Timer Beam FORMWORK SYSTEMS for Indonesia Customer

Ref Price:
Loading Port:
Guangzhou
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
10000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Specifications

Flange: Spruce
Thickness of Web: 27mm(+/1mm)
Poplar Plywood web in WBP glue
Painting: Yellow Waterproof Paint

H20 TIMBER BEAM

 

H20 BEAM(I-BEAM)

Flange: Spruce
Thickness of Web: 27mm(+/1mm) 
Poplar Plywood web in WBP glue 
Painting: Yellow Waterproof Paint 
Length: from 1m to 6m

Length longer than 6m can be special ordered.

Application: Formwork

 

Specifications

Item

Formwork H20 Timber Beam

Wing Material

Imported spruce solid wood, finger-jointed and glueing according to DIN 68140-1

Web Material

Multilayer poplar plywood

Head Protection

Injection molding plastic head

Glueing

Finger-jointed between wings and web pursuant to approval notice Z-9.1-146

Moisture Content

less than 12% at the time of delivery

Surface Protection

The complete beam is waterproofed using a water-repellent color glaze

Color

Yellow or as customer's request

Wing Size

80x40mm

Standard lengths

2.45 / 2.90 / 3.30 / 3.90 / 4.90 / 5.90 m (Max.length:6.00m)

Mechanical Specification

Modulus of elasticity : E 11,000 N/mm2

Shear modulus : G 600 N/mm2

Packing

Pallet or in bulk

Application

Level formwork system, Vertical formwork system, Adjustable formwork system, Curve formwork system, Irregular formwork, etc. 

Timer Beam FORMWORK SYSTEMS for Indonesia Customer

Timer Beam FORMWORK SYSTEMS for Indonesia Customer

Timer Beam FORMWORK SYSTEMS for Indonesia Customer

Timer Beam FORMWORK SYSTEMS for Indonesia Customer

Timer Beam FORMWORK SYSTEMS for Indonesia Customer

Timer Beam FORMWORK SYSTEMS for Indonesia Customer

Timer Beam FORMWORK SYSTEMS for Indonesia Customer

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How do the welding parts in the welding drawings of the machine parts indicate the technical requirements of the drawings?
With what groove related, open groove is not the same, marking is not the same, "welding structure" reference to our specialized courses
Q:Changsha Sanlian Building Machinery Fittings Factory
In addition, you can check the input path, or the name of the unit on the map. It will remind you that there is no unit in Changsha and no way. In addition, we received a fax, saying that you want to order what goods, may wish to go to the other party's local industrial and commercial Red Shield network to check whether there is this unit
Q:What are the mixing arms of the concrete mixer?
Mixing arm concrete mixer is a component of the mixing arm itself and divided into lateral mixing arm (positive and negative points), stirring arm (also have positive and negative points), stirring arm below is the bearing seat connected, connected with 4 sets of high strength bolts with stirring arm. The top is equipped with wear-resistant mixing blades, connecting with mixing blades, high-strength bolts 2 sets. In addition, some manufacturers have designed mixing side bonded shaft swivel, is installed in the interval between the stirring arm fixed and rotated in two ways.
Q:China mechanical net
There are mechanical product development and design, mechanical equipment transformation, mechanical equipment maintenance, data inquiries, standard inquiries, mechanical professional translation, mechanical CAD and other mechanical and technical services.
Q:What are the mechanical drawing software?
The plane is mainly CAD and CAXA, there are some non mainstream mechanical engineer what, mainly engaged in your spare parts of machinery industry, roughness, form and position tolerance requirements, recommendations for CAXA, which symbols are readily available, there are standard parts library, mechanical symbols library etc..
Q:How are the machine parts stacked?
Then there is a point to note, that is, from there to get used, must be put back where, so that will be organized, all things are owned by you, it will not mess.
Q:How are buildings, installations and materials divided?
Provisions on the division of equipment and materials for engineering construction? [answer] the division of equipment and materials in engineering construction is directly related to the reasonable division of investment structure, budget preparation and calculation of construction output value. In order to reasonably determine the project cost, strengthen the investment in the process of construction and management, the equipment and materials in the engineering construction is unclear, especially the universal controversial common problems and put forward the principle of division of fifteen copies of "national unified installation project budget quota" of the equipment and materials are divided, the provinces, autonomous regions and municipalities directly under the central government and the relevant departments of the State Council, the Department should be combined with the local situation, formulate rules for its implementation, and report to the Ministry of construction for the record.
Q:What are the safety protection equipment, machinery and equipment, construction machinery and accessories for construction enterprises?
Different types of work, security appliances are not the same. For buildings, the main safety helmets, safety nets, safety belts (San Bao), etc., for electrical operators, mainly insulated shoes, insulating gloves, insulation rod, insulation table, etc.
Q:What are the main functions of construction equipment monitoring system?
To date, the console has always been built into blocks, in terms of control functions and number of cameras. Can be assembled according to requirements. In addition, the character generator is also arranged in the total time and address on the console, the date and time, minutes and seconds are displayed by this device, and be put in place to monitor the address and name display. It can be recorded on the video recorder, so that it will be convenient for future reference.
Q:What is the difference and connection between equipment manufacturing and machine building?
When our company went to the training center of the Department of industrial engineering of Tsinghua University, the professor of Qinghua University told us about it. Equipment manufacturing industry is a general term for the equipment provided for the national economy and national security

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range