transport parts admission
Q:How much is a team of 40 tower crane
Tower crane rental generally do not rent pricing, can not count number, not today is installed, removed tomorrow!Usually on a monthly basis, with or without use!
Q:Tower crane demolition safety technical disclosure, how to write?
Baidu search:Tower crane removing and lowering joint safety technical disclosure.
Q:Tower crane 4 how to change the rate of 2 magnification, how to change, say detailed points
At this point, the rope will be turned into 2 fold!Some manufacturers produce pulley, also need to be in the car, and then the magnification pulley with pin shaft fixed in the car!
Q:How to explain and classify the types of tower cranes? What do QTZ80 and Q5510 mean?
80 is lifting torque of 800 KN.M, 5510 is 55 meters, big arm of the front crane 1 tons
Q:How to calculate the pouring and maintenance of tower crane concrete in valuation?
Calculated according to actual concrete quantity. According to the design plan of the visa and construction organization.
Q:What is the safe distance of a tower crane to the surrounding buildings?
The latest specification is that the tower crane is 4M from the proposed building.According to the safety regulations of tower craneRegulation 10.3: the tower crane tail and the surrounding building and its surrounding construction facilities between not less than 0.6m.Article 10.5 stipulates: between the two tower cranes of minimum distance should be erected to ensure that at least 2m in the distance between the tower crane boom end and another tower crane tower; the most part of the high tower crane (hook up to the highest or lowest part of the balance weight) should not be confused with the vertical distance of tower crane at in between the highest position of the components is less than 2m.The latest specification is that the tower crane is 4M from the proposed building.The distance from the tower to the building shall be considered:1, the slewing radius of the tower itself.2. The distance between the double shelf of building and tower crane.3, double shelf and tower crane safe distance.4, according to the specific type of tower crane to determine the specific.
Q:What is the scrap standard of tower crane hook?
The hook shall be scrapped at any time in the following circumstances:Crackle;The wear of the dangerous section is 10% of the original size;The opening ratio is increased by 10% than the original size;The twist of the hook is over 10 degrees;The dangerous section of the hook or the neck of the hook produces plastic deformation;The hook thread is corroded;When the hook bushing is worn at 50% of the original size, the bushing shall be replaced;The mandrel shall be replaced when the hook mandrel is worn at 5% of the original size.
Q:About tower crane torque limiter with 4 limit switches, each play a role, thank you
Hook top point control: when the hook to the high limit, limit action, do not continue to hook!Overload control: when the weight exceeds the overload point or amplitude exceeds the maximum amplitude or the loading rate is more than 105% when the output control, prohibit the hook lifting action and prohibit car distance to allow the car to increase the amplitude, amplitude can be damped near.
Q:What is the rental price of a tower crane? General site rental more, but also buy more? Ask the industry for an answer?
Is the site of the tower crane is not, the crane company specializes in the construction site is rented, the price range depends on the length of your period, due to demolition of the problem, I am not a professional, but I am working at the site, only know so much

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range