Tower Crane TC7135 Building Wholesaler Sales
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Tower Crane TC7135 Description:
1.CMAX Tower Crane TC7135 is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.
2. Tower Crane TC7135 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.
3. Tower Crane TC7135 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
4.Tower Crane TC7135 has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on.
5.Tower Crane TC7135 has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.
Tower Crane TC7135 Parameter:
Max. working range 71m, tip lifting weight 3.5T and Max. lifting weight 16T.
Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.
Trolleying mechanism can provide two operation speeds.
Free standing height (m) 50
Max height with attachment (m) 200
Working range can be adjusted (m) 50、55、60、65、71
Min working range (m) 2.5
Max lifting capacity (t) 16
Tip load @ 50m (t) 3.5
Tower Crane TC7135 Packaging & Delivery:
40HQ container
20~25days after deposit
Tower Crane TC7135 Diagram:
Tower Crane TC7135 Technical Sheet:
Tower Crane TC7135 FAQ:
1.What is tower crane?
Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.
2. What is the meaning of the tower crane’s code?
Take Tower Crane TC7135 for example, the first two letters “TC” means Tower Crane, “71”means jib length is 71 meter, and the last two letter “35” means the tip load is :3.5 ton.
3. What is the principal to quote the right tower crane to the client?
First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.
- Q: the title. the battery --- 9.6v 2000Mah INT NIMH Crane Stock Battery. will this fit in an echo 1 crane stock? the desc. said its designed for GG and SRC crane stocks, but may fit in other crane stocks.
- yeah, all crane stock battery's are pretty much interchangeable.
- Q: For example, self lifting tower crane mounted to 10 meters or 2 floor use. How do you install the third floor now? Is it necessary to remove the crane?. Then add the length of the steel frame on the base seat, and then install the crane above him If so, then 2 cranes are needed. But how is another crane installed?Ask you experts on the construction site of self lifting tower cranes how to install?. Do you use hydraulic jacks like car jacks?
- Since it is self lifting, as the name suggests, it is on its own power that no other crane can rise. It has a special elevated section, a hydraulic device, the upper section rises, the middle empty time section, with his arm to be added to the festival hanging near the artificial it fixed, so that a section of the rising of the. Is to support themselves, and then in the middle plus standard section.
- Q: Tower crane 4 how to change the rate of 2 magnification, how to change, say detailed points
- There is a magnification pin on the hook group. When the magnification pin is removed, the pulley will automatically slide to the lifting trolley. At this point, the rope will be turned into 2 fold!Some manufacturers produce pulley, also need to be in the car, and then the magnification pulley with pin shaft fixed in the car!
- Q: Well,i just LOVE this piece of origami work...I've tried so many (kinda the same) instructions but i always get confused on the step 3-4...do you know any easy instruction,with clear explanations for a begginer?thank you already~~
- visit okorder / that's the place where I learned folding paper cranes. XD I've always loved them.
- Q: What kind of equipment must be installed on luffing trolley of horizontal luffing tower crane?
- It must be installed:To prevent the trolley cable broken car slip away;The car must have a support wheel to prevent the trolley from hanging in the middle.
- Q: I alsways see projects where there are these massive cranes sitting on top of huge buildings...how they hell do they get them up there?
- With more massive cranes. Sometimes, they will put them up in pieces - and assemble them on top of the building.
- Q: Whats does the japanese crane symbolize?
- The Japanese crane symbolizes serenity and hope. It is a legend in Japan that if you fold 1000 paper cranes, any wish will come true. There is a story about a girl named Sadako who died from radiation in Hiroshima after WWII who tried to fold 1000 paper cranes to be brought back to health. She nearly folded 1000, and died before then. People come to Hiroshima still today with 1000 folded paper cranes to honor Sadako.
- Q: Lifting mechanism in tower crane: M5. Luffing mechanism: what does "M4" mean? Seek expert answers
- It is the work level of the organization, representing the working hours and load sizes of the institution. See GBT/13752 or GBT/3811 for specific explanations.
- Q: Vtwin doc helped me out with this dam thing recently Im thinking he has the 411! So here goes: My friends coil went bad and we used a single fire coil on a dual fire ignition. V twin doc showed me how to do that. But it still doesnt quite run proper. So here are the settings:Its set at 5900 R.P.M. limit,with advance slope at 9.the rear cylinder is set at 0.Its set on dual fire,its set on electric start.and its set on multi spark not single.Its a crane fireball hi 4e model 8-3100. It cranks for a bit before starting and runs a little rough at low R.P.M. ran just fine with the stock coil.
- Crane Fireball Ignition
- Q: Tower crane, this model inside each letter number represents what meaning, ask the great God to inform.TCT7527-20, TC6015A-10E
- The basic parameters of the tower crane: a working range: refers to the center of rotation of the lifting hook up center and tower crane horizontal distance. Two, weight: rated lifting weight and maximum weight. The maximum rated lifting weight refers to the biggest boom in quality to allow the minimum amplitude of the tower crane, is one of the main technical parameters of the tower crane. Three, lifting...
Send your message to us
Tower Crane TC7135 Building Wholesaler Sales
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords