UV Proof Safety Fence for Pool and Swimming Pool Fence
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 500 m
- Supply Capability:
- 10000 m/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
UV Proof Safety Fence for Pool and Swimming Pool Fence
Fence is a striking addition around garden flower or lawn areas.It can not only beautiful the environment but also reduce the fee of maintenance .
1. It can keep good looking for years which are longer than wood fence.
2. You need not to paint or stain. And it can resist being fade.
3. Strong point: aluminium steel inser to reinforce the fence.
4. Our products are environmental friendly and non-toxic.
5. We can offer any length or size according to your needs.
Specification:
Post:4-1/4"sq(108mm*108mm)
H':4-1/5'(1281mm)
W':8'(2440mm)
Rail:3-1/2"*2"(89mm*51.6mm)
Picketcket:1-3/8"sq(35*35mm)
Rails:2
Pickets:17
Styles:Picket top/Flat Bottom w/cap
UV Proof Safety Fence for Pool and Swimming Pool Fence show :
Factory Capacity :
Trade Items Of Field Horse Fencing
Packing: | 1. Envirnment PE bag export packing |
2. Carton as customer's request | |
Transaction: | T/T,L/C,D/A,D/P, Western Union |
Payment Term: | FOB,CIF,CFR |
Port: | China main port |
Delivery time: | supply quick delivery time, normally 15 working days |
Sample Cost: | Free sample cost |
Sample Time: | Small piece sample one day, full section sample 2 days |
Service:
1.Sample can be offered with free sample charge and courier fee by buyer's side.
2.We have full stock and can deliver within short time.
3.OEM and ODM order are accepted, Any kind of logo printing or design are available.
4.We offer you the different types of product.
5.Good Quality + Factory Price + Quick Response + Reliable Service, is what we are trying best to offer you.
6.All of our products are produced by our professional workman and we have our high-work-effect foreign trade team, you can totally believe our service.
7.We are very glad that customer give us some suggestion for price and products.
FAQ:
Why choose us ?
1.Commpletely production line. From raw material to delivery, all fences have passed strict tests, so the quality can be assured.
2.Delivery time: about 7 days for a 20ft container.
Where is our main market ?
The products are exported to Northern America, Australia, Canada,Europe and so on.
- Q: Driving into the guardrail for an hour, to the scene to escape it?
- 4., although the injured party traffic accident to the hospital, but did not report and leave the hospital without cause;5., although the injured party traffic accident to the hospital, but to the injured or their families leave a false name, address, false contact, leave the hospital;6. traffic accident parties during the investigation into hiding;7. the traffic accident party leaves the scene and does not acknowledge any traffic accident, but there is evidence to prove that it should know the traffic accident;
- Q: What do you think of people crossing the traffic barrier for personal convenience?
- Crossing the traffic barrier is one of the most dangerous uncivilized behaviors. It is understood that, for the convenience of crossing traffic barriers, there is a security risk exists fluke
- Q: The role of traffic barrier
- The protection of roadside buildings, pedestrians, drivers and passengers in the car safety, both at the same time, the increase of traffic safety induced by the sight of the driver and beautification highway environment effect.
- Q: Determination of traffic accident responsibility for pedestrians crossing guardrail
- In this case, pedestrians should bear the main responsibility for your negative responsibility, but the responsibility of traffic police, and you will let you bear the main responsibility for negotiation, even full responsibility, so the insurance company will pay more than a little, because your car insurance is insurance, the insurance company will according to your responsibility for claims the medical expenses, including pedestrians and cars you money.
- Q: Traffic, driver's license subjects, in the highway driving vehicle crash barrier, what protection measures?
- It should hit the side of the collision. Because if at high speed, the speed will be soon after the collision, to the upstairs said will be in the opposite direction. At this time, if you have the opposite direction direction, the car will deviate from the more powerful, will let the car in the middle of the road! And, in case the car stops and stops in the middle of the road, it's more likely to cause two accidents, which is more dangerous! So, the correct thing is to hit the side of the collision and stop by the guardrail
- Q: Should a guardrail be installed on a high embankment with a radius less than the radius?
- In the highway and a highway, in order to avoid collision and pedestrian and vehicle, the vehicle shall be installed to prevent intrusion to traffic barrier and prevent pedestrians crossing the Lane Lane protection network in accordance with the regulations, all levels of highway embankment, bridge approach, minimum limit radius, steep slope area should be set up barriers or warning pile.In order to induce the driver's line of sight and ensure the safety of driving, a sign is used on the required section to indicate the edge and alignment of the highway. In poor visibility, sharp bends and intersections could be combined with other safety assurance measures, set up signs, mirror or lane etc..
- Q: How much is it per meter per meter for guardrail of highway bridge?
- 4.6.2 stipulates that the width of the guardrail expansion joint should be consistent with the main structure of the bridge"
- Q: Hello, I would like to ask June 24th my car just hit a roadside barrier when viewing and did not hit people directly drove away but in September 5th when police went to my house, I hit someone and then buckle my driving license and driving license and car but the police refused to show the camera is that my butt is this going on?
- (five) collision of buildings, public facilities, or other facilities.Property damage accident, and has fifth cases, the vehicle can move, the parties can alarm, in the principle of ensuring the safety of the scene photos or marking parking position, the vehicle moves to traffic in the waiting place
- Q: Who needs the highway, the quarantine rail, the fence, the traffic barrier, the continental barrier, the prison separation gate and the airport?
- Because the fence column height is lowered, it is recommended that the column spacing be 4m, which is set at 5m, then 201 per kilometre; if 4 meters are set, 251 columns per kilometre, that is, 50 columns per kilometre. Mesh and wire in the rural village near people around the network activity, should adopt the metal mesh or steel net. Therefore, type nets are not harmful to humans. The design shall be made of lower density (0~60cm high), 10 * 15cm hole and sparse (60~120cm high) isolating net, 20 * 30cm hole, so as to save material and save cost. But because the cost of the steel mesh is higher than that of the metal mesh, and the aesthetics is slightly worse, and the adaptability to the complex terrain is relatively weak, the high-speed road on the domestic construction has been rarely adopted at present. A metal mesh mesh, welded mesh fence, pull three, is more commonly used in welding net. There are two types of welded nets: roll net and mesh net. Because the roll net is simple to install, the whole strength is high, and the adaptability to the complex terrain is strong (the mesh can be cut arbitrarily), the roll screen should be recommended in the general design. In the mountainous areas, forest areas, pastoral areas and other sparsely populated areas, barbed wire is cheaper due to barbed wire type.
- Q: In November 26th I caused a traffic accident damaged guardrail section five isolation belt (about ten meters long way), damage to the more than 21 thousand municipal list list, but the insurance company only with loss of 7000 or 8000 yuan, the reason is the two municipal 5K unreasonable valuation plate (only one side of the plate loss picture, the other side no pictures). The two sides deadlocked, my car has been unable to handle the relevant procedures for portable vehicles. How do I deal with such a thing? The two sides of Municipal Insurance have been dragging. What should I do?
- The law stipulates the procedures for handling road traffic accidentsWithin five days from the date of the conclusion of the forty-fourth inspection and appraisal conclusion, the traffic administrative department of the public security organ shall notify the party concerned to collect the detained accident vehicle, motor vehicle driving permit and the seized articles.Escape to the driver of the main vehicle or by notice thirty days after the parties still do not receive the vehicle after the announcement three months is still not to accept the deal, to detain the vehicle in accordance with the law.
Send your message to us
UV Proof Safety Fence for Pool and Swimming Pool Fence
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 500 m
- Supply Capability:
- 10000 m/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords